Professional Documents
Culture Documents
Rab Masjid
Rab Masjid
UPAH PEKERJA
NO PEKERJA KODE UPAH SATUAN
1 Pekerja @ Rp 72,000.00 OH
2 Tukang Batu @ Rp 84,000.00 OH
3 Tukang Besi @ Rp 85,000.00 OH
4 Tukang Kayu @ Rp 90,000.00 OH
5 Tukang Cat @ Rp 85,000.00 OH
6 Tukang Pipa @ Rp 90,000.00 OH
7 Kepala Tukang @ OH
8 Mandor @ Rp 96,000.00 OH
PAKU 2"-5" Rp 24,000.00 Kg
SIRTU Rp 160,000.00 M³
PASIR URUG Rp 144,100.00 M³
PASIR PASANG Rp 225,000.00 M³
PC GRESIK /HOLCIM Rp 1,000.00 KG
BESI BETON ULIR SNI Rp 15,000.00 KG
BESI BETON POLOS SNI Rp 15,000.00 KG
50/50 Rp 15,000.00
PERLENGKAPAN Rp 8,000.00
PERLENGKAPAN Rp 100,000.00
PERLENGKAPAN Rp 100,000.00
PERLENGKAPAN Rp 25,000.00
PERLENGKAPAN Rp 100,000.00
BATHUP Rp 5,500,000.00
PERLENGKAPAN Rp 100,000.00
3. PASANG BOUWPLANK
2. PEKERJAAN KOLOM
2.1 PEKERJAAN KOLOM K1 DIA 50 CM
VI PEKERJAAN PLESTERAN
1. PEKERJAAN PLESTERAN DINDING TEBAL 15 MM,
CAMP. 1PC : 4PS
X PEKERJAAN LANTAI
1. LANTAI KERAMIK 50x50
2 (P + L) = 2 (16 M + 16 M)
64
PONDASI TEPI
56
PONDASI TEPI
L. PENAMPANG × P. PONDASI
31.36
> VOLUME GALIAN PONDASI BK TOTAL
98.896
PONDASI FOOTPLAT
JUMLAH FOOTPLAT = 38 Bh
> LUAS PENAMPANG GALIAN
1.4 x 1.3
1.82
PONDASI TEPI
0.014 x 56
0.76
LANTAI 2
10.50
PANJANG SLOOF
123
16
140
186
35.67
29.87
> LANTAI 1
> PAS. TRASRAAM
110.3
> LANTAI 2
> PAS. TRASRAAM
100.68
> LANTAI 1
40.77
> LANTAI 2
30.23
352.2
JADI V. KUSEN
0.08 × 0.12 × 283.12
2.72
SLOOT PINTU : 1 x 9 = 9 Bh
BESI DOOK : 2 x 9 = 18 Bh
ANGKUR : PINTU : 54 Bh
JENDELA : 246 Bh
2. SELOT PINTU
JUMLAH PINTU x 1
9x1
9
1. KACA JENDELA
41.33
M²
M¹
M¹
M²
M²
M¹
M¹
M¹
M³
M³
M³
M²
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M¹
11.2
M¹ 27.75
39.65
58
136.6
M¹
M¹
M¹
M¹
M¹
M³
M³
M³
M¹
M³
M²
M²
M²
M²
M²
M²
M²
M¹
M²
M²
M²
M²
M²
TOTAL
JENIS JMLH SATUAN K. TENGAH K.TEPI
TENGAH
P1 1 M¹ ˉ 7.02 ˉ
P2 2 M¹ ˉ 7.02 ˉ
P3 4 M¹ ˉ 5.02 ˉ
P4 2 M¹ ˉ 4.92 ˉ
J1 4 M¹ ˉ 8.44 ˉ
J2 8 M¹ ˉ 5.32 ˉ
J3 36 M¹ ˉ 3.32 ˉ
J4 15 M¹ ˉ 2.42 ˉ
TOTAL ˉ
M³ P1 1 M² 6.57 ˉ ˉ
P2 2 M² 1.27 4.9 ˉ
P3 4 M² 1.72 ˉ ˉ
P4 2 M² 1.51 ˉ ˉ
J1 4 M² 1.17 4.4 ˉ
