CPM - WEEKLY PLANNING WEEK 13 - 2018 (26 - 30 March 2018) WUR KRS

Contractor Order
No WO St Short Description
Company Number

1 WUR KRS North 3517852 55 SLEEVE INSTALL 30"IBUL-DMI

ROAD CROSSING IMP 30 DRI-DMI (EPL


2 WUR KRS North 3481034 55 Package 1)

ROAD CROSSING IMP 36 DRI-DMI (EPL


3 WUR KRS North 3481146 55 Package 1)

ROAD CROSSING IMP 30 DRI-DMI (EPL


4 WUR KRS North 55 Package 2)

ROAD CROSSING IMP 36 DRI-DMI (EPL


5 WUR KRS North 3481146 55 Package 2)

6 WUR KRS North 3480972 05 SLEEVE INSTALLATION 30 DRI-DMI

7 WUR KRS North 3479984 05 SLEEVE INSTALLATION 36 DRI-DMI

COATING APPLICATION 30 DRI-DMI (Package


8 WUR KRS North 3481148 55 1)
user:
9 WUR KRS North 3512524 55 ROAD CROSSING 30" MNSDRI PKM 15659 didalam JDE
Yang diterima masuk
kedalam RWL PACK 3
dan SR-nya belum
10 WUR KRS North 3512544 55 ROAD CROSSING 10 "MNSDRI
diterima KRS

11 WUR KRS North 3509909 55 RWL 30"PACK 2 PKM 15659 - 14926

12 WUR KRS North 3481014 55 SLEEVE INSTALLATION 30 NBS-DRI

CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 March 2018) WUR MMP North
Contractor Order
No WO St Short Description
Company Number

1 WUR MMP North 3479039 55 SLEEVE INSTALLATION 12 LBO-DRI

2 WUR MMP North 3479042 55 SLEEVE INSTALLATION 12 LBO-DRI


3 WUR MMP North 3479043 55 SLEEVE INSTALLATION 12 LBO-DRI

4 WUR MMP North 3479044 55 SLEEVE INSTALLATION 12 LBO-DRI

5 WUR MMP North 3479046 55 SLEEVE INSTALLATION 12 LBO-DRI

6 WUR MMP North 3479047 55 SLEEVE INSTALLATION 12 LBO-DRI

7 WUR MMP North 3479048 55 SLEEVE INSTALLATION 12 LBO-DRI

8 WUR MMP North 3479052 55 SLEEVE INSTALLATION 10 MDL-DRI

9 WUR MMP North 3479054 55 SLEEVE INSTALLATION 10 MDL-DRI

10 WUR MMP North 3479055 55 SLEEVE INSTALLATION 10 MDL-DRI

11 WUR MMP North 3479056 55 SLEEVE INSTALLATION 10 MDL-DRI

12 WUR MMP North 3479057 55 SLEEVE INSTALLATION 10 MDL-DRI

13 WUR MMP North 3526258 55 ROAD CROSSING 20" BKO - DMI

14 WUR MMP North 3526314 55 ACCESS ROAD SPOT CLEARING

CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 March 2018) RUR WKS North
Contractor Order
No WO St Short Description
Company Number

1 RUR WKS North 3450182 60 TASK FORCE PIPE SLEEVE

2 RUR WKS North 3526676 55 SLEEVE INSTALL 30"CPS-CGS#5

3 RUR WKS North 3479965 55 SLEEVE INSTALLATION 16 DDP-DGF

4 RUR WKS North 3503811 60 10" PRODUCTION LINE PIPE SLEEV

5 RUR WKS North 3519677 55 Dismantle insulation pipe 10”

2 RUR WKS North 3528091 55 INSTALL SLEEVE 8" CGC LINE


CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 March 2018) WUR WKS South
Contractor Order
No WO St Short Description
Company Number

