You are on page 1of 20
DEFINITE TIME OVERCURRENT AND EARTH FAULT RELAY TYPE CTU Commissioning Instructions v. GEC ALSTHOM INDIA CONTENTS Page: 1.0 INTRODUCTION 1 2.0 DESCRIPTION 1 21, cuts 1 22 ctu iz 2 30. INSTALLATION 3 Location a Mounting 3 rowout case 4.0 COMNIISSIONING 4 4.1 General inspection 4 42 witing Check 4 4,3. Insulation Test 4 4.4 CTCHECKS Polarity check 4 Ratlo check 5 4.5 SECONDARY INJECTION TESTS 5 4,6 TRIPAND ALARM CURRENT CHECK 6 4.7 LOADTESTS 6 5.0 MAINTENANCE Inspection % Drowout cose 7 Non-Drawout cose 7 Dust filter 7 Attracted Armature units 7 Mechanical settings 6 Contacts 8 (Operation indicators ° 6.0 RELAY TECHNICAL DATA CT REQUIREMENT 9 (CURRENT SETTINGS 9 Definite Time Unit 8 Transient Overreech 9 Resotting Current 10 TIME SETTINGS, 10 Definite time unit 10 Opercting Time of Instantanoous highset unit a Reset time 10 ‘Ovorshoot 10 Accuracy 10 Instantoneous highset " AC Burden u Thermal withstand nu ‘Auxitory Supply nv Contacts n Operation indicator 12 Insulation 12 Impube withstangtevel 12 High Frequency Distursance: 12 Cunent Transtormar Requirement re UsT OF ILLUSTRATIONS Ie

You might also like