J2 8 M² 0.4 0.5 ˉ
J3 36 M² 0.27 0.23 ˉ
J4 15 M² 0.19 0.11 ˉ
TOTAL ˉ
M²
M²
Kg
Bh
Bh
Bh
Bh
Bh
M²
TOTAL
TOTAL
TEPI
7.02 7.02
14.04 14.04
20.08 20.08
9.84 9.84
33.76 33.76
42.56 42.56
119.52 119.52
36.3 36.3
252.1 283.12
TOTAL
PANIL KACA
6.57 ˉ
2.54 9.8
6.88 ˉ
3.02 ˉ
4.68 17.6
3.2 4
9.72 8.28
2.85 1.65
39.46 41.33
SCHDULE PERENCANAA
MARET APRIL
NO NAMA PEKERJAAN BOBOT %
0 1 2 3 4
I PEKERJAAN PERSIAPAN 0.000 0.00 0.00 0.00
VIII PEKERJAAN KUSEN & DAUN PINTU JENDELA 0.000 0.00 0.00 0.00 0.00 0.00
XVI JASA PERENC, PENGWS DAN PENGELOLAAN 0.000 0.00 0.00 0.00 0.00
TOTAL
0.000
RENCANA KENAIKAN PRESTASI DALAM 1 MINGGU 0.00 0.00 0.00 0.00 0.00
MARET APRIL
NO NAMA PEKERJAAN BOBOT %
0 1 2 3 4
I PEKERJAAN PERSIAPAN 0.000 0.00 0.00
XVI JASA PERENC, PENGWS DAN PENGELOLAAN 0.000 0.00 0.00 0.00 0.00
TOTAL
0.000
RENCANA KENAIKAN PRESTASI DALAM 1 MINGGU 0.00 0.00 0.00 0.00 0.00
VIII PEKERJAAN KUSEN & DAUN PINTU JENDELA 0.000 0.00 0.00 0.00 0.00 0.00
RENCANA KENAIKAN
TOTAL BOBOT
RENCANA KENAIKAN PRESTASI DALAM 1 MINGGU 0.00 0.00 0.00 0.00 0.00
TOTAL PRESTASI AKHIR MINGGU 0.000 0.00 0.00 0.00 0.00 0.00
KENAIKAN DALAM PELAKSANAAN
TOTAL BOBOT
RENCANA KENAIKAN PRESTASI DALAM 1 MINGGU 0.00 0.00 0.00 0.00 0.00
100%
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PELAKSANAAN
100%
0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
NA DAN PELAKSANAAN
APRIL MEI JUNI
KETERANGAN
5 6 7 8 9 10 11 12 13 14 15
100%
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
HARGA BAHAN BANGUNAN & UPAH (RAB)
HARGA BAHAN BANGUNAN
NO BAHAN SPESIFIKASI HARGA SATUAN
1 Kayu Terentang / Bekisting Lokal Rp 2,500,000.00 M³
2 Paku Seng Lokal Rp 30,000.00 Kg
3 Seng Bergelombang SNI Rp 75,000.00 Lb
4 Kayu Meranti 5/7 Lokal Rp 2,200,000.00 M³
5 Paku Usuk Reng Lokal Rp 30,000.00 Kg
6 Tanah Urug Lokal Rp 90,000.00 M³
7 Pasir Urug Lokal Rp 150,000.00 M³
8 Urug Sirtu Lokal Rp 160,000.00 M³
9 Batu Kali SNI Rp 220,000.00 M³
10 Kapur Pasang SNI Rp 259,500.00 M³
11 PC Holchim Rp 1,000.00 Kg
12 Batu Split 1/2 SNI Rp 185,000.00 M³
13 Pasir Pasang Lokal Rp 225,000.00 M³
