IR - INSPECTION REQUEST
WEST QURNA |~SECTION-1
T
M Contractor No.: AWQ0109
Exon obi Project Title: Eco
Produced Water Treatment M109
LocaTion: 05-6 | IRNO:RNoCEC0226 | iRISSUE DATE: 18 April 2017 DISCIPLINE: Civil
SUBJECT: witness INSPECTION REQUIRED DATE:19 April 2017 ‘TIME:10:30
REF.SPECIFICATION: TQWO-FT-NSPDS-00-040901 REV.1 EARTHWORK
TQWO-CE1091-COFND-D6-0006 REV.0 FOUNDATION FOR PLATFORM NEAR TANK
REF. DRAWINGS: 1QD6-ABJ681050 PLAN SECTION & DETAILS & IQWQ-CE1091-CDFND-D6-0007 REV.0
FOUNDATION FOR SHELTER 1QD6-PBE681052 A/B & PAX681051 A/B PLAN &SECTION
RFF. ITP: 1QWO-CE1092-CPQAC-00-0001CIVIL REV. D INSPECTION AND TEST PLAN
(OTHERS REF.
"ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOR: [epecc/meco
‘Our request the inspection of the following works for certficate/ witness that all tems has been properly executed in
accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works.
DISCRIPTION OF WORK TO BE WITNESS:
Inspection the elevations of the fourth layer around the tank foundation in DSS.
‘COMMENTS:
Claccepteo ClaccerTeD WITH COMMENTS Giresected:
Oiwork is not ready
Cunacceptable inspection result
| see comments
Di Tick THis BOX IF “NO” EMIL / SOC and if it is a “WITNESS” as per ITP,
{by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
‘SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
a a) eS
SUBCONTRACTOR cece COMPANY oTHERS
PRINT NAME; PRINT NAME: PRINT NAME PRINT NAME
Waid Waleed | ch7209 Teo Pesce Ax
SIGNATURE:
pare: 1-L\ aoe [ares 19-291) | aT) 7/4/2619
DATE:al Trading & Contracting
plagill jJae Asp
Autall CA glial! 9 Bla!
www.mfcoig.com
Elevation of the fourth layer ground the tank foundation in DS6
NO BM BS HL ES Elev_| F.S.req
[ 2.997 | 1.514 | 4.514 2.575 | 1.936
1 1.877
2 19
3 1.877 _|
4 1.925
5 1.925
6 1.93
| 7 1.934
8 19
9 4.873
ao | | 1.927 -
14 4.904
12 1.957
13
ee pay
MFCO SURVEYOR CPECC SURVEYOR ExxonMobil
Mohammed Ahmed Shi zong tao Thaer malik
vier wry