1 WUR WKS South 3496886 55 Sleeve Installation 12" 6F61

2 WUR WKS South 3496893 55 Sleeve Installation 16" 6D-79 & 6D-78
March 2018) WUR KRS

Problem Description Equipment Number Equipment Description/Location

SLEEVE INSTALLATION 30"IBUL-DUMAI PKM 60.001-65.000 HCT-FOMN-CPL-30BKODMI-12 30" BKO-DMI PKM60001-65000

ROAD CROSSING 30" DRI-DMI PKM0.000-4.000 HCT-FOMN-CPL-30DRIDMI-1 30" DRI TO DMI PKM 0.000-4000

ROAD CROSSING 36" CPL DRI-DMI HCT-FOMN-CPL-36DRIDMI HCT-FOMN-CPL-36" DURI TO DUMAI

ROAD CROSSING IMP 30 DRI-DMI (EPL Package 2) PKM 12571 - 13155 PKM 12571 - 13155

ROAD CROSSING 36" CPL DRI-DMI HCT-FOMN-CPL-36DRIDMI HCT-FOMN-CPL-36" DURI TO DUMAI

SLEEVE INSTALLATION 30 DRI-DMI PKM35.001-40.000 HCT-FOMN-CPL-30DRIDMI-6 30" DRI-DMI PKM20001-25000

PIPE SLEEVE 30" DRI TO DMI PKM 18751-23750 HCT-FOMN-CPL-36DRIDMI-3 36" DRI-DMI PKM18751-23750

COATING APPLICATION 30" DRI-DMI PKM 8.413-9.479 HCT-FOMN-CPL-30DRIDMI-3 30" DRI TO DMI PKM 7800-10000
( Package 1)
user:
ROAD CROSSING
PKM 15659 30"didalam
MNS TOJDE
DRI PKM 45.001-50.000 (147 HCT-FOMN-CPL-30MNSDRI-3 30" MNS-DRI PKM45001-50000
Yang diterima masukPAIRS)
kedalam RWL PACK 3
dan SR-nya belum
ROAD CROSSING 10"MNS TO DRI PKM 46.304-55.000 HCT-FOMN-GPL-10MDLDRI HCT-FOMN-GPL-10" MINDL TO DURI
diterima KRS

RWL 30"PACK 2 PKM 15659 - 14926 DRI-TS-04-RWP-SH Shipping Pump

SLEEVE INSTALLATION 30" NBS MINAS TO DRI (14 PAIRS) HCT-FOMN-CPL-30MNSDRI-4 30" MNS-DRI PKM50001-55000

March 2018) WUR MMP North

Problem Description Equipment Number Equipment Description/Location

SLEEVE INSTALLATION 12" LBO-DRI PKM45001-50000 HCT-FOMN-GPL-12LBODRI-10 12" LBO-DRI PKM45001-50000

SLEEVE INSTALLATION 12" LBO-DRI PKM10001-15000 HCT-FOMN-GPL-12LBODRI-3 12" LBO-DRI PKM10001-15000


SLEEVE INSTALLATION 12" LBO-DRI PKM15001-20000 HCT-FOMN-GPL-12LBODRI-4 12" LBO-DRI PKM15001-20000

SLEEVE INSTALLATION 12" LBO-DRI PKM20001-25000 HCT-FOMN-GPL-12LBODRI-5 12" LBO-DRI PKM20001-25000

SLEEVE INSTALLATION 12" LBO-DRI PKM25001-30000 HCT-FOMN-GPL-12LBODRI-6 12" LBO-DRI PKM25001-30000

SLEEVE INSTALLATION 12" LBO-DRI PKM 30.001-35.000 HCT-FOMN-GPL-12LBODRI-7 12" LBO-DRI PKM30001-35000

SLEEVE INSTALLATION 12" LBO-DRI PKM 35.001-40.000 HCT-FOMN-GPL-12LBODRI-8 12" LBO-DRI PKM35001-40000

SLEEVE INSTALLATION 10" MDL-DRI HCT-FOMN-GPL-10MDLDRI HCT-FOMN-GPL-10" MINDL TO DURI

SLEEVE INSTALLATION 10" MDL-DRI PKM 13.000-18.000 HCT-FOMN-GPL-10MDLDRI-1 10" MDL-DRI PKM13000-18000

SLEEVE INSTALLATION 10" MDL-DRI PKM23001-28000 HCT-FOMN-GPL-10MDLDRI-3 10" MDL-DRI PKM23001-28000

SLEEVE INSTALLATION 10" MDL-DRI PKM28001-33000 HCT-FOMN-GPL-10MDLDRI-4 10" MDL-DRI PKM28001-33000

SLEEVE INSTALLATION I10" MDL-DRI PKM33001-38000 HCT-FOMN-GPL-10MDLDRI-5 10" MDL-DRI PKM33001-38000

ROAD CROSSING 20" BKO - PEMATANG IBUL PKM 0 - 4.219 HCT-FOMN-CPL-20BKODMI-1 20" BKO - DMI PKM 0 - 4219

ACCESS ROAD SPOT CLEARING 10" MINDAL TO DURI PKM HCT-FOMN-GPL-10MDLDRI HCT-FOMN-GPL-10" MINDL TO DURI
2.549-4.850

March 2018) RUR WKS North

Problem Description Equipment Number Equipment Description/Location

NEW INSTALLATION PIPE SLEEVE CONDENS 6" CORRIDOR 5SE- DRI-PIPE-00399 Pipe,5SE-CGC-101-06-CVC05
5SW JOIN83-147(560 PAIRS)

