16/10/2018
Installation of new Isolation valve connection for nitrogen recharging (tank P3) of actuator
using the t Loctite product.
17/10/2018
Recommendations:
Monitoring the nitrogen pressure periodically
LVS5
Activity:
17/10/2018
Recommendations:
Monitoring the nitrogen pressure periodically
LVS4
Activity:
17/10/2018
Recommendations:
Monitoring the nitrogen pressure periodically
LVS3
Activity:
16/10/2018
Replacement of damaged hexagonal nipple of N2 tank (P3) of actuator using the Loctite
product.
Major oil leak was detected from the stop screw of actuator.
17/10/2018
Recommendations:
Monitoring the nitrogen pressure periodically
Oil leak to be fixed with adequate tools and fill up the tank .
LVS2
Activity:
16/10/2018
Replacement of hexagonal reducing nipple for nitrogen recharging not yet achieved due to
difficulty of loosening the nipple (special tools to be use on Gabes ).
17/10/2018
Recommendations
Monitoring the nitrogen pressure periodically
LVS1
Activities:
16/10/2018
Replacement of damaged hexagonal nipple of N2 tank (P3) of actuator using the Loctite
product.
Recommendations: