WEEKLY REPORT _SCAFFOLDINGS o
r
PROJECT : 7761 Indirect
M
CLIENT : Daewoo Engineering Construction & Company Mob +
i
REPORT NO sTotal
l
e
PRODUCTIVITY REPORT Week Ending : 8-Jan-16 n
i
ESTIMATED REVISED QTY with REVISED NORMS ACTUAL CUMULATIVE ACTUAL WEEKLY MANHOURS % COMPLETED o
u
SR. NO. ACTIVITY UNIT Remarks
EST PROD PROD. PROD. PROD. s
Qty MHRS Qty MHRS Qty MHRS Qty MHRS Earned Cum Earned Today Weekly To-Date
(mhr/unit) (mhr/unit) (mhr/unit) (mhr/unit)
H
r
TOWER s
Erection
1 Upto 10m M3 68,381.07 0.50 34,191 71,980.08 0.50 35,990 11,308.99 0.50 5,680 610.00 0.41 250 (25.5) 55.0 0.8% 15.7% ###

2 10m to 20m M3 34,190.53 0.58 19,660 35,990.03 0.58 20,874 1,481.50 0.58 858 200.00 0.58 116 1.0 0.0 0.6% 4.1% ###

3 21m to 30m M3 5,698.42 0.63 3,562 5,998.34 0.67 4,019 1,046.00 0.67 700 400.00 0.67 268 0.6 0.0 6.7% 17.4% ###
4 31m to 40m M3 - - - - - - ###

5 41m to 50m M3 - - - - ###


108,270 0.53 57,413 113,968 0.53 60,883 13,836 0.52 7,238 1,210 0.52 634 (24) 55 1.1% 12.1% ###
Dismantle
1 Upto 10m M3 68,381.07 0.25 17,095 71,980 0.25 17,995 2,662 0.25 659 498 0.25 124 6.6 0.5 0.7% 3.7% ###

2 10m to 20m M3 34,190.53 0.29 9,830 35,990 0.29 10,437 348 0.29 100 - - - 0.9 0.0 0.0% 1.0% ###

3 21m to 30m M3 5,698.42 0.31 1,781 5,998 0.33 1,979 54 0.31 17 - 0.8 0.0 0.0% 0.9% ###

4 31m to 40m M3 - - - ###


5 41m to 50m M3 - - - ###
108,270 0.27 28,706 113,968 0.27 30,412 3,064 0.25 776 498 0.25 124 8 1 0.4% 2.7% ###

FOR RMT
TOWER TOTAL (FOR RMT) 216,540.04 0.40 86,119.00 227,936.90 0.40 91,294.73 16,900.89 0.47 8,014.43 1,708.00 0.44 758.00 (15.51) 55.50 1.5% 14.8%

Hanging/ Suspended /Support Scaffold


Erection
1 Upto 10m M2 61,405.05 1.11 68,228 64,303.56 1.33 85,524 24,177 1.33 32,206 1,850 1.24 2,300 (51.2) 160.5 2.9% 37.6% ###

2 10m to 20m M2 55,264.55 1.28 70,616 57,873 1.53 88,546 30,744 1.53 47,038 1,650 1.53 2,522 0.5 2.5 2.9% 53.1% ###

3 21m to 30m M2 4,093.67 1.39 5,686 4,287 1.76 7,545 6,721 1.79 12,006 - (177.4) 0.0 0.0% 156.8% ###

4 31m to 40m M2 - - - ###


120,763.27 1.20 144,530.00 126,463.68 1.44 181,614.71 61,641.40 1.48 91,249.86 3,500.00 1.38 4,822.00 (228.09) 163.00 2.8% 48.7% ###
Dismantle
1 Upto 10m M2 61,405.05 0.56 34,114 64,303.56 0.67 43,083 18 0.50 9 - 3.1 0.0 0.0% 0.0% ###

2 10m to 20m M2 55,264.55 0.64 35,308 57,873 0.77 44,562 203 0.76 155 - 1.3 0.0 0.0% 0.4% ###

3 21m to 30m M2 4,093.67 0.69 2,843 4,287 0.74 3,172 1,107 0.74 816 - 3.4 0.0 0.0% 25.8% ###

