National foreword
This British Standard is the UK implementation of ISO 55001:2014. It
is based on PAS 55-1:2008, which will be withdrawn on 15 January
2015.
The UK participation in its preparation was entrusted to Technical
Committee SSM/1/-/2, Asset management.
A list of organizations represented on this committee can be
obtained on request to its secretary.
This publication does not purport to include all the necessary
provisions of a contract. Users are responsible for its correct
application.
© The British Standards Institution 2014.
Published by BSI Standards Limited 2014
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

ISBN 978 0 580 75128 8


ICS 03.100.01
Compliance with a British Standard cannot confer immunity from
legal obligations.
This British Standard was published under the authority of the
Standards Policy and Strategy Committee on 31 January 2014.
Amendments/corrigenda issued since publication
Date Text affected
BS ISO 55001:2014
INTERNATIONAL ISO
STANDARD 55001

First edition
2014-01-15

Asset management — Management


Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

systems — Requirements
Gestion d’actifs — Systèmes de management — Exigences

Reference number
ISO 55001:2014(E)

© ISO 2014
BS ISO 55001:2014
ISO 55001:2014(E)
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

COPYRIGHT PROTECTED DOCUMENT


© ISO 2014
ŽŽ”‹‰Š–•”‡•‡”˜‡†ǤŽ‡••‘–Š‡”™‹•‡•’‡…‹ϐ‹‡†ǡ‘’ƒ”–‘ˆ–Š‹•’—„Ž‹…ƒ–‹‘ƒ›„‡”‡’”‘†—…‡†‘”—–‹Ž‹œ‡†‘–Š‡”™‹•‡‹ƒ›ˆ‘”
‘” „› ƒ› ‡ƒ•ǡ ‡Ž‡…–”‘‹… ‘” ‡…Šƒ‹…ƒŽǡ ‹…Ž—†‹‰ ’Š‘–‘…‘’›‹‰ǡ ‘” ’‘•–‹‰ ‘ –Š‡ ‹–‡”‡– ‘” ƒ ‹–”ƒ‡–ǡ ™‹–Š‘—– ’”‹‘”
™”‹––‡’‡”‹••‹‘Ǥ‡”‹••‹‘…ƒ„‡”‡“—‡•–‡†ˆ”‘‡‹–Š‡” ƒ––Š‡ƒ††”‡••„‡Ž‘™‘” ǯ•‡„‡”„‘†›‹–Š‡…‘—–”›‘ˆ
–Š‡”‡“—‡•–‡”Ǥ
…‘’›”‹‰Š–‘ˆϐ‹…‡
ƒ•‡’‘•–ƒŽ‡ͷ͸Ȉ Ǧͳʹͳͳ
‡‡˜ƒʹͲ
Tel. + 41 22 749 01 11
ƒšΪͶͳʹʹ͹ͶͻͲͻͶ͹
Ǧƒ‹Ž…‘’›”‹‰Š–̷‹•‘Ǥ‘”‰
Web www.iso.org
—„Ž‹•Š‡†‹™‹–œ‡”Žƒ†

ii © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

Contents ƒ‰‡

Foreword ........................................................................................................................................................................................................................................ iv
Introduction..................................................................................................................................................................................................................................v
1 Scope ................................................................................................................................................................................................................................. 1
2 Normative reference ......................................................................................................................................................................................... 1
͵ Terms and deϐinitions ..................................................................................................................................................................................... 1
4 Context of the organization ....................................................................................................................................................................... 1
ͶǤͳ †‡”•–ƒ†‹‰–Š‡‘”‰ƒ‹œƒ–‹‘ƒ†‹–•…‘–‡š– ....................................................................................................... 1
ͶǤʹ †‡”•–ƒ†‹‰–Š‡‡‡†•ƒ†‡š’‡…–ƒ–‹‘•‘ˆ•–ƒ‡Š‘Ž†‡”• .......................................................................... 1
ͶǤ͵ ‡–‡”‹‹‰–Š‡•…‘’‡‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡.................................................................................. 2
ͶǤͶ ••‡–ƒƒ‰‡‡–•›•–‡ ........................................................................................................................................................... 2
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

5 Leadership .................................................................................................................................................................................................................. 2
ͷǤͳ ‡ƒ†‡”•Š‹’ƒ†…‘‹–‡– ..................................................................................................................................................... 2
ͷǤʹ ‘Ž‹…› ............................................................................................................................................................................................................... 3
ͷǤ͵ ”‰ƒ‹œƒ–‹‘ƒŽ”‘Ž‡•ǡ”‡•’‘•‹„‹Ž‹–‹‡•ƒ†ƒ—–Š‘”‹–‹‡•.......................................................................................... 3
6 Planning......................................................................................................................................................................................................................... 3
͸Ǥͳ …–‹‘•–‘ƒ††”‡••”‹••ƒ†‘’’‘”–—‹–‹‡•ˆ‘”–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ ............................. 3
͸Ǥʹ ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ƒ†’Žƒ‹‰–‘ƒ…Š‹‡˜‡–Š‡ ........................................................................ 4
7 Support ........................................................................................................................................................................................................................... 5
7.1 Resources..................................................................................................................................................................................................... 5
7.2 Competence ............................................................................................................................................................................................... 5
͹Ǥ͵ ™ƒ”‡‡•• ................................................................................................................................................................................................... ͸
͹ǤͶ ‘—‹…ƒ–‹‘ ...................................................................................................................................................................................... ͸
͹Ǥͷ ˆ‘”ƒ–‹‘”‡“—‹”‡‡–• ............................................................................................................................................................ ͸
͹Ǥ͸ ‘…—‡–‡†‹ˆ‘”ƒ–‹‘............................................................................................................................................................... 7
8 Operation ..................................................................................................................................................................................................................... 8
ͺǤͳ ’‡”ƒ–‹‘ƒŽ’Žƒ‹‰ƒ†…‘–”‘Ž .......................................................................................................................................... 8
ͺǤʹ ƒƒ‰‡‡–‘ˆ…Šƒ‰‡ .................................................................................................................................................................... 8
8.3 Outsourcing................................................................................................................................................................................................ 8
9 Performance evaluation ............................................................................................................................................................................... 8
ͻǤͳ ‘‹–‘”‹‰ǡ‡ƒ•—”‡‡–ǡƒƒŽ›•‹•ƒ†‡˜ƒŽ—ƒ–‹‘ ............................................................................................... 8
ͻǤʹ –‡”ƒŽƒ—†‹– ............................................................................................................................................................................................ 9
ͻǤ͵ ƒƒ‰‡‡–”‡˜‹‡™ ........................................................................................................................................................................... 9
10 Improvement .........................................................................................................................................................................................................10
ͳͲǤͳ ‘…‘ˆ‘”‹–›ƒ†…‘””‡…–‹˜‡ƒ…–‹‘ .............................................................................................................................. 10
ͳͲǤʹ ”‡˜‡–‹˜‡ƒ…–‹‘................................................................................................................................................................................ 10
ͳͲǤ͵ ‘–‹—ƒŽ‹’”‘˜‡‡– ............................................................................................................................................................... 11
Annex A ȋ‹ˆ‘”ƒ–‹˜‡Ȍ Information on asset management activities .............................................................................12
Bibliography ............................................................................................................................................................................................................................. 13

© ISO 2014 – All rights reserved iii


BS ISO 55001:2014
ISO 55001:2014(E)