14 Besi Beton SNI Rp 15,000.00 Kg
15 Bendrat SNI Rp 18,400.00 Kg
16 Paku 2" - 5" Lokal Rp 24,000.00 Kg
17 Minyak Bekisting Lokal Rp 8,500.00 Ltr
18 Plywood T=9mm Lokal Rp 100,000.00 Lbr
19 Kayu Dolken dia 8-10 /4M Lokal Rp 22,000.00 Btg
20 Bata Merah Lokal Rp 600.00 Bh
21 Plamir Tembok Sanyo / setara Rp 18,200.00 Kg
22 Cat Dasar Nippon paint Rp 45,000.00 Kg
23 Cat Penutup Nippon paint Rp 45,000.00 Kg
24 Politur Jago SNI Rp 50,000.00 Ltr
25 Politur Jadi Mowilex Pinguin/setara Rp 50,000.00 Ltr
26 Amplas SNI Rp 3,300.00 Bh
27 Kayu Bengkirai Balok Lokal Rp 12,500,000.00 M³
28 Kayu Bengkirai Papan Lokal Rp 10,000,000.00 M³
29 Penyambungan PAL PLN 1200 KWh SNI Rp 2,500,000.00 Set
30 Titik Lampu / Stop kontak Philips / Broco Rp 150,000.00 Set
31 Keramik 50x50 (Motif) KIA / Setara Rp 15,000.00 Bh
32 PC Warna Lokal Rp 10,000.00 Kg
33 Keramik 40x40 (Motif) KIA / Setara Rp 10,000.00 Bh
34 Angkur SNI Rp 9,000.00 Kg
35 Engsel Pintu Solid Rp 600,000.00 Bh
36 Kunci Tanam Antik Solid Rp 800,000.00 Bh
37 Kunci Tanam Biasa Solid Rp 500,000.00 Bh
38 Grendel Pintu Lokal Rp 30,000.00 Bh
39 Kaca Tebal 5mm SNI Rp 89,600.00 M²
Harga Upah Pekerja
NO PEKERJA KODE HARGA SATUAN
1 Pekerja / Tenaga @ Rp 72,000.00 OH / Hari
2 Tukang Batu @ Rp 84,000.00 OH / Hari
3 Kepala Tukang Batu @ Rp 90,000.00 OH / Hari
4 Tukang Besi @ Rp 85,000.00 OH / Hari
5 Kepala Tukang Besi @ Rp 90,000.00 OH / Hari
6 Tukang Kayu @ Rp 90,000.00 OH / Hari
7 Kepala Tukang Kayu @ Rp 96,000.00 OH / Hari
8 Tukang Cat @ Rp 85,000.00 OH / Hari
9 Kepala Tukang Cat @ Rp 90,000.00 OH / Hari
10 Tukang Pipa @ Rp 90,000.00 OH / Hari
11 Kepala Tukang Pipa @ Rp 96,000.00 OH / Hari
12 Tukang Gali @ Rp 115,000.00 OH / Hari
13 Mandor @ Rp 96,000.00 OH / Hari
)
PERHITUNGAN VOLUME PEKERJAAN
NO JENIS PEKERJAAN
I PEKERJAAN PERSIAPAN
1. MEMBERSIHKAN LAHAN & MERATAKAN TANAH
3. PASANG BOUWPLANK
PONDASI FOOTPLAT
1. VOLUME PONDASI FOOTPLAT
2. PEKERJAAN KOLOM
2.1 PEKERJAAN KOLOM K1 dia 50 CM
X PEKERJAAN LANTAI
1. LANTAI KERAMIK 50x50
3.2 JENDELA
TUNGAN VOLUME PEKERJAAN
