QUALITY CONTROL MANUAL
RK ENGINEERING CO., LTD
| Land plot CN3.2K, Dinh Vu LZ. Hai An Dist. Haiphong, Haiphong 35000 Viet nam
FOR
SHOP CONSTRUCTION OF POWER BOILERS,
PRESSURE VESSELS, AND THEIR PARTS
TO
ASME BOILER & PRESSURE VESSEL
CODE SECTION I, AND SECTION VIII DIVISION 1
(ENGLISH VERSION)
RK Prepared by | RK Approved by AT Accepted by
(QC Manager) (General Director) (Authorized Inspector)
Sign/Date Sign/Date Sign/Date
a
We cryin | (TAB
TIM ‘te
IL Sep - 2045 11-Sep-20 Ue Soph Zor.
Quality Control Manual No. : RKQCMO1 Revision 4
Controlled or Uncontrolled
Controlled ( Control No.: RKQCMO1 - )
Uncontrolled
ASMEQUALITY CONTROL MANUAL
RK ENGINEERING CO.,LTD
il Land plot CN3.2K, Dinh Vu .Z. Hai An Dist. Haiphong, Haiphong 35000 Viet nam
[Section
SECTION | : REVISION SHEET [Revision
1
4
Page
of3
Revision
Description Issue Date
Remark
First issue Mar ,O1st,2012
= Section 0, Section 1-1 was changed to
reflect the changings of the Manual
= Section 5.4.1(a) add “ paragraph U-4 and
PG-4” to specify the rule of the Code.
* Section 5 para, 5.4.2 was renamed and
rearranged
= Section 5 add new para. 5.4.3 “Design by |
others”
* Section 5 add new para. 5.4.4 “Drawings |
supplier by customers”
* Section 5 add new para. 5.5 “Computer
programs”
* Section 9 para. 9.5 (c) add “QW-350,
QW-360 “ to specify the rule of the Code
* Section 10 add new para. 10.4 (e) to
specify the rule of the Code for UT.
* Section 10 para. 10.10 add “and re-
demonstration” for clarification this para.
* Section 13 add new para. 13.2 (d) for
clarification this para.
+ Section 13 add new para. 13.5 for
clarification this para.
+ Section 13 table 13 add “No‘6 Pressure
parts documentation and certification”
* Section 14 add new para. 14.3 (f) to
specify the rule of the Code.
= Section 14 add new para. 14.4 “Exhibit
14-F" for clarification this para.
+ Section 16 Exhibit No 2-B deleted word
Addenda.
+ Section 16 add new Exhibit 14-F “Log
of National Board Serial Number”
| Nov,16th,2012QUALITY CONTROL MANUAL
RK ENGINEERING CO.,LTD
Land plot CN3.2K, Dinh Vu LZ. Hai An Dist, Haiphong, Haiphong 35000 Viet nam
SECTION 1 : REVISION SHEET
|Section
[Revision
la
Page
2 of 3
Description
Issue Date
Remark
* Section 0, Section 1-1 was changed to
reflect the changings of the Manual
* Section 3 add, new para, 3.3 “Authority
and responsibility for the Factory
Manager” and rearranged para 3.33.10 as,
new 3.43.11
* Section 4 add “Factory Manager’ in
organization chart and revised the line of
Authority
* Section 5 subpara. 5.2.2 was changed the
erson approved Manufacturing
instruction from GDM and Table 5
was change the person, approved the
Purchase Order from GD>FM
* Section 6 subpara. 6.2.1(c) was changed
Procurement instead Production ,
subpara. 6.2.2( c) was changed the
Procurement instead Engineering and
subpara. 6.2.3 was changed the person
approved the Purchase Order from
FM,
= Section 11 was revised the heat treatment
shall be performed by the RK (Not by
Subcontractor)
* Section 16 revised Exhibit 14-A (Requires
by ASME Section VIII Div.1 2013 Edition)
and Revised Exhibit 8B add 01 page
Dec, 20,2013
* Section 13 subpara. 13.2 (c) was changed
the date to submit the MDR for NB’
registration from 60days to 30days
* Section 1-2 was changed the Officer’s
Signature of the RK ENGINEERING CO.,LTD
* Section 16 revised Exhibit 6-C (Receiving
Inspection Record) and 6-E (Cutting Plan)
June, 08,2015,