Foreword
ȋ–Š‡ –‡”ƒ–‹‘ƒŽ”‰ƒ‹œƒ–‹‘ˆ‘”–ƒ†ƒ”†‹œƒ–‹‘Ȍ‹•ƒ™‘”Ž†™‹†‡ˆ‡†‡”ƒ–‹‘‘ˆƒ–‹‘ƒŽ•–ƒ†ƒ”†•
„‘†‹‡• ȋ  ‡„‡” „‘†‹‡•ȌǤ Š‡ ™‘” ‘ˆ ’”‡’ƒ”‹‰ –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”†• ‹• ‘”ƒŽŽ› …ƒ””‹‡† ‘—–
–Š”‘—‰Š  –‡…Š‹…ƒŽ …‘‹––‡‡•Ǥ ƒ…Š ‡„‡” „‘†› ‹–‡”‡•–‡† ‹ ƒ •—„Œ‡…– ˆ‘” ™Š‹…Š ƒ –‡…Š‹…ƒŽ
…‘‹––‡‡ Šƒ• „‡‡ ‡•–ƒ„Ž‹•Š‡† Šƒ• –Š‡ ”‹‰Š– –‘ „‡ ”‡’”‡•‡–‡† ‘ –Šƒ– …‘‹––‡‡Ǥ –‡”ƒ–‹‘ƒŽ
‘”‰ƒ‹œƒ–‹‘•ǡ ‰‘˜‡”‡–ƒŽ ƒ† ‘Ǧ‰‘˜‡”‡–ƒŽǡ ‹ Ž‹ƒ‹•‘ ™‹–Š ǡ ƒŽ•‘ –ƒ‡ ’ƒ”– ‹ –Š‡ ™‘”Ǥ
 …‘ŽŽƒ„‘”ƒ–‡• …Ž‘•‡Ž› ™‹–Š –Š‡ –‡”ƒ–‹‘ƒŽ Ž‡…–”‘–‡…Š‹…ƒŽ ‘‹••‹‘ ȋ Ȍ ‘ ƒŽŽ ƒ––‡”• ‘ˆ
‡Ž‡…–”‘–‡…Š‹…ƒŽ•–ƒ†ƒ”†‹œƒ–‹‘Ǥ
Š‡ ’”‘…‡†—”‡• —•‡† –‘ †‡˜‡Ž‘’ –Š‹• †‘…—‡– ƒ† –Š‘•‡ ‹–‡†‡† ˆ‘” ‹–• ˆ—”–Š‡” ƒ‹–‡ƒ…‡ ƒ”‡
†‡•…”‹„‡†‹–Š‡ Ȁ ‹”‡…–‹˜‡•ǡƒ”–ͳǤ ’ƒ”–‹…—Žƒ”–Š‡†‹ˆˆ‡”‡–ƒ’’”‘˜ƒŽ…”‹–‡”‹ƒ‡‡†‡†ˆ‘”–Š‡
†‹ˆˆ‡”‡––›’‡•‘ˆ †‘…—‡–••Š‘—Ž†„‡‘–‡†ǤŠ‹•†‘…—‡–™ƒ•†”ƒˆ–‡†‹ƒ……‘”†ƒ…‡™‹–Š–Š‡
‡†‹–‘”‹ƒŽ”—Ž‡•‘ˆ–Š‡ Ȁ ‹”‡…–‹˜‡•ǡƒ”–ʹȋ•‡‡™™™Ǥ‹•‘Ǥ‘”‰Ȁ†‹”‡…–‹˜‡•ȌǤ
––‡–‹‘‹•†”ƒ™–‘–Š‡’‘••‹„‹Ž‹–›–Šƒ–•‘‡‘ˆ–Š‡‡Ž‡‡–•‘ˆ–Š‹•†‘…—‡–ƒ›„‡–Š‡•—„Œ‡…–‘ˆ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

’ƒ–‡–”‹‰Š–•Ǥ •ŠƒŽŽ‘–„‡Š‡Ž†”‡•’‘•‹„Ž‡ˆ‘”‹†‡–‹ˆ›‹‰ƒ›‘”ƒŽŽ•—…Š’ƒ–‡–”‹‰Š–•Ǥ‡–ƒ‹Ž•‘ˆ
ƒ›’ƒ–‡–”‹‰Š–•‹†‡–‹ϐ‹‡††—”‹‰–Š‡†‡˜‡Ž‘’‡–‘ˆ–Š‡†‘…—‡–™‹ŽŽ„‡‹–Š‡ –”‘†—…–‹‘ƒ†Ȁ‘”
‘–Š‡ Ž‹•–‘ˆ’ƒ–‡–†‡…Žƒ”ƒ–‹‘•”‡…‡‹˜‡†ȋ•‡‡™™™Ǥ‹•‘Ǥ‘”‰Ȁ’ƒ–‡–•ȌǤ
›–”ƒ†‡ƒ‡—•‡†‹–Š‹•†‘…—‡–‹•‹ˆ‘”ƒ–‹‘‰‹˜‡ˆ‘”–Š‡…‘˜‡‹‡…‡‘ˆ—•‡”•ƒ††‘‡•‘–
…‘•–‹–—–‡ƒ‡†‘”•‡‡–Ǥ
‘” ƒ ‡š’Žƒƒ–‹‘ ‘ –Š‡ ‡ƒ‹‰ ‘ˆ  •’‡…‹ϐ‹… –‡”• ƒ† ‡š’”‡••‹‘• ”‡Žƒ–‡† –‘ …‘ˆ‘”‹–›
ƒ••‡••‡–ǡƒ•™‡ŽŽƒ•‹ˆ‘”ƒ–‹‘ƒ„‘—– ǯ•ƒ†Š‡”‡…‡–‘–Š‡’”‹…‹’Ž‡•‹–Š‡‡…Š‹…ƒŽƒ””‹‡”•
–‘”ƒ†‡ȋȌ•‡‡–Š‡ˆ‘ŽŽ‘™‹‰ǣ ‘”‡™‘”†Ǧ—’’Ž‡‡–ƒ”›‹ˆ‘”ƒ–‹‘
Š‡…‘‹––‡‡”‡•’‘•‹„Ž‡ˆ‘”–Š‹•†‘…—‡–‹•”‘Œ‡…–‘‹––‡‡ ȀʹͷͳǡAsset management.

