IR — INSPECTION REQUEST
WEST QURNA |= SECTION-1
Contractor No.: AWQ0109
ExxonMobil aa Es
Project Title:
Produced Water Treatment M109
Locarion: 05-7 | 1RNO: IR No CE-CO029 | IRISSUE DATE: 05 February 2017 DISCIPLINE: civil
sumect: wirness INSPECTION REQUIRED DATE:06 February 2017 _| TIME:13:00
oo case alana tammaae
REF. DRAWINGS: 1QWO-CE109%-(BPLT-D7-0001 REV. D57 PLOT PLAN
RFF.ITP: IQWO-CE1092-CPQAC-00-0001CIVIL REV, C INSPECTION AND TEST PLAN
OTHERS RE
"ATTACHMENT /CHECK LIST IF ANY: :
[NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/AL MADAR
‘Our request the inspection of the following works for certficate/witness that all Items has been properly executed in
accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works.
DISCRIPTION OF WORK TO BE WITNESS:
witness to take samples for the second layer (test 11 points) in DS7
‘COMMENTS:
aM pels Rated / atlehe Hh ongud Rugeh
Clacceeren COACcEPTED WITH COMMENTS resecreD
work's not ready
Dnacceptable inspection resut
]See comments
Tex THIS BOX IF “NO” EMIL / SOC and fit isa “WITNESS” as per ITP,
{by ticking this box means CPECC needs to produce all the related documents and sign / close this !R)
‘SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
‘SUBCONTRACTOR ‘cPEC ‘COMPANY OTHERS
PRINT NAME: PRINT NAME: PRINT NAME. PRINT NAME
Kalbe Doheeh Ma Gamp— Vsse'a Shodhy
SIGNATURE: | Biewarune: SIGNATO SIGNATURE:
y
& 3
DATE: 6 -9- go¥]_| DATE: 6-2-2017 | DATE ig-Feb Dig | vate:AL FAO COMPANY
rel SINT tN cM SN cd
(oe reer oA he ton bl ae
(CUD RW ie) fal] Geta i]
No: 949
Date: 11/02/2017
Fao Code:740/17
‘Yo\ China Petroleum Engineering & Construction Corporation
‘Sub\ Test Report (Compaction of Soil)
Information requested test :
No, @ Date of test request
CE-CO029@ 05 -02-2017 Site Al-fao lab/ DS7/ Second Layer CPECC/AL-MADAR
‘Test date : 07-02-2017
Result:
‘Moisture content
(%)
1 i 25 88.
2 1 2 24 89
3 3 25 87
4 4 22 89
5 2 5 22 90
6 6 22 1.540 89
1 4 7 25 1.483 86
8 8 23 1.564 90
9 a 9 2 1.597 92.
10 10 25 1,531 89
uf 5 i 23 1.571 on
6 89
id 93,
Notes: The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (D2937-07).
‘The result represents sample tested only.
= The Sample brought and received by Mr. (
Executive Manager
Ablam Almansor
é- Abas:
Pract)ExonMobil Eco
West Qua | Form No. F70102Q
Contract:AWaQ0109 Rev. 0
Project Location: Basra, Iraq Serial No,
QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD
Tag Description Tag No. O:
Contract No. Aweolod ‘System No.
Contractor Opect ‘Sub-System No. ZW dS]
Drawing Reference aud-celof_ipalmpper| | Location DS? AU piven.
Drawing No. JGluih-( EUd- lpi] -Pfro} specification No LF] App -00- 09] Test Date Zor) 2-1!
Type Fill ace} Lif Thickness _ oom ‘Min. Compaction Required: 2%
Laboratory Standard:
Te ispadion Date 2217.3.) Max. Density 1-724 9”*VZem? Optimum Moisture 2k
Field Test Equip:
‘Type SIN Correction Factor
Location Sketch Te | Pewee | me] a | comme [tae
‘ zs less | $8
z ze |pse | 39
3 siz | 2]
4 ze _| 1536 | 89
§ zu | fssr | Qo
é av Lasgo | #7
Comments:
Contractor/Construetion Rep. Contractor/Quality Rep. ‘Company Rep.
= Ma_& =
Signature et 7 Signature:
Pat A ee ns dt} Date
“p11