4 31m to 40m M2 - - - ###


120,763.27 0.60 72,265.00 126,463.68 0.72 90,818.07 1,328.00 0.74 979.78 - - - 7.77 - 0.0% 1.1% ###
FOR RMT

HANGING/SUSPENDED/SUPPORT TOTAL (FOR RMT) 241,526.54 0.90 216,795.00 252,927.36 1.08 272,432.78 62,969.40 1.46 92,229.64 3,500.00 1.38 4,822.00 (220.32) 163.00 2.8% 49.8%

Cantilever
Erection
2.1 Upto 10m M2 1.22 14,115.42 1.40 19,762 4,217.72 1.47 6,200 250.00 0.66 164 (295.2) 186.0 1.8% 29.9% ###
2.2 10m to 20m M2 1.41 12,704 1.61 20,453 4,585 1.62 7,419 580 1.22 705 (37.9) 228.8 4.6% 36.1% ###

2.3 21m to 30m M2 1.53 941 1.85 1,741 1,319 1.85 2,436 246 1.85 454 4.0 1.1 26.1% 140.2% ###

2.4 31m to 40m M2 1.71 - - - - - - ###


- - - 27,760.32 1.51 41,955.72 10,121.42 1.59 16,055.45 1,076.00 1.23 1,323.00 (329.15) 415.90 3.9% 36.5% ###
Dismantle
2.1 Upto 10m M2 0.61 14,115 0.70 9,881 114 0.69 79 - 0.8 0.0 0.0% 0.8% ###

2.2 10m to 20m M2 0.70 12,704 0.81 10,290 72 0.66 48 - 10.5 0.0 0.0% 0.6% ###

2.3 21m to 30m M2 0.76 941 0.93 875 316 0.93 293 - 0.9 0.0 0.0% 33.6% ###
2.4 31m to 40m M2 0.86 - - - ###
- - 27,760.32 0.76 21,046.09 502.00 0.84 419.79 - - - 12.21 - 0.0% 1.8% ###
FOR RMT

CANTILEVER TOTAL (FOR RMT) - - - 55,520.64 1.13 63,001.81 10,623.42 1.55 16,475.24 1,076.00 1.23 1,323.00 (316.94) 415.90 3.9% 38.3%

Additional Board /Additional Decking


Erection
1 Upto 10m M2 0.29 5,537.68 0.29 1,606 1,063.00 0.29 308 276.00 0.29 80 0.3 0.0 5.0% 19.2% ###

2 10m to 20m M2 0.33 2,769 0.33 914 81 0.38 31 - (4.3) 0.0 0.0% 2.9% ###

3 21m to 30m M2 0.36 462 0.38 175 10 0.30 3 10 0.30 3 0.8 0.8 2.2% 2.2% ###

4 31m to 40m M2 0.40 - - - ###


Dismantle - - 8,768.05 0.31 2,695.02 1,154.00 0.30 342.00 286.00 0.29 83.00 (3.20) 0.84 3.3% 13.2% ###
3
Additional Board / M2
Additional Decking
1 Upto 10m M2 0.14 5,537.68 0.14 775 122.00 0.13 16 42.00 0.12 5 1.1 0.9 0.8% 2.2% ###

2 10m to 20m M2 0.16 2,769 0.16 443 32 0.16 5 32 0.16 5 0.1 0.1 1.2% 1.2% ###

3 21m to 30m M2 0.18 462 0.19 88 - - - 0.0 0.0 0.0% 0.0% ###

4 31m to 40m M2 0.20 - - - ###


- - 8,768.05 0.15 1,305.98 154.00 0.14 21.00 74.00 0.14 10.00 1.20 1.00 0.8% 1.8% ###

FOR RMT

ADD BOARD/ADDITIONAL DECKING TOTAL (FOR RMT) - - - 17,536.09 0.23 4,001.00 1,308.00 0.28 363.00 360.00 0.26 93.00 (2.00) 1.84 4.1% 14.9%

TOTAL 458,066.58 302,914.00 553,920.99 430,730.32 91,801.71 117,082.31 6,644.00 6,996.00 -554.77 636.24 2.7% 27.6% Overall