iv © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

Introduction
Š‹• –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”† •’‡…‹ϐ‹‡• –Š‡ ”‡“—‹”‡‡–• ˆ‘” –Š‡ ‡•–ƒ„Ž‹•Š‡–ǡ ‹’Ž‡‡–ƒ–‹‘ǡ
ƒ‹–‡ƒ…‡ƒ†‹’”‘˜‡‡–‘ˆƒƒƒ‰‡‡–•›•–‡ˆ‘”ƒ••‡–ƒƒ‰‡‡–ǡ”‡ˆ‡””‡†–‘ƒ•ƒDzƒ••‡–
ƒƒ‰‡‡–•›•–‡dzǤ
Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†…ƒ„‡—•‡†„›ƒ›‘”‰ƒ‹œƒ–‹‘ǤŠ‡‘”‰ƒ‹œƒ–‹‘†‡–‡”‹‡•–‘™Š‹…Š‘ˆ
‹–•ƒ••‡–•–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†ƒ’’Ž‹‡•Ǥ
Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†‹•’”‹ƒ”‹Ž›‹–‡†‡†ˆ‘”—•‡„›ǣ
Ȅ –Š‘•‡ ‹˜‘Ž˜‡† ‹ –Š‡ ‡•–ƒ„Ž‹•Š‡–ǡ ‹’Ž‡‡–ƒ–‹‘ǡ ƒ‹–‡ƒ…‡ ƒ† ‹’”‘˜‡‡– ‘ˆ ƒ ƒ••‡–
ƒƒ‰‡‡–•›•–‡Ǣ
Ȅ –Š‘•‡‹˜‘Ž˜‡†‹†‡Ž‹˜‡”‹‰ƒ••‡–ƒƒ‰‡‡–ƒ…–‹˜‹–‹‡•ƒ†•‡”˜‹…‡’”‘˜‹†‡”•Ǣ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Ȅ ‹–‡”ƒŽ ƒ† ‡š–‡”ƒŽ ’ƒ”–‹‡• –‘ ƒ••‡•• –Š‡ ‘”‰ƒ‹œƒ–‹‘ǯ• ƒ„‹Ž‹–› –‘ ‡‡– Ž‡‰ƒŽǡ ”‡‰—Žƒ–‘”› ƒ†
…‘–”ƒ…–—ƒŽ”‡“—‹”‡‡–•ƒ†–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•‘™”‡“—‹”‡‡–•Ǥ
Š‡ ‘”†‡” ‹ ™Š‹…Š ”‡“—‹”‡‡–• ƒ”‡ ’”‡•‡–‡† ‹ –Š‹• –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”† †‘‡• ‘– ”‡ϐŽ‡…– –Š‡‹”
‹’‘”–ƒ…‡‘”‹’Ž›–Š‡‘”†‡”‹™Š‹…Š–Š‡›ƒ”‡–‘„‡‹’Ž‡‡–‡†Ǥ
—”–Š‡”‰—‹†ƒ…‡”‡‰ƒ”†‹‰–Š‡ƒ’’Ž‹…ƒ–‹‘‘ˆ–Š‡”‡“—‹”‡‡–•™‹–Š‹–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†‹•
provided in ISO 55002.

‡‡”ƒŽ ‹ˆ‘”ƒ–‹‘ ‘ ƒ••‡– ƒƒ‰‡‡–ǡ ƒ† ‹ˆ‘”ƒ–‹‘ ‘ –Š‡ –‡”‹‘Ž‘‰› ƒ’’Ž‹…ƒ„Ž‡ –‘ –Š‹•
–‡”ƒ–‹‘ƒŽ –ƒ†ƒ”†ǡ ‹• ’”‘˜‹†‡† ‹  ͷͷͲͲͲ. ”‰ƒ‹œƒ–‹‘• …ƒ ϐ‹† –Šƒ– …‘•‹†‡”ƒ–‹‘ ‘ˆ –Š‡
’”‹…‹’Ž‡•™‹ŽŽƒ••‹•––Š‡†‡˜‡Ž‘’‡–‘ˆƒ••‡–ƒƒ‰‡‡–‹–Š‡‹”‘”‰ƒ‹œƒ–‹‘Ǥ
Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†ƒ’’Ž‹‡•–Š‡†‡ϐ‹‹–‹‘‘ˆDz”‹•dz‰‹˜‡‹ ͵ͳͲͲͲǣʹͲͲͻƒ† 
—‹†‡͹͵ǣʹͲͲͻǤ
ƒ††‹–‹‘ǡ‹–—•‡•–Š‡–‡”Dz•–ƒ‡Š‘Ž†‡”dz”ƒ–Š‡”–ŠƒDz‹–‡”‡•–‡†’ƒ”–›dzǤ
Š‹• –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”† ‹• †‡•‹‰‡† –‘ ‡ƒ„Ž‡ ƒ ‘”‰ƒ‹œƒ–‹‘ –‘ ƒŽ‹‰ ƒ† ‹–‡‰”ƒ–‡ ‹–• ƒ••‡–
ƒƒ‰‡‡–•›•–‡™‹–Š”‡Žƒ–‡†ƒƒ‰‡‡–•›•–‡”‡“—‹”‡‡–•Ǥ
‡š’”‘˜‹†‡•ƒ††‹–‹‘ƒŽ‹ˆ‘”ƒ–‹‘‘ƒ”‡ƒ•”‡Žƒ–‡†–‘ƒ••‡–ƒƒ‰‡‡–ƒ…–‹˜‹–‹‡•Ǥ

© ISO 2014 – All rights reserved v


Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI
BS ISO 55001:2014
BS ISO 55001:2014

INTERNATIONAL STANDARD ISO 55001:2014(E)

Asset management — Management systems —


Requirements

1 Scope
Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†•’‡…‹ϐ‹‡•”‡“—‹”‡‡–•ˆ‘”ƒƒ••‡–ƒƒ‰‡‡–•›•–‡™‹–Š‹–Š‡…‘–‡š–
‘ˆ–Š‡‘”‰ƒ‹œƒ–‹‘Ǥ
Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†…ƒ„‡ƒ’’Ž‹‡†–‘ƒŽŽ–›’‡•‘ˆƒ••‡–•ƒ†„›ƒŽŽ–›’‡•ƒ†•‹œ‡•‘ˆ‘”‰ƒ‹œƒ–‹‘•Ǥ
ͳ Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†‹•‹–‡†‡†–‘„‡—•‡†ˆ‘”ƒƒ‰‹‰’Š›•‹…ƒŽƒ••‡–•‹’ƒ”–‹…—Žƒ”ǡ„—–‹–
…ƒƒŽ•‘„‡ƒ’’Ž‹‡†–‘‘–Š‡”ƒ••‡––›’‡•Ǥ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

ʹ Š‹• –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”† †‘‡• ‘– •’‡…‹ˆ› ϐ‹ƒ…‹ƒŽǡ ƒ……‘—–‹‰ ‘” –‡…Š‹…ƒŽ ”‡“—‹”‡‡–• ˆ‘”
ƒƒ‰‹‰•’‡…‹ϐ‹…ƒ••‡––›’‡•Ǥ

͵ ‘”–Š‡’—”’‘•‡•‘ˆ ͷͷͲͲͲǡ ͷͷͲͲʹƒ†–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†ǡ–Š‡–‡”Dzƒ••‡–ƒƒ‰‡‡–


•›•–‡dz‹•—•‡†–‘”‡ˆ‡”–‘ƒƒƒ‰‡‡–•›•–‡ˆ‘”ƒ••‡–ƒƒ‰‡‡–Ǥ

2 Normative reference
Š‡ ˆ‘ŽŽ‘™‹‰ †‘…—‡–•ǡ ‹ ™Š‘Ž‡ ‘” ‹ ’ƒ”–ǡ ƒ”‡ ‘”ƒ–‹˜‡Ž› ”‡ˆ‡”‡…‡† ‹ –Š‹• †‘…—‡– ƒ† ƒ”‡
‹†‹•’‡•ƒ„Ž‡ ˆ‘” ‹–• ƒ’’Ž‹…ƒ–‹‘Ǥ ‘” †ƒ–‡† ”‡ˆ‡”‡…‡•ǡ ‘Ž› –Š‡ ‡†‹–‹‘ …‹–‡† ƒ’’Ž‹‡•Ǥ ‘” —†ƒ–‡†
”‡ˆ‡”‡…‡•ǡ–Š‡Žƒ–‡•–‡†‹–‹‘‘ˆ–Š‡”‡ˆ‡”‡…‡††‘…—‡–ȋ‹…Ž—†‹‰ƒ›ƒ‡†‡–•Ȍƒ’’Ž‹‡•Ǥ
ͷͷͲͲͲǣʹͲͳͶǡAsset management — Overview, principles and terminology