SLEEVE INSTALLATION 30"DRI-DMI PKM 0.000-4.000 HCT-FOMN-CPL-30DRIDMI-1 30" DRI TO DMI PKM 0.000-4000

SLEEVE INSTALLATION 16" DDP-DGF PKM 0 - 2.430 (17 PAIRS) HCT-FOMN-GPL-16DRIDDP-1 16" DRI-DDP PKM0-2430

10" PRODUCTION LINE PIPE SLEEVE LIBO MR BKS-PL-LBSE10000000 PL 10 LIBO 18 TO LIBO GS

DISMANTLE INSULATION PIPE 10” LIBO PRODUCTION LINE


BKS-PL-LBSE10000000 PL 10 LIBO 18 TO LIBO GS
(CLEARING MANUAL PIPE 24" 5L34)

INSTALLATION PIPE SLEEVE 8 " CGC LINE NEAR R/C 6N-75 TO DRI-PIPE-00385 Pipe,6GN-CGC-403-08-NSC65
CGS-5 (70 PAIRS)
March 2018) WUR WKS South

Problem Description Equipment Number Equipment Description/Location

CONDITION MONITORING TRIGGERED MNS-PL-M3-12-6F61 PL 12in 6F61-PL 16in 6E64

SLEEVE INSTALLATION 16" 6D78N-PL 16" 6E35 (454 PAIRS) MNS-PL-M3-12-6D-79 & 6D-78 PL 12in 6F61-PL 16in 6E64
Planned Start Date Planned Finish
Loc 3 MOC Number Business Unit Lead Craf Fareps CPI
(Week 12) Date (Week 12)

Andi Rinaldo
H01 N/A 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Dedi Sukmara

Glundung S
H01 480236 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 480236 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 480743 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 306780 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 306803 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 N/A 19/03/18 23/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 456908 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Glundung S
H01 456908 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T
Glundung S
D01 N/A 26/03/18 30/03/18 2500CP7321 EPL-CONS-NO Mairudi
Andi T
Glundung S
H01 306795 26/03/18 30/03/18 2500CP5221 EPL-CONS-NO Mairudi
Andi T

Planned Start Date Planned Finish


Loc 3 MOC Number Business Unit Lead Craf Fareps CPI
(Week 12) Date (Week 12)

H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima


H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 342345 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 307567 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 307567 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 307567 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 307567 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 307567 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

H01 504540 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Gunawan Boediarto

H01 N/A 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Meidian Prima

Planned Start Date Planned Finish


Loc 3 MOC Number Business Unit Lead Craf Fareps CPI
(Week 12) Date (Week 12)

D04 435802 19-Mar-18 23-Mar-18 2500CP7422 EPL-CONS-NO Eriswandi

H01 306801 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Eriswandi

H01 396602 19-Mar-18 23-Mar-18 2500CP5221 EPL-CONS-NO Eriswandi

Mukhlis M
B04 394409 19-Mar-18 23-Mar-18 2500CP1972 IM-PIPE-N Ruli A

Mukhlis M
B04 N/A 19-Mar-18 23-Mar-18 2500CP1972 EPL-CONS-NO Ruli A

D04 N/A 19-Mar-18 23-Mar-18 2500CP7422 EPL-CONS-NO Eriswandi


Planned Start Date Planned Finish
Loc 3 MOC Number Business Unit Lead Craf Fareps CPI
(Week 12) Date (Week 12)

David S
M01 453959 19-Mar-18 23-Mar-18 2500CP3931 EPL-CONS-SO Subagio

David S
M01 454342 19-Mar-18 23-Mar-18 2500CP3931 EPL-CONS-SO Subagio
Fareps Size Target in Week Mall Sleeve
PMCOW Local 11 UOM Total Welders
SMBR (Inch) 11 - 2018 Status
1. Saud.T
2. Dafris
Syafrizon 3. Barisman SLV 30 68 pair 18 OK
4. Akmal
5. Suanto
Zulhamdi 1. Sweden RCW 30 10 pair 2 OK

