IR- INSPECTION REQUEST
WEST QURNAI—SECTION
Contractor No.: AWQ0109
ExonMobil =r. ES
Produced Water Treatment M109
LOCATION: 05-8 | IRNO:IR No CE-CO009 | IRISSUE DATE: 09 January 2017 DISCIPLINE: Civil
SUBLECT: Inspection INSPECTION REQUIRED DATE:10 January 2017 _| TIME:09:30
REF.SPECIFICATION: EARTHWORK IQWQ-FT-NSPOS-00-040901 Rev.0
REF. DRAWINGS: PLOT PLAN DS8 IQWQ-CE1091-CODET-D8-0001_Rev.0.
RFF. ITP: M109 -IQWQ-CE1092-CPQAC-00-0001 CIVIL INSPECTION AND TEST PLAN
OTHERS RE
[ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/AL MADAR
Our request the inspection of the following works for certificate/witness that all tems has been properly executed In
accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works.
DISCRIPTION OF WORK TO BE INSPECTED:
We have completed marking the tank IQD8-ABI681050 for the purpose of excavation works Request inspection
‘COMMENTS:
Zaccerren ClaccePTeD with comments Creiecreo
Clwork's not ready
Clunacceptable inspection resuit
Tisee comments
Tick THIS BOX IF “NO” EMIL /SOC and if itis a “WITNESS” as per ITP,
(by ticking this box means CPECC needs to produce all the related documents and sign / close this R)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
SuntoNTRACTOR cece COMPANY omic
Pan NAME aE: aT AE FATA
Aiba Actsan
Oe mspector Mu ba Thee Sah)
eRe SaTRE a aOTE
BL OES
DATE:9-1-2017 DATE: Jy (und 20/2 vate:Ny sell”
ELAN, ge
ear BaSurvey Report Detection
Table (3)
corrected coordinates carried out by us to project 109 in D $ 8 based on the coordinates
and Elev. submitted by the CEPCC Company . Using their Dual-frequency GB S receiver —
type
(topcon Hiper)
Remark
ie
abl
Achieved by Surveyor Thaer AL- Sahi