3 Terms and deϐinitions


‘”–Š‡’—”’‘•‡•‘ˆ–Š‹•†‘…—‡–ǡ–Š‡–‡”•ƒ††‡ϐ‹‹–‹‘•‰‹˜‡‹ ͷͷͲͲͲƒ’’Ž›Ǥ

4 Context of the organization

4.1 Understanding the organization and its context


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡‡š–‡”ƒŽƒ†‹–‡”ƒŽ‹••—‡•–Šƒ–ƒ”‡”‡Ž‡˜ƒ––‘‹–•’—”’‘•‡ƒ†–Šƒ–
ƒˆˆ‡…–‹–•ƒ„‹Ž‹–›–‘ƒ…Š‹‡˜‡–Š‡‹–‡†‡†‘—–…‘‡ȋ•Ȍ‘ˆ‹–•ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ǡ‹…Ž—†‡†‹–Š‡•–”ƒ–‡‰‹…ƒ••‡–ƒƒ‰‡‡–’ŽƒȋȌǡ•ŠƒŽŽ„‡ƒŽ‹‰‡†
–‘ǡƒ†…‘•‹•–‡–™‹–Šǡ–Š‡‘”‰ƒ‹œƒ–‹‘ƒŽ‘„Œ‡…–‹˜‡•Ǥ

4.2 Understanding the needs and expectations of stakeholders


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡ǣ
Ȅ –Š‡•–ƒ‡Š‘Ž†‡”•–Šƒ–ƒ”‡”‡Ž‡˜ƒ––‘–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǣ
Ȅ –Š‡”‡“—‹”‡‡–•ƒ†‡š’‡…–ƒ–‹‘•‘ˆ–Š‡•‡•–ƒ‡Š‘Ž†‡”•™‹–Š”‡•’‡…––‘ƒ••‡–ƒƒ‰‡‡–Ǣ
Ȅ –Š‡…”‹–‡”‹ƒˆ‘”ƒ••‡–ƒƒ‰‡‡–†‡…‹•‹‘ƒ‹‰Ǣ
Ȅ –Š‡ •–ƒ‡Š‘Ž†‡” ”‡“—‹”‡‡–• ˆ‘” ”‡…‘”†‹‰ ϐ‹ƒ…‹ƒŽ ƒ† ‘Ǧϐ‹ƒ…‹ƒŽ ‹ˆ‘”ƒ–‹‘ ”‡Ž‡˜ƒ– –‘
ƒ••‡–ƒƒ‰‡‡–ǡƒ†ˆ‘””‡’‘”–‹‰‘‹–„‘–Š‹–‡”ƒŽŽ›ƒ†‡š–‡”ƒŽŽ›Ǥ

© ISO 2014 – All rights reserved 1


BS ISO 55001:2014
ISO 55001:2014(E)

4.3 Determining the scope of the asset management system


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡–Š‡„‘—†ƒ”‹‡•ƒ†ƒ’’Ž‹…ƒ„‹Ž‹–›‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡–‘
‡•–ƒ„Ž‹•Š‹–••…‘’‡ǤŠ‡•…‘’‡•ŠƒŽŽ„‡ƒŽ‹‰‡†™‹–Š–Š‡ƒ†–Š‡ƒ••‡–ƒƒ‰‡‡–’‘Ž‹…›ǤŠ‡
†‡–‡”‹‹‰–Š‹••…‘’‡ǡ–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ…‘•‹†‡”ǣ
Ȅ –Š‡‡š–‡”ƒŽƒ†‹–‡”ƒŽ‹••—‡•”‡ˆ‡””‡†–‘‹4.1Ǣ
Ȅ –Š‡”‡“—‹”‡‡–•”‡ˆ‡””‡†–‘‹4.2Ǣ
Ȅ –Š‡‹–‡”ƒ…–‹‘™‹–Š‘–Š‡”ƒƒ‰‡‡–•›•–‡•ǡ‹ˆ—•‡†Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡ϐ‹‡–Š‡ƒ••‡–’‘”–ˆ‘Ž‹‘…‘˜‡”‡†„›–Š‡•…‘’‡‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Š‡•…‘’‡•ŠƒŽŽ„‡ƒ˜ƒ‹Žƒ„Ž‡ƒ•†‘…—‡–‡†‹ˆ‘”ƒ–‹‘Ǥ

4.4 Asset management system


Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•–ƒ„Ž‹•Šǡ‹’Ž‡‡–ǡƒ‹–ƒ‹ƒ†…‘–‹—ƒŽŽ›‹’”‘˜‡ƒƒ••‡–ƒƒ‰‡‡–
•›•–‡ǡ‹…Ž—†‹‰–Š‡’”‘…‡••‡•‡‡†‡†ƒ†–Š‡‹”‹–‡”ƒ…–‹‘•ǡ‹ƒ……‘”†ƒ…‡™‹–Š–Š‡”‡“—‹”‡‡–•‘ˆ
–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡˜‡Ž‘’ƒ™Š‹…Š‹…Ž—†‡•†‘…—‡–ƒ–‹‘‘ˆ–Š‡”‘Ž‡‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–
•›•–‡‹•—’’‘”–‹‰ƒ…Š‹‡˜‡‡–‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•Ǥ

5 Leadership

5.1 Leadership and commitment


‘’ƒƒ‰‡‡–•ŠƒŽŽ†‡‘•–”ƒ–‡Ž‡ƒ†‡”•Š‹’ƒ†…‘‹–‡–™‹–Š”‡•’‡…––‘–Š‡ƒ••‡–ƒƒ‰‡‡–
•›•–‡„›ǣ
Ȅ ‡•—”‹‰ –Šƒ– –Š‡ ƒ••‡– ƒƒ‰‡‡– ’‘Ž‹…›ǡ –Š‡  ƒ† ƒ••‡– ƒƒ‰‡‡– ‘„Œ‡…–‹˜‡• ƒ”‡
‡•–ƒ„Ž‹•Š‡†ƒ†ƒ”‡…‘’ƒ–‹„Ž‡™‹–Š–Š‡‘”‰ƒ‹œƒ–‹‘ƒŽ‘„Œ‡…–‹˜‡•Ǣ
Ȅ ‡•—”‹‰ –Š‡ ‹–‡‰”ƒ–‹‘ ‘ˆ –Š‡ ƒ••‡– ƒƒ‰‡‡– •›•–‡ ”‡“—‹”‡‡–• ‹–‘ –Š‡ ‘”‰ƒ‹œƒ–‹‘ǯ•
„—•‹‡••’”‘…‡••‡•Ǣ
Ȅ ‡•—”‹‰–Šƒ––Š‡”‡•‘—”…‡•ˆ‘”–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ƒ”‡ƒ˜ƒ‹Žƒ„Ž‡Ǣ
Ȅ …‘—‹…ƒ–‹‰ –Š‡ ‹’‘”–ƒ…‡ ‘ˆ ‡ˆˆ‡…–‹˜‡ ƒ••‡– ƒƒ‰‡‡– ƒ† ‘ˆ …‘ˆ‘”‹‰ –‘ –Š‡ ƒ••‡–
ƒƒ‰‡‡–•›•–‡”‡“—‹”‡‡–•Ǣ
Ȅ ‡•—”‹‰–Šƒ––Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ƒ…Š‹‡˜‡•‹–•‹–‡†‡†‘—–…‘‡ȋ•ȌǢ
Ȅ †‹”‡…–‹‰ƒ†•—’’‘”–‹‰’‡”•‘•–‘…‘–”‹„—–‡–‘–Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǣ
Ȅ ’”‘‘–‹‰…”‘••Ǧˆ—…–‹‘ƒŽ…‘ŽŽƒ„‘”ƒ–‹‘™‹–Š‹–Š‡‘”‰ƒ‹œƒ–‹‘Ǣ
Ȅ ’”‘‘–‹‰…‘–‹—ƒŽ‹’”‘˜‡‡–Ǣ
Ȅ •—’’‘”–‹‰‘–Š‡””‡Ž‡˜ƒ–ƒƒ‰‡‡–”‘Ž‡•–‘†‡‘•–”ƒ–‡–Š‡‹”Ž‡ƒ†‡”•Š‹’ƒ•‹–ƒ’’Ž‹‡•–‘–Š‡‹”
ƒ”‡ƒ•‘ˆ”‡•’‘•‹„‹Ž‹–›Ǣ
Ȅ ‡•—”‹‰ –Šƒ– –Š‡ ƒ’’”‘ƒ…Š —•‡† ˆ‘” ƒƒ‰‹‰ ”‹• ‹ ƒ••‡– ƒƒ‰‡‡– ‹• ƒŽ‹‰‡† ™‹–Š –Š‡
‘”‰ƒ‹œƒ–‹‘ǯ•ƒ’’”‘ƒ…Šˆ‘”ƒƒ‰‹‰”‹•Ǥ
 ‡ˆ‡”‡…‡ –‘ Dz„—•‹‡••dz ‹ –Š‹• –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”† …ƒ „‡ ‹–‡”’”‡–‡† „”‘ƒ†Ž› –‘ ‡ƒ –Š‘•‡
ƒ…–‹˜‹–‹‡•–Šƒ–ƒ”‡…‘”‡–‘–Š‡’—”’‘•‡•‘ˆ–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•‡š‹•–‡…‡Ǥ

