IR— INSPECTION REQUEST
WEST QURNA | ~SECTION-1
Contractor No.: AWQ0109
ExonMobil
Project Title: Eco
Produced Water Treatment M109
LOCATION
Antimena Batch | IRNO:IR NoCE-C00a3 | IRISSUE DATE; 13 February 2017 DISCIPLINE:
Plant #
SUBIECT: Witness INSPECTION REQUIRED DATE:14 February 2017 | TIME:11:00,
REF.SPECIFICATION: IQWQ-FT-NSPDS-00-040101 REV.0 CONCRETE DESIGN AND CONSTRUCTION
1QWQ-CE1091-COFND-D7-0003 REV.1 FOUNDATION FOR PRODUCED WATER TANK
ieee 1Q107-A8/681053 PLAN SECTION & DETAIL
RFF. ITP: 1QWA-CE1092-CPCAC-00-0002 REV.C CIVIL INSPECTION AND TEST PLAN
(OTHERS REF. 1QWA-CE1092-KRTST-00-0001 REV.0 CONCRETE MIX DESIGN TEST REPORT
[ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOF CPECC/MECO |
‘Our request the inspection of the following works for certificate/witness that all tems has been properly executed in
accordance with approved procedures, specifications, drawings and all items has been coordinated with future works.
DISCRIPTION OF WORK TO BE WITNESS:
Witness to make trial mix cubes
one ge
Sp awake deus thd fly poPty of peal he
ee at OSL pncant ait Sane
Caccepreo CaccePteD with comments Devecteo
Olworkis not ready
Dlunacceptable inspection result
[etSee comments
Dick Tis 80x iF “NO” EMnL / SOC and fits "WITNESS" as per TP,
(by ticking this box means CPECC needs to produce all the related documents and sign / close ths IR)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
SUBCONTRACTOR cPECC COMPANY OTHERS
PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME
Ualid vovleel | lec on 4 Hassan shosles
SToNATORE a SIGNATURE, ‘SIGNATURE: LE ‘SIGNATURE
pate: j>~ Qo\F | pare: spr 2] pate: // Feb. 2.\7| pate:
Tt