CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 March 2018) WUR MMP North
Contractor Order
No WO St Short Description
Company Number
CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 March 2018) RUR WKS North
Contractor Order
No WO St Short Description
Company Number
2 WUR WKS South 3496893 55 Sleeve Installation 16" 6D-79 & 6D-78
March 2018) WUR KRS
ROAD CROSSING 30" DRI-DMI PKM0.000-4.000 HCT-FOMN-CPL-30DRIDMI-1 30" DRI TO DMI PKM 0.000-4000
ROAD CROSSING IMP 30 DRI-DMI (EPL Package 2) PKM 12571 - 13155 PKM 12571 - 13155
PIPE SLEEVE 30" DRI TO DMI PKM 18751-23750 HCT-FOMN-CPL-36DRIDMI-3 36" DRI-DMI PKM18751-23750
COATING APPLICATION 30" DRI-DMI PKM 8.413-9.479 HCT-FOMN-CPL-30DRIDMI-3 30" DRI TO DMI PKM 7800-10000
( Package 1)
user:
ROAD CROSSING
PKM 15659 30"didalam
MNS TOJDE
DRI PKM 45.001-50.000 (147 HCT-FOMN-CPL-30MNSDRI-3 30" MNS-DRI PKM45001-50000
Yang diterima masukPAIRS)
kedalam RWL PACK 3
dan SR-nya belum
ROAD CROSSING 10"MNS TO DRI PKM 46.304-55.000 HCT-FOMN-GPL-10MDLDRI HCT-FOMN-GPL-10" MINDL TO DURI
diterima KRS
SLEEVE INSTALLATION 30" NBS MINAS TO DRI (14 PAIRS) HCT-FOMN-CPL-30MNSDRI-4 30" MNS-DRI PKM50001-55000
SLEEVE INSTALLATION 12" LBO-DRI PKM 30.001-35.000 HCT-FOMN-GPL-12LBODRI-7 12" LBO-DRI PKM30001-35000
SLEEVE INSTALLATION 12" LBO-DRI PKM 35.001-40.000 HCT-FOMN-GPL-12LBODRI-8 12" LBO-DRI PKM35001-40000
SLEEVE INSTALLATION 10" MDL-DRI PKM 13.000-18.000 HCT-FOMN-GPL-10MDLDRI-1 10" MDL-DRI PKM13000-18000
ROAD CROSSING 20" BKO - PEMATANG IBUL PKM 0 - 4.219 HCT-FOMN-CPL-20BKODMI-1 20" BKO - DMI PKM 0 - 4219
ACCESS ROAD SPOT CLEARING 10" MINDAL TO DURI PKM HCT-FOMN-GPL-10MDLDRI HCT-FOMN-GPL-10" MINDL TO DURI
2.549-4.850
NEW INSTALLATION PIPE SLEEVE CONDENS 6" CORRIDOR 5SE- DRI-PIPE-00399 Pipe,5SE-CGC-101-06-CVC05
5SW JOIN83-147(560 PAIRS)
SLEEVE INSTALLATION 30"DRI-DMI PKM 0.000-4.000 HCT-FOMN-CPL-30DRIDMI-1 30" DRI TO DMI PKM 0.000-4000
SLEEVE INSTALLATION 16" DDP-DGF PKM 0 - 2.430 (17 PAIRS) HCT-FOMN-GPL-16DRIDDP-1 16" DRI-DDP PKM0-2430
INSTALLATION PIPE SLEEVE 8 " CGC LINE NEAR R/C 6N-75 TO DRI-PIPE-00385 Pipe,6GN-CGC-403-08-NSC65
CGS-5 (70 PAIRS)
March 2018) WUR WKS South
SLEEVE INSTALLATION 16" 6D78N-PL 16" 6E35 (454 PAIRS) MNS-PL-M3-12-6D-79 & 6D-78 PL 12in 6F61-PL 16in 6E64
Planned Start Date Planned Finish
Loc 3 MOC Number Business Unit Lead Craf Fareps CPI
(Week 12) Date (Week 12)
Andi Rinaldo
H01 N/A 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Dedi Sukmara
Glundung S
H01 480236 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 480236 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 480743 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 306780 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 306803 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 N/A 19/03/18 23/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 456908 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 456908 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
D01 N/A 26/03/18 30/03/18 2500CP7321 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 306795 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Mukhlis M