2 © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

5.2 Policy
‘’ƒƒ‰‡‡–•ŠƒŽŽ‡•–ƒ„Ž‹•Šƒƒ••‡–ƒƒ‰‡‡–’‘Ž‹…›–Šƒ–ǣ
ƒȌ ‹•ƒ’’”‘’”‹ƒ–‡–‘–Š‡’—”’‘•‡‘ˆ–Š‡‘”‰ƒ‹œƒ–‹‘Ǣ
„Ȍ ’”‘˜‹†‡•ƒˆ”ƒ‡™‘”ˆ‘”•‡––‹‰ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•Ǣ
…Ȍ ‹…Ž—†‡•ƒ…‘‹–‡––‘•ƒ–‹•ˆ›ƒ’’Ž‹…ƒ„Ž‡”‡“—‹”‡‡–•Ǣ
†Ȍ ‹…Ž—†‡•ƒ…‘‹–‡––‘…‘–‹—ƒŽ‹’”‘˜‡‡–‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Š‡ƒ••‡–ƒƒ‰‡‡–’‘Ž‹…›•ŠƒŽŽǣ
Ȅ „‡…‘•‹•–‡–™‹–Š–Š‡‘”‰ƒ‹œƒ–‹‘ƒŽ’ŽƒǢ
Ȅ „‡…‘•‹•–‡–™‹–Š‘–Š‡””‡Ž‡˜ƒ–‘”‰ƒ‹œƒ–‹‘ƒŽ’‘Ž‹…‹‡•Ǣ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Ȅ „‡ƒ’’”‘’”‹ƒ–‡–‘–Š‡ƒ–—”‡ƒ†•…ƒŽ‡‘ˆ–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•ƒ••‡–•ƒ†‘’‡”ƒ–‹‘•Ǣ
Ȅ „‡ƒ˜ƒ‹Žƒ„Ž‡ƒ•†‘…—‡–‡†‹ˆ‘”ƒ–‹‘Ǣ
Ȅ „‡…‘—‹…ƒ–‡†™‹–Š‹–Š‡‘”‰ƒ‹œƒ–‹‘Ǣ
Ȅ „‡ƒ˜ƒ‹Žƒ„Ž‡–‘•–ƒ‡Š‘Ž†‡”•ǡƒ•ƒ’’”‘’”‹ƒ–‡Ǣ
Ȅ „‡‹’Ž‡‡–‡†ƒ†„‡’‡”‹‘†‹…ƒŽŽ›”‡˜‹‡™‡†ƒ†ǡ‹ˆ”‡“—‹”‡†ǡ—’†ƒ–‡†Ǥ

5.3 Organizational roles, responsibilities and authorities


‘’ƒƒ‰‡‡–•ŠƒŽŽ‡•—”‡–Šƒ––Š‡”‡•’‘•‹„‹Ž‹–‹‡•ƒ†ƒ—–Š‘”‹–‹‡•ˆ‘””‡Ž‡˜ƒ–”‘Ž‡•ƒ”‡ƒ••‹‰‡†
ƒ†…‘—‹…ƒ–‡†™‹–Š‹–Š‡‘”‰ƒ‹œƒ–‹‘Ǥ
‘’ƒƒ‰‡‡–•ŠƒŽŽƒ••‹‰–Š‡”‡•’‘•‹„‹Ž‹–›ƒ†ƒ—–Š‘”‹–›ˆ‘”ǣ
ƒȌ ‡•–ƒ„Ž‹•Š‹‰ƒ†—’†ƒ–‹‰–Š‡ǡ‹…Ž—†‹‰ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•Ǣ
„Ȍ ‡•—”‹‰–Šƒ––Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡•—’’‘”–•†‡Ž‹˜‡”›‘ˆ–Š‡Ǣ
…Ȍ ‡•—”‹‰ –Šƒ– –Š‡ ƒ••‡– ƒƒ‰‡‡– •›•–‡ …‘ˆ‘”• –‘ –Š‡ ”‡“—‹”‡‡–• ‘ˆ –Š‹• –‡”ƒ–‹‘ƒŽ
–ƒ†ƒ”†Ǣ
†Ȍ ‡•—”‹‰–Š‡•—‹–ƒ„‹Ž‹–›ǡƒ†‡“—ƒ…›ƒ†‡ˆˆ‡…–‹˜‡‡••‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǣ
‡Ȍ ‡•–ƒ„Ž‹•Š‹‰ƒ†—’†ƒ–‹‰–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•Ȍȋ•‡‡͸ǤʹǤʹȌǢ
ˆȌ ”‡’‘”–‹‰‘–Š‡’‡”ˆ‘”ƒ…‡‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡–‘–‘’ƒƒ‰‡‡–Ǥ

6 Planning

6.1 Actions to address risks and opportunities for the asset management system
Š‡’Žƒ‹‰ˆ‘”–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ǡ–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ…‘•‹†‡”–Š‡‹••—‡•”‡ˆ‡””‡†–‘
in 4.1ƒ†–Š‡”‡“—‹”‡‡–•”‡ˆ‡””‡†–‘‹4.2ƒ††‡–‡”‹‡–Š‡”‹••ƒ†‘’’‘”–—‹–‹‡•–Šƒ–‡‡†–‘„‡
ƒ††”‡••‡†–‘ǣ
Ȅ ‰‹˜‡ƒ••—”ƒ…‡–Šƒ––Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡…ƒƒ…Š‹‡˜‡‹–•‹–‡†‡†‘—–…‘‡ȋ•ȌǢ
Ȅ ’”‡˜‡–ǡ‘””‡†—…‡—†‡•‹”‡†‡ˆˆ‡…–•Ǣ
Ȅ ƒ…Š‹‡˜‡…‘–‹—ƒŽ‹’”‘˜‡‡–Ǥ