Zulhamdi 1. Sweden RCW 36 10 pair 2 OK

1. Juara
2. Alin Panjaitan
Zulhamdi RCW 30 30 pair 8 OK
3. Parasian Sinaga
4. Henri. TP
1. Juara
2. Alin Panjaitan
Zulhamdi RCW 36 30 pair 8 OK
3. Parasian Sinaga
4. Henri. TP

1. John K
Zulhamdi SLV 30 10 pair 2 OK
2. Desfrianto

1. John K
Zulhamdi SLV 36 10 pair 2 OK
2. Desfrianto

Zulhamdi 1. Tigor Simanjuntak SLV 30 60 meter 0 OK

Zulhamdi Marigjen & Ali rahmat RCW 30 19 pair 5 OK

Zulhamdi Marigjen & Ali rahmat RCW 10 19 pair 3 OK

Fuadi Gortap SLV 30 20 pair 4 OK

Bujang Saad Loderman SLV 30 15 pair 4 OK

223.5 58

Fareps Size Target in Week Mall Sleeve


PMCOW Local 11 UOM Total Welders
SMBR (Inch) 11 - 2018 Status

Bujang Saad Hotroha Sihotang SLV 12 0 pair N/A N/A

Bujang Saad Hotroha Sihotang SLV 12 0 pair N/A N/A


Bujang Saad Hotroha Sihotang SLV 12 0 pair N/A N/A

Bujang Saad Sudarto SLV 12 0 pair N/A N/A

Bujang Saad Sudarto SLV 12 0 pair N/A N/A

Bujang Saad Eben Sitanggang SLV 12 5 pair 2 OK

Bujang Saad Ridwan Daris SLV 10 5 pair 2 OK

Bujang Saad M Ramli SLV 10 2 pair 2 OK

Bujang Saad Delvi SLV 10 5 pair 2 OK

Bujang Saad M Ramli SLV 10 3 pair 2 OK

Bujang Saad Sudarto SLV 10 0 pair N/A N/A

Bujang Saad Sudarto SLV 10 0 pair N/A N/A

Syafrizon Taufik Hidayat RCW 20 0 pair N/A N/A

Syafrizon Sudarto SLV 10 0 pair N/A N/A

20 10

Fareps Size Target in Week Mall Sleeve


PMCOW Local 11 UOM Total Welders
SMBR (Inch) 11 - 2018 Status

Fuadi Yosfi SLV 6 0 pair 2 OK

Zulhamdi N/A SLV 30 0 pair 0 OK

Zulhamdi N/A SLV 16 0 pair 0 OK

Yones R Faria Donal SLV 10 10 pair 4 OK

Yones R MUSLIM SLV 10 0 pair 0 OK

Yones R Dedi M SLV 8 20 pair 5 OK


30 11

Fareps Size Target in Week Mall Sleeve


PMCOW Local 11 UOM Total Welders
SMBR (Inch) 11 - 2018 Status

Yones R Dasmansyah, Zahirrudin SLV 12 67 pair 9 OK

Yones R Basron SLV 16 12 pair 2 N/A


Material Welding Crew Civil Crew Scafolding
Material Location
Availability Availability Availability Availability

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

OK KRS Yard OK OK N/A

Material Welding Crew Civil Crew Scafolding


Material Location
Availability Availability Availability Availability

OK Batch Plant N/A OK N/A

OK Batch Plant N/A OK N/A


OK Batch Plant N/A OK N/A

OK Batch Plant N/A OK N/A

OK Batch Plant N/A OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant OK OK N/A

OK Batch Plant N/A N/A N/A

OK N/A N/A N/A N/A

Material Welding Crew Civil Crew Scafolding


Material Location
Availability Availability Availability Availability

OK Area 8 OK OK N/A

OK Batch Plant N/A N/A N/A

OK Batch Plant N/A N/A N/A

OK Waduk Yard OK OK N/A

OK LIBO MAIN ROAD N/A OK N/A

OK Batch Plant OK N/A N/A


Material Welding Crew Civil Crew Scafolding
Material Location
Availability Availability Availability Availability

OK OK OK N/A OK

OK 6D79 OK N/A OK
Maintenance Access Social Issues
Lifing Equipment Availability Readiness (Need PGPA or Not)