B04 394409 19-Mar-18 23-Mar-18 2500CP1972 IM-PIPE-N Ruli A
Mukhlis M
B04 N/A 19-Mar-18 23-Mar-18 2500CP1972 EPL-CONS-NO Ruli A
David S
M01 453959 19-Mar-18 23-Mar-18 2500CP3931 EPL-CONS-SO Subagio
David S
M01 454342 19-Mar-18 23-Mar-18 2500CP3931 EPL-CONS-SO Subagio
Fareps Size Target in Week Mall Sleeve
PMCOW Local 11 UOM Total Welders
SMBR (Inch) 11 - 2018 Status
1. Saud.T
2. Dafris
Syafrizon 3. Barisman SLV 30 68 pair 18 OK
4. Akmal
5. Suanto
Zulhamdi 1. Sweden RCW 30 10 pair 2 OK
1. Juara
2. Alin Panjaitan
Zulhamdi RCW 30 30 pair 8 OK
3. Parasian Sinaga
4. Henri. TP
1. Juara
2. Alin Panjaitan
Zulhamdi RCW 36 30 pair 8 OK
3. Parasian Sinaga
4. Henri. TP
1. John K
Zulhamdi SLV 30 10 pair 2 OK
2. Desfrianto
1. John K
Zulhamdi SLV 36 10 pair 2 OK
2. Desfrianto
223.5 58
20 10
OK Area 8 OK OK N/A
OK OK OK N/A OK
OK 6D79 OK N/A OK
Maintenance Access Social Issues
Lifing Equipment Availability Readiness (Need PGPA or Not)
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT Uncovering
OK OK NOT Uncovering
OK OK NOT Uncovering
OK OK NOT Uncovering
OK OK NOT Uncovering
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT Uncovering
N/A OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
OK OK NOT
Lifing Equipment Availability Maintenance Access Social Issues
Readiness (Need PGPA or Not)
OK N/A NOT
OK OK NOT
CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 Maret 2018)
1 WUR KRS North 3517852 SLEEVE INSTALLATION 30"IBUL-DUMAI PKM 60.001-65.000 30" BKO-DMI PKM60001-65000 30 68 pair 18 SLV
2 WUR KRS North 3481034 ROAD CROSSING 30" DRI-DMI PKM0.000-4.000 30" DRI TO DMI PKM 0.000-4000 30 0 pair 0 RCW
3 WUR KRS North 3481146 ROAD CROSSING 36" CPL DRI-DMI HCT-FOMN-CPL-36" DURI TO DUMAI 36 0 pair 0 RCW
4 WUR KRS North 3528136 ROAD CROSSING IMP 30 DRI-DMI PKM7.800-10.000 (PACKAGE 2) 30" DRI TO DMI PKM 7800-10000 30 30 pair 8 RCW
5 WUR KRS North 3528137 ROAD CROSSING IMP 36 DRI-DMI PKM 8.750-13.750(PACKAGE 2) 36" DRI-DMI PKM8750-13750 36 30 pair 8 RCW
6 WUR KRS North 3480953 PIPE SLEEVE 30" DRI TO DMI PKM 4.001-7800 30" DRI-DMI PKM4001-7800 30 SLV
7.5 pair 2
7 WUR KRS North 3480993 SLEEVE INSTALLATION 30 DRI-DMI PKM35.001-40.000 30" DRI-DMI PKM35001-40000 30 SLV
8 WUR KRS North 3479025 SLEEVE INSTALLATION 36 DRI-DMI HCT-FOMN-CPL-36" DURI TO DUMAI 36 7.5 pair 2 SLV
9 WUR KRS North 3481148 COATING APPLICATION 30" DRI-DMI PKM 8.413-9.479 ( Package 1) 30" DRI TO DMI PKM 7800-10000 30 60 meter 0 SLV
10 WUR KRS North 3512524 ROAD CROSSING MNS 30" TO DRI PKM 50.001-55.000 (116 PAIRS) 30" MNS-DRI PKM50001-55000 30 19 pair 5 RCW
11 WUR KRS North 3512544 ROAD CROSSING 10"MNS TO DRI PKM 46.304-55.000 HCT-FOMN-GPL-10" MINDL TO DURI 10 19 pair 3 RCW
12 WUR KRS North 3519935 RWL 30"PACKAGE 2 PKM 16277-17156 Shipping Pump 30 20 pair 4 SLV
13 WUR KRS North 3481010 SLEEVE INSTALLATION 30" NBS MINAS TO DRI (51 PAIRS) 30" MNS-DRI PKM36400-40000 30 7.5 pair 2 SLV
14 WUR MMP North 3479039 SLEEVE INSTALLATION 12" LBO-DRI PKM45001-50000 12" LBO-DRI PKM45001-50000 12 0 pair N/A SLV