TOTAL to Safety + Sand Strom Material Maintaince Off site Area


MANHOUR BREAK UP Indirect Direct Saudization Day work Mob / Demov ID Medical Night Watch Painters Site Setup
Date Training & Rain Shortage Hrs Hrs.
ESTIMATED (Direct+Indirect) 0 - - - - - -
WEEKLY (Direct+Indirect) 0 - - - - - - - - - - - - - -
CUMULATIVE (Direct+Indirect) ###

MANPOWER / MAN-HOURS STATISTICS


Non-
Productive
Productive
Manpower Forecast MATERIAL STATISTICS
DIRECT Category Nos Total
Next week
Hrs Hrs
Mov Demov SL Component UNIT Budgeted Utilized Requested Received Variances Forecast Remarks
1 Scaffolders 119 0 1 Scaffolding Tubes LM -
2 Helpers 15 0 2 Scaffolding Boards LM -
3 Charge hand 4 0 3 Ladder Beams LM -
Total Direct 60 0 4 Cuplok Standards LM -
manpower
INDIRECT
(Nos) 5 Cuplok Ledgers LM -
1 Managers 1 0.00 6 Inter Transoms LM -
2 QS Engineer 1 0 7 Access Ladders LM -
3 Store Keeper 2 0 8 Doubles NOS -
4 Clerk 1 0 9 Singles NOS -
5 Supervisors 4 0 10 Swivels NOS -
6 Foreman 4 0 11 Graveloks NOS -
7 Driver 3 0 12 Sleeves NOS -
8 Scaffold Inspectors 1 0 13 UBJ NOS -
9 House Keeper 2 0
10 Saudis 34 0.00
11 Safety Personnel 3 0 MP LOG 1-Jan-16 2-Jan-16 3-Jan-16 4-Jan-16 5-Jan-16 6-Jan-16 7-Jan-16 TOTAL AVG / DAY Remarks
12 Foreman 4 0 DIRECT - PRESENT / DAY 115 108 98 321 46
Total Indirect 60 0 0 0 0.00 0.00 DIRECT - ABSCENTISM / DAY 2 12 4 18 3

Prepared By: Reviewed & Approved By: General Note & Comments: ###

###

###

Signature: Signature:
Contract Number : 7734
Clinet Name : SK WASIT

SCAFFOLDING PROGRESS SHEET


Make sure no duplicates/ Req Dayworks should match with -ve good ; +ve low
quantity should match INVOICE invoices dayworks performance

Suspended (M2) Tower (M3) Additional platform (M2) Dayworks Actual MHRS Spended Estimated Final Mhrs Status
Invoice Invoice
Dismantled Ereceted Dismantled Dismantled Total Hours No of Direct Total Manhours Total Earned Mhrs
Date Requisition Elevevation Ereceted Quantity Ereceted Quantity Daywork Total Earned Mhrs
quantity Quantity quantity quantity (A) Men Present Spended (B) ©
Number Number

8-Nov-14 125 0-10 45 45 10 25 DN-85 10 110 87 -2

22-Nov-14 125 0-10 45 45 10 66 DN-105 10 110 42.95 1.05

9-Nov-14 225 0-10 88 10 110 117.04 -7.04

10-Nov-14 225 0-10 45 5 55 59.85 -4.85

10-Nov-14 226 0-10 45 5 55 59.85 -4.85


PROJECT : HADEED
JOB :
F

8516 1 2 3
SR. PF EMPLOYEE Direct / Indirect Category JOB F
NO. NO. NAME as per the Admin CODE 1 2 3

1 7733 14 14 -

2 7734 11 11 8

3 7734 14 14 8

4 7734 11 11 -

5 7734 12 12 8

6 7734 12 11 8

7 7734 11 11 -

8 7734 - - -

9 7734 13 10 9

10 7734 11 11 -

11 7734 - - -

12 7734 12 12 8

13 7734 12 11 8

14 7734 13 13 8

15 7734 12 11 -

16 7734 12 11 8

17 7734 12 11 8

18 7734 11 12 8

19 7734 11 12 8

20 7734 11 11 -

21 7734 11 11 -

22 7734 11 11 8

23 7734 A 11 -

24 7734 - - -

Prepared By :Manoj kumar Page 3 of 8 Approved By : Shijil.VP


PROJECT : HADEED
JOB :
F

8516 1 2 3
SR. PF EMPLOYEE Direct / Indirect Category JOB F
NO. NO. NAME as per the Admin CODE 1 2 3