© ISO 2014 – All rights reserved 3


BS ISO 55001:2014
ISO 55001:2014(E)

Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ’Žƒǣ
ƒȌ ƒ…–‹‘• –‘ ƒ††”‡•• –Š‡•‡ ”‹•• ƒ† ‘’’‘”–—‹–‹‡•ǡ –ƒ‹‰ ‹–‘ ƒ……‘—– Š‘™ –Š‡•‡ ”‹•• ƒ†
‘’’‘”–—‹–‹‡•…ƒ…Šƒ‰‡™‹–Š–‹‡Ǣ
b) how to:
Ȅ ‹–‡‰”ƒ–‡ƒ†‹’Ž‡‡––Š‡ƒ…–‹‘•‹–‘‹–•ƒ••‡–ƒƒ‰‡‡–•›•–‡’”‘…‡••‡•Ǣ
Ȅ ‡˜ƒŽ—ƒ–‡–Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆ–Š‡•‡ƒ…–‹‘•Ǥ

6.2 Asset management objectives and planning to achieve them

6.2.1 Asset management objectives

Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•–ƒ„Ž‹•Šƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ƒ–”‡Ž‡˜ƒ–ˆ—…–‹‘•ƒ†Ž‡˜‡Ž•Ǥ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Š‡‡•–ƒ„Ž‹•Š‹‰‹–•ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ǡ–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ…‘•‹†‡”–Š‡”‡“—‹”‡‡–•‘ˆ
”‡Ž‡˜ƒ–•–ƒ‡Š‘Ž†‡”•ƒ†‘ˆ‘–Š‡”ϐ‹ƒ…‹ƒŽǡ–‡…Š‹…ƒŽǡŽ‡‰ƒŽǡ”‡‰—Žƒ–‘”›ƒ†‘”‰ƒ‹œƒ–‹‘ƒŽ”‡“—‹”‡‡–•
‹–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒ‹‰’”‘…‡••Ǥ
Š‡ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡••ŠƒŽŽǣ
Ȅ „‡…‘•‹•–‡–ƒ†ƒŽ‹‰‡†™‹–Š–Š‡‘”‰ƒ‹œƒ–‹‘ƒŽ‘„Œ‡…–‹˜‡•Ǣ
Ȅ „‡…‘•‹•–‡–™‹–Š–Š‡ƒ••‡–ƒƒ‰‡‡–’‘Ž‹…›Ǣ
Ȅ „‡‡•–ƒ„Ž‹•Š‡†ƒ†—’†ƒ–‡†—•‹‰ƒ••‡–ƒƒ‰‡‡–†‡…‹•‹‘Ǧƒ‹‰…”‹–‡”‹ƒȋ•‡‡4.2ȌǢ
Ȅ „‡‡•–ƒ„Ž‹•Š‡†ƒ†—’†ƒ–‡†ƒ•’ƒ”–‘ˆ–Š‡Ǣ
Ȅ „‡‡ƒ•—”ƒ„Ž‡ȋ‹ˆ’”ƒ…–‹…ƒ„Ž‡ȌǢ
Ȅ –ƒ‡‹–‘ƒ……‘—–ƒ’’Ž‹…ƒ„Ž‡”‡“—‹”‡‡–•Ǣ
Ȅ „‡‘‹–‘”‡†Ǣ
Ȅ „‡…‘—‹…ƒ–‡†–‘”‡Ž‡˜ƒ–•–ƒ‡Š‘Ž†‡”•Ǣ
Ȅ „‡”‡˜‹‡™‡†ƒ†—’†ƒ–‡†ƒ•ƒ’’”‘’”‹ƒ–‡Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ”‡–ƒ‹†‘…—‡–‡†‹ˆ‘”ƒ–‹‘‘–Š‡ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•Ǥ

6.2.2 Planning to achieve asset management objectives

Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ ‹–‡‰”ƒ–‡ –Š‡ ’Žƒ‹‰ –‘ ƒ…Š‹‡˜‡ ƒ••‡– ƒƒ‰‡‡– ‘„Œ‡…–‹˜‡• ™‹–Š ‘–Š‡”
‘”‰ƒ‹œƒ–‹‘ƒŽ’Žƒ‹‰ƒ…–‹˜‹–‹‡•ǡ‹…Ž—†‹‰ϐ‹ƒ…‹ƒŽǡŠ—ƒ”‡•‘—”…‡•ƒ†‘–Š‡”•—’’‘”–ˆ—…–‹‘•Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•–ƒ„Ž‹•Šǡ†‘…—‡–ƒ†ƒ‹–ƒ‹ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•Ȍ–‘ƒ…Š‹‡˜‡–Š‡ƒ••‡–
ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ǤŠ‡•‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•Ȍ•ŠƒŽŽ„‡ƒŽ‹‰‡†™‹–Š–Š‡ƒ••‡–ƒƒ‰‡‡–
’‘Ž‹…›ƒ†–Š‡Ǥ
Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ ‡•—”‡ –Šƒ– –Š‡ ƒ••‡– ƒƒ‰‡‡– ’Žƒȋ•Ȍ –ƒ‡ȋ•Ȍ ‹–‘ ƒ……‘—– ”‡Ž‡˜ƒ–
”‡“—‹”‡‡–•…‘‹‰ˆ”‘‘—–•‹†‡–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Š‡’Žƒ‹‰Š‘™–‘ƒ…Š‹‡˜‡‹–•ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ǡ–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡ƒ†
document:
ƒȌ –Š‡ ‡–Š‘† ƒ† …”‹–‡”‹ƒ ˆ‘” †‡…‹•‹‘ ƒ‹‰ ƒ† ’”‹‘”‹–‹œ‹‰ ‘ˆ –Š‡ ƒ…–‹˜‹–‹‡• ƒ† ”‡•‘—”…‡• –‘
ƒ…Š‹‡˜‡‹–•ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•Ȍƒ†ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•Ǣ
„Ȍ –Š‡’”‘…‡••‡•ƒ†‡–Š‘†•–‘„‡‡’Ž‘›‡†‹ƒƒ‰‹‰‹–•ƒ••‡–•‘˜‡”–Š‡‹”Ž‹ˆ‡…›…Ž‡•Ǣ

