IR — INSPECTION REQUEST
WEST QURNA |= SECTION-1
Contractor No.: AWQ0109
ExxonMobil Project Title: jcc
Produced Water Treatment M109
LOCATION:
‘Antemina Batch | IRNO:IR No CE-CO028 | IRISSUE DATE: 05 February 2017 DISCIPLINE: Civil
Plant
SUBJECT: Witness INSPECTION REQUIRED DATE:06 February 2017 | TIME:10:00,
REF.SPECIFICATION: 1QWA-FT-NSPDS-00-040103 REV.O CONCRETE DESIGN AND CONSTRUCTION
: 1QWC-CE109i-CDFND-D7-0003 REV.1 FOUNDATION FOR PRODUCED WATER TANK
BEF DAW NSE: 107-ABI681053 PLAN SECTION & DETAIL
RFF. ITP: 1QWO-CE1082-CPOAC-00-0001 REV.C CIVIL INSPECTION AND TEST PLAN
OTHERS REF.: {QW-CE1092-KRTST-O0-0004 REV.O CONCRETE MIX DESIGN TEST REPORT
"ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/ALMADAR
‘Our request the inspection of the following works for certificate/witness that al tems has been properly executed in
accordance with approved procedures, specifications, drawings and all items has been coordinated with future works.
DISCRIPTION OF WORK TO BE WITNESS:
‘Sampling cement, gravel, sand and water as per the concrete mix to do all chemical and physical tests in AL-FAO
Central lab. Request witness for taking these samples in Antemina Batch Plant.
‘COMMENTS:
Meal idaey He Seng,
Caccerreo Caccerrep with comments GresecreD
Clwerkisnotready
Clunacceptable inspection result
see comments
C1 Tick THis Box IF “NO” EMIL / SOC and if itis a “WITNESS” as per ITP,
{by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
SUBCONTRACTOR oPece COMPANY oTwens
PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME
Ammon fakhir | My Bang Yossein stant
SIGNATURE: SENATURE 7
St "YE
6-2-2) vate: E-Feb G17 | pare:
‘SIGNATURE:
pate: 6 ~~ Zo|7 _ | pate