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

Lifing Equipment Availability Maintenance Access Social Issues


Readiness (Need PGPA or Not)

OK OK NOT Uncovering

OK OK NOT Uncovering
OK OK NOT Uncovering

OK OK NOT Uncovering

OK OK NOT Uncovering

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT Uncovering

OK N/A NOT Uncovering

N/A OK NOT Scooping

N/A OK NOT

Maintenance Access Social Issues


Lifing Equipment Availability Readiness (Need PGPA or Not)

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT

OK OK NOT
Lifing Equipment Availability Maintenance Access Social Issues
Readiness (Need PGPA or Not)

OK N/A NOT

OK OK NOT
CPM - WEEKLY PLANNING WEEK 12 - 2018 (19 - 23 Maret 2018)

Target in Week Total Work


No Contractor Company Order Number Problem Description Equipment Description/Location Size 11 - 2018 UOM Welder Type

1 WUR KRS North 3517852 SLEEVE INSTALLATION 30"IBUL-DUMAI PKM 60.001-65.000 30" BKO-DMI PKM60001-65000 30 68 pair 18 SLV

2 WUR KRS North 3481034 ROAD CROSSING 30" DRI-DMI PKM0.000-4.000 30" DRI TO DMI PKM 0.000-4000 30 0 pair 0 RCW

3 WUR KRS North 3481146 ROAD CROSSING 36" CPL DRI-DMI HCT-FOMN-CPL-36" DURI TO DUMAI 36 0 pair 0 RCW

4 WUR KRS North 3528136 ROAD CROSSING IMP 30 DRI-DMI PKM7.800-10.000 (PACKAGE 2) 30" DRI TO DMI PKM 7800-10000 30 30 pair 8 RCW

5 WUR KRS North 3528137 ROAD CROSSING IMP 36 DRI-DMI PKM 8.750-13.750(PACKAGE 2) 36" DRI-DMI PKM8750-13750 36 30 pair 8 RCW

6 WUR KRS North 3480953 PIPE SLEEVE 30" DRI TO DMI PKM 4.001-7800 30" DRI-DMI PKM4001-7800 30 SLV
7.5 pair 2
7 WUR KRS North 3480993 SLEEVE INSTALLATION 30 DRI-DMI PKM35.001-40.000 30" DRI-DMI PKM35001-40000 30 SLV

8 WUR KRS North 3479025 SLEEVE INSTALLATION 36 DRI-DMI HCT-FOMN-CPL-36" DURI TO DUMAI 36 7.5 pair 2 SLV

9 WUR KRS North 3481148 COATING APPLICATION 30" DRI-DMI PKM 8.413-9.479 ( Package 1) 30" DRI TO DMI PKM 7800-10000 30 60 meter 0 SLV

10 WUR KRS North 3512524 ROAD CROSSING MNS 30" TO DRI PKM 50.001-55.000 (116 PAIRS) 30" MNS-DRI PKM50001-55000 30 19 pair 5 RCW

11 WUR KRS North 3512544 ROAD CROSSING 10"MNS TO DRI PKM 46.304-55.000 HCT-FOMN-GPL-10" MINDL TO DURI 10 19 pair 3 RCW

12 WUR KRS North 3519935 RWL 30"PACKAGE 2 PKM 16277-17156 Shipping Pump 30 20 pair 4 SLV

13 WUR KRS North 3481010 SLEEVE INSTALLATION 30" NBS MINAS TO DRI (51 PAIRS) 30" MNS-DRI PKM36400-40000 30 7.5 pair 2 SLV