4 © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

…Ȍ ™Šƒ–™‹ŽŽ„‡†‘‡Ǣ
†Ȍ ™Šƒ–”‡•‘—”…‡•™‹ŽŽ„‡”‡“—‹”‡†Ǣ
‡Ȍ ™Š‘™‹ŽŽ„‡”‡•’‘•‹„Ž‡Ǣ
ˆȌ ™Š‡‹–™‹ŽŽ„‡…‘’Ž‡–‡†Ǣ
‰Ȍ Š‘™–Š‡”‡•—Ž–•™‹ŽŽ„‡‡˜ƒŽ—ƒ–‡†Ǣ
ŠȌ –Š‡ƒ’’”‘’”‹ƒ–‡–‹‡Š‘”‹œ‘ȋ•Ȍˆ‘”–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•ȌǢ
‹Ȍ –Š‡ϐ‹ƒ…‹ƒŽƒ†‘Ǧϐ‹ƒ…‹ƒŽ‹’Ž‹…ƒ–‹‘•‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•ȌǢ
ŒȌ –Š‡”‡˜‹‡™’‡”‹‘†ˆ‘”–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•Ȍȋ•‡‡9.1ȌǢ
Ȍ ƒ…–‹‘•–‘ƒ††”‡••”‹••ƒ†‘’’‘”–—‹–‹‡•ƒ••‘…‹ƒ–‡†™‹–Šƒƒ‰‹‰–Š‡ƒ••‡–•ǡ–ƒ‹‰‹–‘ƒ……‘—–
Š‘™–Š‡•‡”‹••ƒ†‘’’‘”–—‹–‹‡•…ƒ…Šƒ‰‡™‹–Š–‹‡ǡ„›‡•–ƒ„Ž‹•Š‹‰’”‘…‡••‡•ˆ‘”ǣ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Ȅ ‹†‡–‹ϐ‹…ƒ–‹‘‘ˆ”‹••ƒ†‘’’‘”–—‹–‹‡•Ǣ
Ȅ ƒ••‡••‡–‘ˆ”‹••ƒ†‘’’‘”–—‹–‹‡•Ǣ
Ȅ †‡–‡”‹‹‰–Š‡•‹‰‹ϐ‹…ƒ…‡‘ˆƒ••‡–•‹ƒ…Š‹‡˜‹‰ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•Ǣ
Ȅ ‹’Ž‡‡–ƒ–‹‘‘ˆ–Š‡ƒ’’”‘’”‹ƒ–‡–”‡ƒ–‡–ǡƒ†‘‹–‘”‹‰ǡ‘ˆ”‹••ƒ†‘’’‘”–—‹–‹‡•Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•—”‡–Šƒ–‹–•ƒ••‡–ƒƒ‰‡‡–”‡Žƒ–‡†”‹••ƒ”‡…‘•‹†‡”‡†‹–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•
”‹•ƒƒ‰‡‡–ƒ’’”‘ƒ…Š‹…Ž—†‹‰…‘–‹‰‡…›’Žƒ‹‰Ǥ
 ‡‡ ͵ͳͲͲͲˆ‘”ˆ—”–Š‡”‰—‹†ƒ…‡‘”‹•ƒƒ‰‡‡–

7 Support

7.1 Resources
Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ †‡–‡”‹‡ ƒ† ’”‘˜‹†‡ –Š‡ ”‡•‘—”…‡• ‡‡†‡† ˆ‘” –Š‡ ‡•–ƒ„Ž‹•Š‡–ǡ
‹’Ž‡‡–ƒ–‹‘ǡƒ‹–‡ƒ…‡ƒ†…‘–‹—ƒŽ‹’”‘˜‡‡–‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ’”‘˜‹†‡–Š‡”‡•‘—”…‡•”‡“—‹”‡†ˆ‘”‡‡–‹‰–Š‡ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ƒ†
ˆ‘”‹’Ž‡‡–‹‰–Š‡ƒ…–‹˜‹–‹‡••’‡…‹ϐ‹‡†‹–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•ȌǤ

7.2 Competence
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽǣ
Ȅ †‡–‡”‹‡–Š‡‡…‡••ƒ”›…‘’‡–‡…‡‘ˆ’‡”•‘ȋ•Ȍ†‘‹‰™‘”—†‡”‹–•…‘–”‘Ž–Šƒ–ƒˆˆ‡…–•‹–•ƒ••‡–
’‡”ˆ‘”ƒ…‡ǡƒ••‡–ƒƒ‰‡‡–’‡”ˆ‘”ƒ…‡ƒ†ƒ••‡–ƒƒ‰‡‡–•›•–‡’‡”ˆ‘”ƒ…‡Ǣ
Ȅ ‡•—”‡ –Šƒ– –Š‡•‡ ’‡”•‘• ƒ”‡ …‘’‡–‡– ‘ –Š‡ „ƒ•‹• ‘ˆ ƒ’’”‘’”‹ƒ–‡ ‡†—…ƒ–‹‘ǡ –”ƒ‹‹‰ǡ ‘”
‡š’‡”‹‡…‡Ǣ
Ȅ ™Š‡”‡ƒ’’Ž‹…ƒ„Ž‡ǡ–ƒ‡ƒ…–‹‘•–‘ƒ…“—‹”‡–Š‡‡…‡••ƒ”›…‘’‡–‡…‡ǡƒ†‡˜ƒŽ—ƒ–‡–Š‡‡ˆˆ‡…–‹˜‡‡••
‘ˆ–Š‡ƒ…–‹‘•–ƒ‡Ǣ
Ȅ ”‡–ƒ‹ƒ’’”‘’”‹ƒ–‡†‘…—‡–‡†‹ˆ‘”ƒ–‹‘ƒ•‡˜‹†‡…‡‘ˆ…‘’‡–‡…‡Ǣ
Ȅ ’‡”‹‘†‹…ƒŽŽ›”‡˜‹‡™…—””‡–ƒ†ˆ—–—”‡…‘’‡–‡…›‡‡†•ƒ†”‡“—‹”‡‡–•Ǥ
 ’’Ž‹…ƒ„Ž‡ƒ…–‹‘•…ƒ‹…Ž—†‡ǡˆ‘”‡šƒ’Ž‡ǣ–Š‡’”‘˜‹•‹‘‘ˆ–”ƒ‹‹‰–‘ǡ–Š‡‡–‘”‹‰‘ˆǡ‘”–Š‡”‡Ǧ
ƒ••‹‰‡–‘ˆ…—””‡–Ž›‡’Ž‘›‡†’‡”•‘•Ǣ‘”–Š‡Š‹”‹‰‘”…‘–”ƒ…–‹‰‘ˆ…‘’‡–‡–’‡”•‘•Ǥ

© ISO 2014 – All rights reserved 5


BS ISO 55001:2014
ISO 55001:2014(E)

7.3 Awareness
‡”•‘•†‘‹‰™‘”—†‡”–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•…‘–”‘Žǡ™Š‘…ƒŠƒ˜‡ƒ‹’ƒ…–‘–Š‡ƒ…Š‹‡˜‡‡–‘ˆ–Š‡
ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ǡ•ŠƒŽŽ„‡ƒ™ƒ”‡‘ˆǣ
Ȅ –Š‡ƒ••‡–ƒƒ‰‡‡–’‘Ž‹…›Ǣ
Ȅ –Š‡‹”…‘–”‹„—–‹‘–‘–Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ǡ‹…Ž—†‹‰–Š‡„‡‡ϐ‹–•‘ˆ
‹’”‘˜‡†ƒ••‡–ƒƒ‰‡‡–’‡”ˆ‘”ƒ…‡Ǣ
Ȅ –Š‡‹”™‘”ƒ…–‹˜‹–‹‡•ǡ–Š‡ƒ••‘…‹ƒ–‡†”‹••ƒ†‘’’‘”–—‹–‹‡•ƒ†Š‘™–Š‡›”‡Žƒ–‡–‘‡ƒ…Š‘–Š‡”Ǣ
Ȅ –Š‡‹’Ž‹…ƒ–‹‘•‘ˆ‘–…‘ˆ‘”‹‰–‘–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡”‡“—‹”‡‡–•Ǥ

7.4 Communication
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡–Š‡‡‡†ˆ‘”‹–‡”ƒŽƒ†‡š–‡”ƒŽ…‘—‹…ƒ–‹‘•”‡Ž‡˜ƒ––‘ƒ••‡–•ǡ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

ƒ••‡–ƒƒ‰‡‡–ƒ†–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡‹…Ž—†‹‰ǣ
Ȅ ‘™Šƒ–‹–™‹ŽŽ…‘—‹…ƒ–‡Ǣ
Ȅ ™Š‡–‘…‘—‹…ƒ–‡Ǣ
Ȅ ™‹–Š™Š‘–‘…‘—‹…ƒ–‡Ǣ
Ȅ Š‘™–‘…‘—‹…ƒ–‡Ǥ

