RELAI RELAI DIUSULKAN ( nilai sekunder ) ( nilai sekunder ) Differential SIFANG CT150 = 300/1 A; CT20 = 2000/5 A Relay + REF CSC-326 HV dan LV HV PARAMETER Internally Auto Trans 0 Control Word Two-Wind Trans 0 Control Word CT Fail Detect 1 Control Word HV Wind Conn/Y-0 D-1 0 MV Wind Conn/Y-0 D-1 0 LV Wind Conn/Y-0 D-1 1 Vet Grp Angle 1 SN 60.0 MVA HV UN 150.0 kV HV VT Ratio 1500.0 HV CT Pri 300.0 A HV CT Sec 1.0 A HV Voltage Chan Sel 1 MV Voltage Chan Sel 2 HV NCT PARAMETER HV NCT Pri(REF) 300.0 A HV NCT Sec(REF) 1.0 A HV NCT Pri(BU) 300.0 A HV NCT Sec(BU) 1.0 A MV PARAMETER MV UN 20.0 kV MV VT Ratio 200.0 MV CT Pri 2000.0 A MV CT Sec 5.0 A MV NCT PARAMETER MV NCT Pri(REF) 2000.0 A MV NCT Sec(REF) 5.0 A MV NCT Pri(BU) 2000.0 A MV NCT Sec(BU) 5.0 A LV PARAMETER LV UN 20.0 kV LV VT Ratio 200.0 LV CT Pri 2000.0 A LV CT Sec 5.0 A LV Sec Inside Delta 5.0 A DIFFERENTIAL PROTECTION Func_Inst Diff 1 Control Word
1/2 Daftar Evaluasi Setelan Rele Proteksi Dibuat : Diperiksa : Disetujui :
Rev. 00 GI 150 kV XXX Tgl : Tgl: Tgl:
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK SISTEM JAWA BALI DI PT PLN (PERSERO) TRANSMISI JAWA BAGIAN TENGAH PT PLN (PERSERO) Doc. No. TRANSMISI JAWA BAGIAN TENGAH Komplek PLN Cigereleng - Bandung Valid. JULI 2018 DAFTAR SETELAN RELE PROTEKSI GI 150 KV XXXX
Func_Percent Diff 1 Control Word
Block Diff at Inrush 1 Control Word 2nd Harm Not Wave 0 Control Word Block Diff at Overexcit 1 Control Word Overexcit 3rd NOT 5th 0 Control Word Func_Diff Alarm 0 Control Word Block Diff at CT_Fail 0 Control Word HV D_side Eliminate I0 0 Control Word MV D_side Eliminate I0 0 Control Word LV D_side Eliminate I0 1 Control Word Diff Includes LV Cur 0 Control Word I_Inst Diff 6.16 A I_Percent Diff 0.231 A I_ResPoint1 Diff 0.77 A I_ResPoint2 Diff 3.08 A Slope1_Diff 0.0 Slope2_Diff 0.3 Slope3_Diff 0.8 Ratio_2nd Harm 0.15 Ratio_3/5th Harm 0.3 T_2nd Harm Block 20.0 s T_3/5th Harm Block 20.0 s HV REF PROTECTION HV Func_REF Trip 1 Control Word HV Func_REF Alarm 0 Control Word Block HV REF at HV 1 Control Word CT_Fail HV 3I0_REF 0.154 A HV Slope_REF 0.5 HV T_REF Trip 0.0 s HV 3I0_REF Alarm 10.0 A HV T_REF Alarm 5.0 s MV REF PROTECTION MV Func_REF Trip 1 Control Word MV Func_REF Alarm 0 Control Word Block MV REF at MV 1 Control Word CT_Fail MV 3I0_REF 0.866 A MV Slope_REF 0.5 MV T_REF Trip 0.0 s MV 3I0_REF Alarm 10.0 A MV T_REF Alarm 0.05 s
2/2 Daftar Evaluasi Setelan Rele Proteksi Dibuat : Diperiksa : Disetujui :
Rev. 00 GI 150 kV XXX Tgl : Tgl: Tgl:
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK SISTEM JAWA BALI DI PT PLN (PERSERO) TRANSMISI JAWA BAGIAN TENGAH