PEHITUNGAN VOLUME
> 2 (P + L) = 2 (16 M + 16 M)
64 M¹
PONDASI TEPI
56 M¹
PONDASI TEPI
L. PENAMPANG × P. PONDASI
31.36 M³
PONDASI FOOTPLAT
JUMLAH FOOTPLAT = 38 Bh
> LUAS PENAMPANG GALIAN
1.4 x 1.3
1.82 M²
PONDASI TEPI
0.014 x 56
0.76 M³
LANTAI 2
10.5 M³
JUMLAH FOOTPLAT = 38 Bh
> VOLUME PONDASI FOOTPLAT UTUH (1)
0.59 M³
16 M¹
140 M¹
186 M¹
35.67 M¹
0.14 M³
149 M¹
29.87 M³
> LANTAI 1
> PAS. TRASRAAM
110.3 M²
> LANTAI 2
> PAS. TRASRAAM
100.68 M²
> LANTAI 1
40.77 M²
> LANTAI 2
30.23 M²
LIST SUDUT
500.98 M¹
352.2 M²
JADI V. KUSEN
0.08 × 0.12 × 283.12
2.72 M³
INVENTARISASI ALAT GANTUNG
SLOOT PINTU : 1 x 9 = 9 Bh
BESI DOOK : 2 x 9 = 18 Bh
ANGKUR : PINTU : 54 Bh
JENDELA : 246 Bh
2. SELOT PINTU
JUMLAH PINTU x 1
9x1
9 Bh
1. KACA JENDELA
41.33 M²
ANALISA HARGA SATUAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1. An1. MEMBERSIHKAN LAHAN & MERATAKAN TANAH /M²
0.100 OH PEKERJA @ Rp 72,000.00
0.050 OH MANDOR @ Rp 96,000.00
II PEKERJAAN TANAH
1. An3. GALIAN TANAH PONDASI /M³
0.400 OH PEKERJA @ Rp 72,000.00
0.040 OH MANDOR @ Rp 96,000.00
VI PEKERJAAN PLESTERAN
1. An28. PEKERJAAN PLESTERAN DINDING BM , TEBAL 20 MM , 1PC : 4PS /M²
Bahan
6.916 Kg PC @ Rp 1,000.00
0.027 M³ PASIR PASANG @ Rp 225,000.00
Upah
0.150 OH TUKANG BATU @ Rp 84,000.00
0.015 OH KEPALA TUKANG BATU @ Rp 90,000.00
0.200 OH PEKERJA @ Rp 72,000.00
0.010 OH MANDOR @ Rp 96,000.00
Rp 7,200.00
Rp 4,800.00
Rp 12,000.00 /M²
Rp 30,000.00
Rp 6,000.00
Rp 112,500.00
Rp 9,000.00
Rp 3,600.00
Rp 2,400.00
Rp 163,500.00 /M¹
Rp 26,400.00
Rp 600.00
Rp 17,500.00
Rp 9,000.00
Rp 960.00
Rp 7,200.00
Rp 480.00
Rp 62,140.00 /M¹
Rp 28,800.00
Rp 3,840.00
Rp 32,640.00 /M³
Rp 13,824.00
Rp 1,824.00
Rp 15,648.00 /M³
Rp 121,500.00
Rp 25,920.00
Rp 1,152.00
Rp 148,572.00 /M³
Rp 180,000.00
Rp 21,600.00
Rp 960.00
Rp 202,560.00 /M³
Rp 192,000.00
Rp 18,000.00
Rp 2,400.00
Rp 212,400.00 /M³
Rp 242,000.00
Rp 38,146.50
Rp 73,800.00
Rp 61,000.00
Rp 50,400.00
Rp 6,030.00
Rp 108,000.00
Rp 7,200.00
Rp 586,576.50 /M³
Rp 264,000.00
Rp 45,000.00
Rp 32,760.00
Rp 3,510.00
Rp 56,160.00