15 WUR MMP North 3479042 SLEEVE INSTALLATION 12" LBO-DRI PKM10001-15000 12" LBO-DRI PKM10001-15000 12 0 pair N/A SLV
16 WUR MMP North 3479043 SLEEVE INSTALLATION 12" LBO-DRI PKM15001-20000 12" LBO-DRI PKM15001-20000 12 0 pair N/A SLV
17 WUR MMP North 3479044 SLEEVE INSTALLATION 12" LBO-DRI PKM20001-25000 12" LBO-DRI PKM20001-25000 12 0 pair N/A SLV
18 WUR MMP North 3479046 SLEEVE INSTALLATION 12" LBO-DRI PKM25001-30000 12" LBO-DRI PKM25001-30000 12 0 pair N/A SLV
19 WUR MMP North 3479047 SLEEVE INSTALLATION 12" LBO-DRI PKM 30.001-35.000 12" LBO-DRI PKM30001-35000 12 5 pair 2 SLV
20 WUR MMP North 3479048 SLEEVE INSTALLATION 12" LBO-DRI PKM 35.001-40.000 12" LBO-DRI PKM35001-40000 10 5 pair 2 SLV
21 WUR MMP North 3479052 SLEEVE INSTALLATION 10" MDL-DRI HCT-FOMN-GPL-10" MINDL TO DURI 10 2 pair 2 SLV
22 WUR MMP North 3479054 SLEEVE INSTALLATION 10" MDL-DRI PKM 13.000-18.000 10" MDL-DRI PKM13000-18000 10 5 pair 2 SLV
WUR MMP North 3479055 SLEEVE INSTALLATION 10" MDL-DRI PKM23001-28000 10" MDL-DRI PKM23001-28000 10 3 pair 2 SLV
WUR MMP North 3479056 SLEEVE INSTALLATION 10" MDL-DRI PKM28001-33000 10" MDL-DRI PKM28001-33000 10 0 pair N/A SLV
WUR MMP North 3479057 SLEEVE INSTALLATION I10" MDL-DRI PKM33001-38000 10" MDL-DRI PKM33001-38000 10 0 pair N/A SLV
WUR MMP North 3526258 ROAD CROSSING 20" BKO - PEMATANG IBUL PKM 0 - 4.219 20" BKO - DMI PKM 0 - 4219 20 0 pair N/A RCW
WUR MMP North 3526314 ACCESS ROAD SPOT CLEARING 10" MINDAL TO DURI PKM 2.549-4.850 HCT-FOMN-GPL-10" MINDL TO DURI 10 0 pair N/A SLV
RUR WKS North 3450182 NEW INSTALLATION PIPE SLEEVE CONDENS 6" CORRIDOR 5SE-5SW JOIN83-147(560 PAIRS) Pipe,5SE-CGC-101-06-CVC05 6 0 pair 2 SLV
RUR WKS North 3526676 SLEEVE INSTALLATION 30"DRI-DMI PKM 0.000-4.000 30" DRI TO DMI PKM 0.000-4000 30 0 pair 0 SLV
RUR WKS North 3479965 SLEEVE INSTALLATION 16" DDP-DGF PKM 0 - 2.430 (17 PAIRS) 16" DRI-DDP PKM0-2430 16 0 pair 0 SLV
RUR WKS North 3503811 10" PRODUCTION LINE PIPE SLEEVE LIBO MR PL 10 LIBO 18 TO LIBO GS 10 10 pair 4 SLV
RUR WKS North 3519677 DISMANTLE INSULATION PIPE 10” LIBO PRODUCTION LINE (CLEARING MANUAL PIPE 24" 5L34) PL 10 LIBO 18 TO LIBO GS 10 0 pair 0 SLV
RUR WKS North 3528091 INSTALLATION PIPE SLEEVE 8 " CGC LINE NEAR R/C 6N-75 TO CGS-5 (70 PAIRS) Pipe,6GN-CGC-403-08-NSC65 8 20 pair 5 SLV
WUR WKS South 3496886 CONDITION MONITORING TRIGGERED PL 12in 6F61-PL 16in 6E64 12 67 pair 9 SLV
WUR WKS South 3496893 SLEEVE INSTALLATION 16" 6D78N-PL 16" 6E35 (454 PAIRS) PL 12in 6F61-PL 16in 6E64 16 12 pair 2 SLV
North Area South Area
No Type of Work UOM
KRS MMP WKS MMP WKS TOTAL
1 Coating Application 60 Sq. Meter
2 Sleeve Installation 110.5 20 30 79 Pair
3 Road Crossing Improvement 98 Pair
4 Anode Installation Pcs
REPORT SCHEDULE
No Description Time To
1 Daily Report 8:00 AM Every Working Day All
2 Weekly Report 11:00 AM Every Monday SMBR
3 Weekly Report 11:00 AM Every Tuesday CPI
4 7 days Planning and Scheduling 3:00 PM Every Wednesday CPI
5 Sponsor Estimate 3:00 PM 2nd day on 4th week Every Month CPI
PIC
All Contractor's Planner
All Contractor's Planner
SMBR Reps
All Contractor's Planner
All Contractor's Planner