You are on page 1of 130
QUALITY CONTROL MANUAL RK ENGINEERING CO., LTD | Land plot CN3.2K, Dinh Vu LZ. Hai An Dist. Haiphong, Haiphong 35000 Viet nam FOR SHOP CONSTRUCTION OF POWER BOILERS, PRESSURE VESSELS, AND THEIR PARTS TO ASME BOILER & PRESSURE VESSEL CODE SECTION I, AND SECTION VIII DIVISION 1 (ENGLISH VERSION) RK Prepared by | RK Approved by AT Accepted by (QC Manager) (General Director) (Authorized Inspector) Sign/Date Sign/Date Sign/Date a We cryin | (TAB TIM ‘te IL Sep - 2045 11-Sep-20 Ue Soph Zor. Quality Control Manual No. : RKQCMO1 Revision 4 Controlled or Uncontrolled Controlled ( Control No.: RKQCMO1 - ) Uncontrolled ASME QUALITY CONTROL MANUAL RK ENGINEERING CO.,LTD il Land plot CN3.2K, Dinh Vu .Z. Hai An Dist. Haiphong, Haiphong 35000 Viet nam [Section SECTION | : REVISION SHEET [Revision 1 4 Page of3 Revision Description Issue Date Remark First issue Mar ,O1st,2012 = Section 0, Section 1-1 was changed to reflect the changings of the Manual = Section 5.4.1(a) add “ paragraph U-4 and PG-4” to specify the rule of the Code. * Section 5 para, 5.4.2 was renamed and rearranged = Section 5 add new para. 5.4.3 “Design by | others” * Section 5 add new para. 5.4.4 “Drawings | supplier by customers” * Section 5 add new para. 5.5 “Computer programs” * Section 9 para. 9.5 (c) add “QW-350, QW-360 “ to specify the rule of the Code * Section 10 add new para. 10.4 (e) to specify the rule of the Code for UT. * Section 10 para. 10.10 add “and re- demonstration” for clarification this para. * Section 13 add new para. 13.2 (d) for clarification this para. + Section 13 add new para. 13.5 for clarification this para. + Section 13 table 13 add “No‘6 Pressure parts documentation and certification” * Section 14 add new para. 14.3 (f) to specify the rule of the Code. = Section 14 add new para. 14.4 “Exhibit 14-F" for clarification this para. + Section 16 Exhibit No 2-B deleted word Addenda. + Section 16 add new Exhibit 14-F “Log of National Board Serial Number” | Nov,16th,2012 QUALITY CONTROL MANUAL RK ENGINEERING CO.,LTD Land plot CN3.2K, Dinh Vu LZ. Hai An Dist, Haiphong, Haiphong 35000 Viet nam SECTION 1 : REVISION SHEET |Section [Revision la Page 2 of 3 Description Issue Date Remark * Section 0, Section 1-1 was changed to reflect the changings of the Manual * Section 3 add, new para, 3.3 “Authority and responsibility for the Factory Manager” and rearranged para 3.33.10 as, new 3.43.11 * Section 4 add “Factory Manager’ in organization chart and revised the line of Authority * Section 5 subpara. 5.2.2 was changed the erson approved Manufacturing instruction from GDM and Table 5 was change the person, approved the Purchase Order from GD>FM * Section 6 subpara. 6.2.1(c) was changed Procurement instead Production , subpara. 6.2.2( c) was changed the Procurement instead Engineering and subpara. 6.2.3 was changed the person approved the Purchase Order from FM, = Section 11 was revised the heat treatment shall be performed by the RK (Not by Subcontractor) * Section 16 revised Exhibit 14-A (Requires by ASME Section VIII Div.1 2013 Edition) and Revised Exhibit 8B add 01 page Dec, 20,2013 * Section 13 subpara. 13.2 (c) was changed the date to submit the MDR for NB’ registration from 60days to 30days * Section 1-2 was changed the Officer’s Signature of the RK ENGINEERING CO.,LTD * Section 16 revised Exhibit 6-C (Receiving Inspection Record) and 6-E (Cutting Plan) June, 08,2015,

You might also like