14 WUR MMP North 3479039 SLEEVE INSTALLATION 12" LBO-DRI PKM45001-50000 12" LBO-DRI PKM45001-50000 12 0 pair N/A SLV

15 WUR MMP North 3479042 SLEEVE INSTALLATION 12" LBO-DRI PKM10001-15000 12" LBO-DRI PKM10001-15000 12 0 pair N/A SLV

16 WUR MMP North 3479043 SLEEVE INSTALLATION 12" LBO-DRI PKM15001-20000 12" LBO-DRI PKM15001-20000 12 0 pair N/A SLV

17 WUR MMP North 3479044 SLEEVE INSTALLATION 12" LBO-DRI PKM20001-25000 12" LBO-DRI PKM20001-25000 12 0 pair N/A SLV

18 WUR MMP North 3479046 SLEEVE INSTALLATION 12" LBO-DRI PKM25001-30000 12" LBO-DRI PKM25001-30000 12 0 pair N/A SLV

19 WUR MMP North 3479047 SLEEVE INSTALLATION 12" LBO-DRI PKM 30.001-35.000 12" LBO-DRI PKM30001-35000 12 5 pair 2 SLV

20 WUR MMP North 3479048 SLEEVE INSTALLATION 12" LBO-DRI PKM 35.001-40.000 12" LBO-DRI PKM35001-40000 10 5 pair 2 SLV

21 WUR MMP North 3479052 SLEEVE INSTALLATION 10" MDL-DRI HCT-FOMN-GPL-10" MINDL TO DURI 10 2 pair 2 SLV

22 WUR MMP North 3479054 SLEEVE INSTALLATION 10" MDL-DRI PKM 13.000-18.000 10" MDL-DRI PKM13000-18000 10 5 pair 2 SLV

WUR MMP North 3479055 SLEEVE INSTALLATION 10" MDL-DRI PKM23001-28000 10" MDL-DRI PKM23001-28000 10 3 pair 2 SLV

WUR MMP North 3479056 SLEEVE INSTALLATION 10" MDL-DRI PKM28001-33000 10" MDL-DRI PKM28001-33000 10 0 pair N/A SLV

WUR MMP North 3479057 SLEEVE INSTALLATION I10" MDL-DRI PKM33001-38000 10" MDL-DRI PKM33001-38000 10 0 pair N/A SLV

WUR MMP North 3526258 ROAD CROSSING 20" BKO - PEMATANG IBUL PKM 0 - 4.219 20" BKO - DMI PKM 0 - 4219 20 0 pair N/A RCW

WUR MMP North 3526314 ACCESS ROAD SPOT CLEARING 10" MINDAL TO DURI PKM 2.549-4.850 HCT-FOMN-GPL-10" MINDL TO DURI 10 0 pair N/A SLV

RUR WKS North 3450182 NEW INSTALLATION PIPE SLEEVE CONDENS 6" CORRIDOR 5SE-5SW JOIN83-147(560 PAIRS) Pipe,5SE-CGC-101-06-CVC05 6 0 pair 2 SLV

RUR WKS North 3526676 SLEEVE INSTALLATION 30"DRI-DMI PKM 0.000-4.000 30" DRI TO DMI PKM 0.000-4000 30 0 pair 0 SLV

RUR WKS North 3479965 SLEEVE INSTALLATION 16" DDP-DGF PKM 0 - 2.430 (17 PAIRS) 16" DRI-DDP PKM0-2430 16 0 pair 0 SLV

RUR WKS North 3503811 10" PRODUCTION LINE PIPE SLEEVE LIBO MR PL 10 LIBO 18 TO LIBO GS 10 10 pair 4 SLV

RUR WKS North 3519677 DISMANTLE INSULATION PIPE 10” LIBO PRODUCTION LINE (CLEARING MANUAL PIPE 24" 5L34) PL 10 LIBO 18 TO LIBO GS 10 0 pair 0 SLV

RUR WKS North 3528091 INSTALLATION PIPE SLEEVE 8 " CGC LINE NEAR R/C 6N-75 TO CGS-5 (70 PAIRS) Pipe,6GN-CGC-403-08-NSC65 8 20 pair 5 SLV

WUR WKS South 3496886 CONDITION MONITORING TRIGGERED PL 12in 6F61-PL 16in 6E64 12 67 pair 9 SLV

WUR WKS South 3496893 SLEEVE INSTALLATION 16" 6D78N-PL 16" 6E35 (454 PAIRS) PL 12in 6F61-PL 16in 6E64 16 12 pair 2 SLV
North Area South Area
No Type of Work UOM
KRS MMP WKS MMP WKS TOTAL
1 Coating Application 60 Sq. Meter
2 Sleeve Installation 110.5 20 30 79 Pair
3 Road Crossing Improvement 98 Pair
4 Anode Installation Pcs
REPORT SCHEDULE
No Description Time To
1 Daily Report 8:00 AM Every Working Day All
2 Weekly Report 11:00 AM Every Monday SMBR
3 Weekly Report 11:00 AM Every Tuesday CPI
4 7 days Planning and Scheduling 3:00 PM Every Wednesday CPI
5 Sponsor Estimate 3:00 PM 2nd day on 4th week Every Month CPI
PIC
All Contractor's Planner
All Contractor's Planner
SMBR Reps
All Contractor's Planner
All Contractor's Planner