You are on page 1of 5
IR — INSPECTION REQUEST WEST QURNA |= SECTION-1 Contractor No.: AWQ0109 ExxonMobil aa Es Project Title: Produced Water Treatment M109 Locarion: 05-7 | 1RNO: IR No CE-CO029 | IRISSUE DATE: 05 February 2017 DISCIPLINE: civil sumect: wirness INSPECTION REQUIRED DATE:06 February 2017 _| TIME:13:00 oo case alana tammaae REF. DRAWINGS: 1QWO-CE109%-(BPLT-D7-0001 REV. D57 PLOT PLAN RFF.ITP: IQWO-CE1092-CPQAC-00-0001CIVIL REV, C INSPECTION AND TEST PLAN OTHERS RE "ATTACHMENT /CHECK LIST IF ANY: : [NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/AL MADAR ‘Our request the inspection of the following works for certficate/witness that all Items has been properly executed in accordance with approved procedures, specifications, drawings and all tems has been coordinated with future works. DISCRIPTION OF WORK TO BE WITNESS: witness to take samples for the second layer (test 11 points) in DS7 ‘COMMENTS: aM pels Rated / atlehe Hh ongud Rugeh Clacceeren COACcEPTED WITH COMMENTS resecreD work's not ready Dnacceptable inspection resut ]See comments Tex THIS BOX IF “NO” EMIL / SOC and fit isa “WITNESS” as per ITP, {by ticking this box means CPECC needs to produce all the related documents and sign / close this !R) ‘SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT ‘SUBCONTRACTOR ‘cPEC ‘COMPANY OTHERS PRINT NAME: PRINT NAME: PRINT NAME. PRINT NAME Kalbe Doheeh Ma Gamp— Vsse'a Shodhy SIGNATURE: | Biewarune: SIGNATO SIGNATURE: y & 3 DATE: 6 -9- go¥]_| DATE: 6-2-2017 | DATE ig-Feb Dig | vate: AL FAO COMPANY rel SINT tN cM SN cd (oe reer oA he ton bl ae (CUD RW ie) fal] Geta i] No: 949 Date: 11/02/2017 Fao Code:740/17 ‘Yo\ China Petroleum Engineering & Construction Corporation ‘Sub\ Test Report (Compaction of Soil) Information requested test : No, @ Date of test request CE-CO029@ 05 -02-2017 Site Al-fao lab/ DS7/ Second Layer CPECC/AL-MADAR ‘Test date : 07-02-2017 Result: ‘Moisture content (%) 1 i 25 88. 2 1 2 24 89 3 3 25 87 4 4 22 89 5 2 5 22 90 6 6 22 1.540 89 1 4 7 25 1.483 86 8 8 23 1.564 90 9 a 9 2 1.597 92. 10 10 25 1,531 89 uf 5 i 23 1.571 on 6 89 id 93, Notes: The test for M.D.D done according to(ASTM D 1557-002), and for soil test according to (D2937-07). ‘The result represents sample tested only. = The Sample brought and received by Mr. ( Executive Manager Ablam Almansor é- Abas: Pract) ExonMobil Eco West Qua | Form No. F70102Q Contract:AWaQ0109 Rev. 0 Project Location: Basra, Iraq Serial No, QUALITY CHECKSHEET - FIELD COMPACTION TEST RECORD Tag Description Tag No. O: Contract No. Aweolod ‘System No. Contractor Opect ‘Sub-System No. ZW dS] Drawing Reference aud-celof_ipalmpper| | Location DS? AU piven. Drawing No. JGluih-( EUd- lpi] -Pfro} specification No LF] App -00- 09] Test Date Zor) 2-1! Type Fill ace} Lif Thickness _ oom ‘Min. Compaction Required: 2% Laboratory Standard: Te ispadion Date 2217.3.) Max. Density 1-724 9”*VZem? Optimum Moisture 2k Field Test Equip: ‘Type SIN Correction Factor Location Sketch Te | Pewee | me] a | comme [tae ‘ zs less | $8 z ze |pse | 39 3 siz | 2] 4 ze _| 1536 | 89 § zu | fssr | Qo é av Lasgo | #7 Comments: Contractor/Construetion Rep. Contractor/Quality Rep. ‘Company Rep. = Ma_& = Signature et 7 Signature: Pat A ee ns dt} Date “p11

You might also like