WEST QURNA| ~SECTION-L
IR— INSPECTION REQUEST
Contractor No.; AWQ0109
ExxonMobil |... ace
Produced Water Treatment M109 z
vocamion: 05.7, | RNOHRNOCECO052 | ees pare: 17 February 2017 DISCIPLINE: Ci
REF.SPECIFICATION:
1QWA-FT-NSPDS-00-040901 REV.1 EARTHWORK
ATTACHMENT /CHECK LIST IF ANY:
REF. DRAWINGS: !QWQ-CE1091-LDPLT-D7-0001 REV.)) DS7 PLOT PLAN
RFF. ITP: 1QWA-CE1092-CPQAC-00-000.CIVIL REV. 0 INSPECTION AND TEST PLAN
OTHERS REF.
NAME OF CONTRACTOR/SUBCONTRACTOR: | CPECCTALMADAR
DISCRIPTION OF WORK TO BE WITNESS:
Our request the inspection of the following works for certificate/witness that all tems has been properly executed in
accordance with approved procedures, specifications, drawings and all items has been coordinated with future works.
Witness to take samples for the third layer in DS7 (test 13 points).
‘COMMENTS:
“4
Zlaccerren
COACCEPTED WITH COMMENTS Oresecteo
works not ready
Clunacceptable inspection result
Osee comments
C1 Tick THIS BOX IF “NO” EMIL / SOC and if it is a “WITNESS” as per ITP,
(by ticking this box means CPECC needs to produce all the related documents and sign / close this 1)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
‘SIGNATURE S
At
SUBCONTRACTOR cece ‘coMPANY oTHeRs
PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME
Whale Waleed Ma Crome Hossein dae/
SIGNATURE: T SIGNATURE:
DATE: wl [ze CL
pate: (9-2-do1] | vate: (J. feb~ iy pare: