LVS6

16/10/2018

 Installation of new Isolation valve connection for nitrogen recharging (tank P3) of actuator
using the t Loctite product.

17/10/2018

 Filing N2 and pressure to 90 bar


 Detecting of some leak using spray detector
 Repair the leak and pressure maintained at 90 bar

Recommendations:
 Monitoring the nitrogen pressure periodically

LVS5

Activity:
17/10/2018

 Filing N2 and pressure to 90 bar


 Detecting of some leak using spray detector
 Repair the leak and pressure maintained at 90 bar

Recommendations:
 Monitoring the nitrogen pressure periodically

LVS4

Activity:
17/10/2018

 Filing N2 and pressure to 90 bar


 Detecting of some leak using spray detector
 Repair the leak and pressure maintained at 90 bar

Recommendations:
 Monitoring the nitrogen pressure periodically
LVS3

Activity:
16/10/2018

 Replacement of damaged hexagonal nipple of N2 tank (P3) of actuator using the Loctite
product.
 Major oil leak was detected from the stop screw of actuator.

17/10/2018

 Filing N2 and pressurized to 90 bar


 Detecting of some leak using spray detector
 Repair the leak and pressure maintained at 90 bar

Recommendations:
 Monitoring the nitrogen pressure periodically
 Oil leak to be fixed with adequate tools and fill up the tank .

LVS2

Activity:
16/10/2018

 Replacement of hexagonal reducing nipple for nitrogen recharging not yet achieved due to
difficulty of loosening the nipple (special tools to be use on Gabes ).

17/10/2018

 Filing N2 and pressure to 45 bar (only two bottles )

Recommendations
 Monitoring the nitrogen pressure periodically