Rp 3,744.00
Rp 405,174.00 /M³
Rp 120,250.00
Rp 146,250.00
Rp 388,000.00
Rp 84,000.00
Rp 9,000.00
Rp 432,000.00
Rp 28,800.000
Rp 1,208,300.00 /M³
Rp 15,750.00
Rp 276.00
Rp 595.00
Rp 63.00
Rp 504.00
Rp 28.800
Rp 17,216.80 /M³
Rp 75,000.00
Rp 9,600.00
Rp 1,700.00
Rp 630.00
Rp 67.20
Rp 504.00
Rp 28.800
Rp 87,530.00 /M³
Rp 1,444,810.00
Rp 1,824,980.80
Rp 832,608.49
Rp 4,102,399.29 /M³
Rp 17,025.00
Rp 1,089.60
Rp 122,580.00
Rp 2,088.40
Rp 12,485.00
Rp 6,308.50
Rp 4,596.75
Rp 2,772.00
Rp 2,970.00
Rp 2,805.00
Rp 900.00
Rp 7,200.00
Rp 480.00
Rp 183,300.25 /M¹
Rp 102,500.00
Rp 4,944.00
Rp 929,745.00
Rp 171,074.00
Rp 82,661.10
Rp 34,391.50
Rp 27,877.50
Rp 1,680.00
Rp 1,800.00
Rp 1,700.00
Rp 540.00
Rp 4,320.00
Rp 288.00
Rp 1,363,521.10 /M¹
Rp 66,000.00
Rp 3,172.80
Rp 588,346.50
Rp 109,487.36
Rp 52,892.50
Rp 22,015.00
Rp 17,842.50
Rp 1,680.00
Rp 1,800.00
Rp 1,700.00
Rp 540.00
Rp 4,320.00
Rp 288.00
Rp 870,084.66 /M¹
Rp 10,000.00
Rp 638.40
Rp 71,820.00
Rp 1,223.60
Rp 7,315.00
Rp 3,515.00
Rp 2,700.00
Rp 2,772.00
Rp 2,970.00
Rp 2,805.00
Rp 900.00
Rp 7,200.00
Rp 480.00
Rp 114,339.00 /M¹
Rp 81,750.00
Rp 5,234.40
Rp 589,090.50
Rp 90,325.60
Rp 60,000.00
Rp 30,266.00
Rp 22,072.50
Rp 2,772.00
Rp 2,970.00
Rp 2,805.00
Rp 900.00
Rp 7,200.00
Rp 480.00
Rp 895,866.00 /M¹
Rp 51,000.00
Rp 3,271.20
Rp 368,181.00
Rp 6,272.56
Rp 37,500.00
Rp 18,907.00
Rp 13,792.50
Rp 2,772.00
Rp 2,970.00
Rp 2,805.00
Rp 900.00
Rp 7,200.00
Rp 480.00
Rp 516,051.26 /M¹
Rp 625,000.00
Rp 72,000.00
Rp 10,200.00
Rp 3,000,000.00
Rp 55,200.00
Rp 323,000.00
Rp 144,300.00
Rp 117,000.00
Rp 231,000.00
Rp 250,000.00
Rp 308,000.00
Rp 29,400.00
Rp 207,000.00
Rp 119,000.00
Rp 36,450.00
Rp 403,200.00
Rp 19,392.00
Rp 5,950,142.00 /M³
Rp 120,250.00
Rp 146,250.00
Rp 388,000.00
Rp 84,000.00
Rp 9,000.00
Rp 432,000.00
Rp 28,800.000
Rp 1,208,300.00 /M³
Rp 15,750.00
Rp 276.00
Rp 595.00
Rp 63.00
Rp 504.00
Rp 28.800
Rp 17,216.80 /M³
Rp 100,000.00
Rp 9,600.00
Rp 1,700.00
Rp 33,000.00
Rp 35,000.00
Rp 132,000.00
Rp 29,700.00
Rp 3,168.00
Rp 23,040.00
Rp 576.000
Rp 367,784.00 /M³
Rp 1,444,810.00
Rp 1,824,980.80
Rp 3,208,249.52
Rp 6,478,040.32 /M³
Rp 18,000.00
Rp 14,370.00
Rp 9,000.00
Rp 8,400.00
Rp 900.00
Rp 23,040.00
Rp 1,440.00
Rp 75,150.00 /M²
Rp 48,000.00
Rp 4,500.00
Rp 3,892.50
Rp 11,250.00
Rp 8,400.00
Rp 900.00
Rp 23,040.00
Rp 1,440.00
Rp 101,422.50 /M²
Rp 6,916.00
Rp 5,985.00
Rp 12,600.00
Rp 1,350.00
Rp 14,400.00
Rp 960.00
Rp 42,211.00 /M²
Rp 500.00
Rp 450.00
Rp 3,192.00
Rp 3,420.00
Rp 4,104.00
Rp 192.00
Rp 11,858.00 /M¹
AFOND /M²
Rp 1,820.00
Rp 4,500.00
Rp 11,700.00
Rp 5,355.00
Rp 567.00
Rp 1,440.00
Rp 240.00
Rp 25,622.00 /M²
Rp 7,500.00
Rp 18,600.00
Rp 6,600.00
Rp 5,100.00
Rp 1,440.00
Rp 240.00
Rp 39,480.00 /M²
Rp 15,000,000.00
Rp 1,620,000.00
Rp 192,000.00
Rp 432,000.00
Rp 28,800.00
Rp 17,272,800.00 /M³
Rp 400,000.00
Rp 225,000.00
Rp 24,000.00
Rp 72,000.00
Rp 4,800.00
Rp 725,800.00 /M²
Rp 350,000.00
Rp 180,000.00
Rp 19,200.00
Rp 57,600.00
Rp 3,840.00
Rp 610,640.00 /M²
Rp 2,500,000.00
Rp 150,000.00
Rp 2,650,000.00 /Bh
Rp 93,750.00
Rp 11,280.00
Rp 9,450.00
Rp 15,000.00
Rp 29,400.00
Rp 3,150.00
Rp 44,640.00
Rp 2,880.00
Rp 209,550.00 /M²
Rp 62,500.00
Rp 11,280.00
Rp 9,450.00
Rp 15,000.00
Rp 29,400.00
Rp 3,150.00
Rp 44,640.00
Rp 2,880.00
Rp 178,300.00 /M²
Rp 9,000.00
Rp 9,000.00 /Kg
Rp 600,000.00
Rp 13,500.00
Rp 1,440.00
Rp 1,080.00
Rp 57.60
Rp 616,077.60 /Bj
Rp 800,000.00
Rp 54,000.00
Rp 5,760.00
Rp 4,320.00
Rp 288.00
Rp 864,368.00 /Bh
Rp 500,000.00
Rp 18,000.00
Rp 1,920.00
Rp 1,440.00
Rp 96.00
Rp 521,456.00 /Bh
Rp 30,000.00
Rp 9,000.00
Rp 960.00
Rp 39,960.00 /Bh
Rp 98,560.00
Rp 13,500.00
Rp 1,440.00
Rp 1,080.00
Rp 57.60
Rp 114,637.60 /M²
RINCIAN RENCANA ANGGARAN BIAYA
NO NAMA JENIS PEKERJAAN An VOLUME SATUAN HARGA SATUAN
I PEKERJAAN PERSIAPAN
1. MEMBERSIHKAN & MERATAKAN TANAH An1 256 M² Rp 12,000.00
2. PAGAR PENGAMAN SENG AnLn 110 M¹ Rp 163,500.00
3. PASANG BOWPLANK An2 64 M¹ Rp 62,140.00
II PEKERJAAN TANAH
1. GALIAN TANAH An3 195.72 M³ Rp 32,640.00
2. URUG KEMBALI GALIAN TANAH An9 73.972 M³ Rp 15,648.00
3. URUG TANAH BAWAH LANTAI AnLn 196 M³ Rp 148,572.00
