IR — INSPECTION REQUEST
Contractor No.: AWQ0109
ExxonMobil 5,j.a7i: Ec
Produced Water Treatment M109
WEST QURNA I~ SECTION:
vocamons0s@ ] NOUR ce-conan ma | SUE DATE: 23 Apel 2037 creme
cose em | mes TSPECTONREQURED DATEZA primi? |THE:
nsrcorearcn GRRE ET ASraS o> oan REC EARTH
: TGR CED: CDDDH-DTREV FOUNDATION FOR PRE SEPARATOR BE
REF. Raw: lenoso WANSESTON a DEAL
mi Ta C1099. 0PGAC 070001 V1 CNL RSPECTON AND TEST AW 7]
mene
(ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/MFCO-
‘Our request the inspection of the following works for certificate/ witness that all tems has been properly executed in
accordance with approved procedures, specifications, drawings and all items has been coordinated with future works.
DISCRIPTION OF WORK TO BE INSPECTED:
‘Sampling the sub-grade layer inside the tank for the purpose of compaction degree test in DSS
ana
Tiny The Resoly hey Aaaes
Qlaccerteo CaccerTeD WITH COMMENTS OoReecTED
OiWorkis not ready
Glunacceptable inspection result
Osee comments
Ci Tek THis 80x IF “NO” EMIL / SOC and if itis a “WITNESS” as per ITP,
(by tekng this box means CPECC needs to produce al the related documents and sign / close this I)
SIGNATURE FOR NOTIFICATION ACKNOWLEGEMENT
SUBCONTRACTOR CPECC ‘COMPANY - ‘OTHERS
PRINT NAME: PRINT NAME: PRINT NAME RINT NAME
doertoSderd Mo = Vrsse. Shay
SIGNATUI
‘SIGNATURE: p> men ‘SIGNATURE:
= c Yo
sl VE "2
pare: 24 LF foare: 24 pv) | [pate 2 ¢//ea, | DATEiia i ——||I a i
URGE REEMRIEE |] (@ 7A) ia Haney)
i ail ii Ht a H i uals i
iil iat te ial He A i &
i if ae Lae
te ee a
i. lig get i 1
tied il
HeExxonMobil
Ecc
West Qurna | Form No. F70101Q
Contract:AWQ0109 Rev. 0
Project Location: Basra, Iraq Serial No.
QUALITY CHECKSHEET - SOIL INSPECTION CHECKLIST
[Tag Description | Produced Water teatment Tag No. [Dssm09
Contract No. AWQO109 ‘System No. |
Contractor | crrce _ ‘Sub-System No.
Drawing Reference | 1QWQ-CE1091-CDFND-D8-0002__| Location Ds8 1
raingNo 1QWO-CEIOI-CDND-Desno2
speciteaionos QV@FT-NSPDS-00-040901 REV.I BARTHWORK
Nw
1, Excavation cleared of foreign and loose material don,
NA
2, Slopes shored or correctly stepped. Nh
7
3. Fill Material cleans and conforms to requirements fw ls
4. Lift thickness and compaction procedures in accordance with specifications. -
5. Final elevation in accordance to drawings. v a
6, Moisture control acceptable, be a
7. Compaction Method and Equipment. v a
Remarks
Contract Constraction Ro: ContacioriOvaliy Ren] Company Rep
wane Whe Via\vo ee ane Unsgecm Slot p, | Some Uocsicon Wa 07
— Signe ae =< :
bow 24 C] = Coy Dae p= d21 4 pw 2M [ONE
Pit