25
TOTAL 237 242 105

Prepared By :Manoj kumar Page 4 of 8 Approved By : Shijil.VP


DAILY
PROJECT ATTENDANCE
: HADEED SHEET
JOB :
For the Month of October 2014

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
F F F
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

- - - - - - - - - - - - - - - - - - - - - - - -

- - 9 9 9 11 8 11 11 11 11 11 10 8 11 11 11 11 11 11 - - - -

- - 9 9 9 13 8 12 13 SL 11 11 12 8 - - 12 13 12 11 - - - -

- - 9 9 - 13 8 11 13 A 11 A 11 - - - - A A 11 - - - -

- - 9 9 9 12 8 12 11 12 11 12 11 8 12 11 12 11 12 11 - - - -

- - 9 9 9 12 8 12 12 11 11 12 11 8 11 11 12 11 12 11 - - - -

- - 9 9 9 11 8 11 12 11 11 11 A - 11 11 8 11 11 11 - - - -

- - - - - - 8 11 12 12 11 11 11 8 11 11 12 12 11 11 - - - -

- - 10 10 10 14 9 13 13 13 13 13 12 8 13 13 13 13 13 13 - - - -

- - - - 8 11 - 11 11 11 11 10 10 - 10 10 10 10 10 10 - - - -

- - - - - - - - - - - - 13 - - - - - - - - - - -

- - 9 - 9 12 8 12 13 12 11 12 11 8 - - - 11 11 11 - - - -

- - 9 9 9 Vacation - - - - - - - - - - - - - - - - - -

- - 10 10 10 13 8 13 13 13 12 12 11 8 13 12 13 13 13 12 - - - -

- - - - 9 11 - 11 13 11 11 A 11 - 11 11 12 12 12 11 - - - -

- - 9 9 9 12 8 11 13 11 11 12 11 8 13 11 13 12 13 11 - - - -

- - - - 9 12 8 11 13 11 11 12 11 8 13 11 13 12 13 SL - - - -

- - 9 9 9 11 8 12 12 11 11 12 11 8 12 A 11 11 11 12 - - - -

- - 9 9 9 11 8 12 12 11 11 12 11 8 12 A 11 11 11 12 - - - -

- - 8 - 8 11 - 11 11 11 11 10 10 - 10 10 10 10 10 10 - - - -

- - 8 - 8 11 - 11 11 11 11 10 10 - 10 10 10 10 10 10 - - - -

- - 9 9 9 12 8 12 12 11 11 11 11 8 11 A A 11 11 11 - - - -

- - - 9 - 11 8 12 A 11 A A 11 - 11 12 A 11 A 11 - - - -

- - - - - - - - 12 - - - - - - - - - - - - - - -

Prepared By :Manoj kumar Page 5 of 8 Approved By : Shijil.VP


DAILY
PROJECT ATTENDANCE
: HADEED SHEET
JOB :
For the Month of October 2014

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
F F F
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

0 0 144 128 161 224 129 232 243 205 212 194 220 104 195 155 183 216 207 211 0 0 0 0

Prepared By :Manoj kumar Page 6 of 8 Approved By : Shijil.VP


PROJECT : HADEED
JOB :

28 29 30 31
TOTAL
28 29 30 30 HRS.

- - - - 28.0

- - - - 215.0

- - - - 199.0

- - - - 118.0

- - - - 225.0

- - - - 223.0

- - - - 187.0

- - - - 152.0

- - - - 248.0

- - - - 165.0

- - - - 13.0

- - - - 182.0

- - - - 58.0

- - - - 243.0

- - - - 169.0

- - - - 228.0

- - - - 199.0

- - - - 211.0

- - - - 211.0

- - - - 173.0

- - - - 173.0

- - - - 197.0

- - - - 118.0

- - - - 12.0

Prepared By :Manoj kumar Page 7 of 8 Approved By : Shijil.VP


PROJECT : HADEED
JOB :

28 29 30 31
TOTAL
28 29 30 30 HRS.
0.0
0 0 0 0 3947.0

Prepared By :Manoj kumar Page 8 of 8 Approved By : Shijil.VP