4. URUG PASIR An10 55.65 M³ Rp 202,560.00
5. URUG SIRTU An11 6.338 M³ Rp 212,400.00
III PEKERJAAN PONDASI
1. PEKERJAAN PASANGAN PONDASI BATU An12 96.05 M³ Rp 586,576.50
KALI 1PC : 3KP : 10PS
2. PEKERJAAN PASANGAN BATU KOSONG An15 26.68 M³ Rp 405,174.00
3. PEKERJAAN BETON FOOTPLAT An115i 22.42 M³ Rp 4,102,399.29
IV PEKERJAAN BETON BERTULANG
1. BALOK 15/25 (SLOOF DAN BALOK MENARA) An113i 272 M¹ Rp 183,300.25
2. KOLOM dia 50 CM An112i 212 M¹ Rp 1,363,521.10
3. KOLOM 40/40 An112i 193.8 M¹ Rp 870,084.66
4. RINGBALK 15/20 An113i 35.67 M¹ Rp 114,339.00
5. BALOK LANTAI 30/60 An113i 16 M¹ Rp 895,866.00
6. BALOK LANTAI 25/45 An113i 140 M¹ Rp 516,051.26
7. BETON TANGGA An111 0.14 M³ Rp 5,950,142.00
8. PLAT LANTAI T=12CM An105i 34.66 M³ Rp 6,478,040.32
9. BETON MULDING An105i 4.998 M³ Rp 6,478,040.32
10. BETON MENARA & KUBAH An105i 29.87 M³ Rp 6,478,040.32
V PEKERJAAN DINDING PASANGAN
1. PEKERJAAN TRASRAAM 1PC : 3 PS An18 210.98 M² Rp 75,150.00
2. PEKERJAAN DINDING BATA MERAH 1PC : An23 71.00 M² Rp 101,422.50
3KP : 10PS
VI PEKERJAAN PLESTERAN
1. PEKERJAAN PLESTERAN , TEBAL 15 MM An28 542.1 M² Rp 42,211.00
1PC : 4PS
2. PEKERJAAN LIST SUDUT PLESTERAN An37 500.98 M¹ Rp 11,858.00
1PC : 2PS
VII PEKERJAAN CAT & POLITUR
1. PEKERJAAN CAT INTERIOR EKSTERIOR An94 1105.46 M² Rp 25,622.00
2. PEKERJAAN CAT PLAFOND & PLAT LANTAI An94 352.2 M² Rp 25,622.00
3. PEKERJAAN POLITUR KUSEN An93 107.46 M² Rp 39,480.00
VIII PEKERJAAN KUSEN & DAUN PINTU JENDELA
1. PEKERJAAN KUSEN PINTU & JENDELA KAYU An40 2.72 M³ Rp 17,272,800.00
BENGKIRAI
2. PEKERJAAN PASANG PINTU PANEL KAYU AnLn 39.46 M² Rp 725,800.00
BENGKIRAI
3. PEKERJAAN PASANG PINTU & JENDELA AnLn 41.33 M² Rp 610,640.00
KACA KAYU BENGKIRAI
IX PEKERJAAN INSTALASI LISTRIK
1. PENYAMBUNGAN PLN AnLn 1 Bh Rp 2,500,000.00
2. TITIK LAMPU + STOP KONTAK AnLn 38 Bh Rp 150,000.00
X PEKERJAAN KERAMIK
1. PEKERJAAN LANTAI KERAMIK 50x50 An89i 322.07 M² Rp 209,550.00
2. PEKERJAAN LANTAI KERAMIK 40x40 AnLn 45.6 M² Rp 178,300.00
XI PEKERJAAN ALAT GANTUNG & KACA
PEKERJAAN ALAT GANTUNG PINTU KUSEN
1. PASANG ANGKUR AnLn 60 Kg Rp 9,000.00
PEKERJAAN ALAT GANTUNG PINTU
1. PEKERJAAN ENGSEL PINTU An82 27 Bh Rp 616,077.60
2. PEKERJAAN PASANG KUNCI TANAM ANTIK An79 3 Bh Rp 864,368.00
3. PEKERJAAN PASANG SELOT An85 6 Bh Rp 521,456.00
4. PEKERJAAN PASANG GRENDEL PINTU AnLn 18 Bh Rp 39,960.00
PEKERJAAN PASANG KACA
1. PEKERJAAN PASANG KACA 5 MM An86 41.33 M² Rp 114,637.60
XII JASA PERENC, PENGWS, DAN PENGELOLAAN
1. JASA PERENCANAAN AnLn 1 ˉ Rp 6,787,000.00
2. JASA PENGAWASAN AnLn 1 ˉ Rp 4,525,000.00
3. JASA PENGELOLAAN AnLn 1 ˉ Rp 2,262,000.00
AN BIAYA
HARGA PEKERJAAN KETERANGAN
Rp 25,033,960.00
Rp 3,072,000.00
Rp 17,985,000.00
Rp 3,976,960.00
Rp 49,284,581.86
Rp 6,388,300.80
Rp 1,157,513.86
Rp 29,120,112.00
Rp 11,272,464.00
Rp 1,346,191.20
Rp 159,126,507.23
Rp 56,340,672.83
Rp 10,810,042.32
Rp 91,975,792.08
Rp 1,049,444,260.09
Rp 49,857,668.00
Rp 289,066,473.20
Rp 168,622,407.11
Rp 4,078,472.13
Rp 14,333,856.00
Rp 72,247,176.40
Rp 833,019.88
Rp 224,528,877.49
Rp 32,377,245.52
Rp 193,499,064.36
Rp 23,056,144.50
Rp 15,855,147.00
Rp 7,200,997.50
Rp 28,823,203.94
Rp 22,882,583.10
Rp 5,940,620.84
Rp 41,590,685.32
Rp 28,324,096.12
Rp 9,024,068.40
Rp 4,242,520.80
Rp 100,859,835.20
Rp 46,982,016.00
Rp 28,640,068.00
Rp 25,237,751.20
Rp 8,200,000.00
Rp 2,500,000.00
Rp 5,700,000.00
Rp 75,620,248.50
Rp 67,489,768.50
Rp 8,130,480.00
Rp 28,353,187.21
Rp 540,000.00
Rp 16,634,095.20
Rp 2,593,104.00
Rp 3,128,736.00
Rp 719,280.00
Rp 4,737,972.01
Rp 13,574,000.00
Rp 6,787,000.00
Rp 4,525,000.00
Rp 2,262,000.00
REKAPITULASI ANGGARAN BIAYA
NAMA PROYEK : PENGADAAN MASJID "AL-ITTIHAD"
LOKASI : BABADAN, KADIPOLO, SENDANGTIRTO, BERBAH, SLEMAN, YOGYAKARTA
TAHUN : 2018
TERBILANG =
1,602,966,614
HARGA PER 1 M² =
350
Bouwher
Drs. Supono
19631221 199003 1007
GARAN BIAYA
HARGA SATUAN
Rp 25,033,960.00
Rp 49,284,581.86
Rp 159,126,507.23
Rp 1,049,444,260.09
Rp 23,056,144.50
Rp 28,823,203.94
Rp 41,590,685.32
Rp 100,859,835.20
Rp 8,200,000.00
Rp 75,620,248.50
Rp 28,353,187.21
Rp 13,574,000.00
Rp 1,602,966,614
= Rp. 4,579,905