7.5 Information requirements


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡‹–•‹ˆ‘”ƒ–‹‘”‡“—‹”‡‡–•–‘•—’’‘”–‹–•ƒ••‡–•ǡƒ••‡–ƒƒ‰‡‡–ǡ
ƒ••‡–ƒƒ‰‡‡–•›•–‡ƒ†–Š‡ƒ…Š‹‡˜‡‡–‘ˆ‹–•‘”‰ƒ‹œƒ–‹‘ƒŽ‘„Œ‡…–‹˜‡•Ǥ †‘‹‰–Š‹•ǣ
ƒȌ –Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‹…Ž—†‡…‘•‹†‡”ƒ–‹‘‘ˆǣ
Ȅ –Š‡•‹‰‹ϐ‹…ƒ…‡‘ˆ–Š‡‹†‡–‹ϐ‹‡†”‹••Ǣ
Ȅ –Š‡”‘Ž‡•ƒ†”‡•’‘•‹„‹Ž‹–‹‡•ˆ‘”ƒ••‡–ƒƒ‰‡‡–Ǣ
Ȅ –Š‡ƒ••‡–ƒƒ‰‡‡–’”‘…‡••‡•ǡ’”‘…‡†—”‡•ƒ†ƒ…–‹˜‹–‹‡•Ǣ
Ȅ –Š‡‡š…Šƒ‰‡‘ˆ‹ˆ‘”ƒ–‹‘™‹–Š‹–••–ƒ‡Š‘Ž†‡”•ǡ‹…Ž—†‹‰•‡”˜‹…‡’”‘˜‹†‡”•Ǣ
Ȅ –Š‡‹’ƒ…–‘ˆ“—ƒŽ‹–›ǡƒ˜ƒ‹Žƒ„‹Ž‹–›ƒ†ƒƒ‰‡‡–‘ˆ‹ˆ‘”ƒ–‹‘‘‘”‰ƒ‹œƒ–‹‘ƒŽ†‡…‹•‹‘
ƒ‹‰Ǣ
„Ȍ –Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡ǣ
Ȅ –Š‡ƒ––”‹„—–‡”‡“—‹”‡‡–•‘ˆ‹†‡–‹ϐ‹‡†‹ˆ‘”ƒ–‹‘Ǣ
Ȅ –Š‡“—ƒŽ‹–›”‡“—‹”‡‡–•‘ˆ‹†‡–‹ϐ‹‡†‹ˆ‘”ƒ–‹‘Ǣ
Ȅ Š‘™ƒ†™Š‡‹ˆ‘”ƒ–‹‘‹•–‘„‡…‘ŽŽ‡…–‡†ǡƒƒŽ›•‡†ƒ†‡˜ƒŽ—ƒ–‡†Ǣ
…Ȍ –Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ•’‡…‹ˆ›ǡ‹’Ž‡‡–ƒ†ƒ‹–ƒ‹’”‘…‡••‡•ˆ‘”ƒƒ‰‹‰‹–•‹ˆ‘”ƒ–‹‘Ǣ
†Ȍ –Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ †‡–‡”‹‡ –Š‡ ”‡“—‹”‡‡–• ˆ‘” ƒŽ‹‰‡– ‘ˆ ϐ‹ƒ…‹ƒŽ ƒ† ‘Ǧϐ‹ƒ…‹ƒŽ
–‡”‹‘Ž‘‰›”‡Ž‡˜ƒ––‘ƒ••‡–ƒƒ‰‡‡––Š”‘—‰Š‘—––Š‡‘”‰ƒ‹œƒ–‹‘Ǣ
‡Ȍ –Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•—”‡–Šƒ––Š‡”‡‹•…‘•‹•–‡…›ƒ†–”ƒ…‡ƒ„‹Ž‹–›„‡–™‡‡–Š‡ϐ‹ƒ…‹ƒŽƒ†
–‡…Š‹…ƒŽ†ƒ–ƒƒ†‘–Š‡””‡Ž‡˜ƒ–‘Ǧϐ‹ƒ…‹ƒŽ†ƒ–ƒǡ–‘–Š‡‡š–‡–”‡“—‹”‡†–‘‡‡–‹–•Ž‡‰ƒŽƒ†
”‡‰—Žƒ–‘”› ”‡“—‹”‡‡–• ™Š‹Ž‡ …‘•‹†‡”‹‰ ‹–• •–ƒ‡Š‘Ž†‡”•ǯ ”‡“—‹”‡‡–• ƒ† ‘”‰ƒ‹œƒ–‹‘ƒŽ
‘„Œ‡…–‹˜‡•Ǥ

6 © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

7.6 Documented information

7.6.1 General

Š‡‘”‰ƒ‹œƒ–‹‘ǯ•ƒ••‡–ƒƒ‰‡‡–•›•–‡•ŠƒŽŽ‹…Ž—†‡ǣ
Ȅ †‘…—‡–‡†‹ˆ‘”ƒ–‹‘ƒ•”‡“—‹”‡†„›–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†Ǣ
Ȅ †‘…—‡–‡†‹ˆ‘”ƒ–‹‘ˆ‘”ƒ’’Ž‹…ƒ„Ž‡Ž‡‰ƒŽƒ†”‡‰—Žƒ–‘”›”‡“—‹”‡‡–•Ǣ
Ȅ †‘…—‡–‡†‹ˆ‘”ƒ–‹‘†‡–‡”‹‡†„›–Š‡‘”‰ƒ‹œƒ–‹‘ƒ•„‡‹‰‡…‡••ƒ”›ˆ‘”–Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆ
–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ǡƒ••’‡…‹ϐ‹‡†‹7.5.
 Š‡ ‡š–‡– ‘ˆ –Š‡ †‘…—‡–‡† ‹ˆ‘”ƒ–‹‘ ˆ‘” ƒ ƒ••‡– ƒƒ‰‡‡– •›•–‡ …ƒ †‹ˆˆ‡” ˆ”‘ ‘‡
‘”‰ƒ‹œƒ–‹‘–‘ƒ‘–Š‡”†—‡–‘ǣ

Ȅ –Š‡•‹œ‡‘ˆ‘”‰ƒ‹œƒ–‹‘ƒ†‹–•–›’‡‘ˆƒ…–‹˜‹–‹‡•ǡ’”‘…‡••‡•ǡ’”‘†—…–•ƒ†•‡”˜‹…‡•Ǣ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Ȅ –Š‡…‘’Ž‡š‹–›‘ˆ’”‘…‡••‡•ƒ†–Š‡‹”‹–‡”ƒ…–‹‘•Ǣ

Ȅ –Š‡…‘’‡–‡…‡‘ˆ’‡”•‘•Ǣ

Ȅ –Š‡…‘’Ž‡š‹–›‘ˆ–Š‡ƒ••‡–ȋ•ȌǤ

7.6.2 Creating and updating

Š‡…”‡ƒ–‹‰ƒ†—’†ƒ–‹‰†‘…—‡–‡†‹ˆ‘”ƒ–‹‘–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•—”‡ƒ’’”‘’”‹ƒ–‡ǣ
Ȅ ‹†‡–‹ϐ‹…ƒ–‹‘ƒ††‡•…”‹’–‹‘ȋ‡Ǥ‰Ǥƒ–‹–Ž‡ǡ†ƒ–‡ǡƒ—–Š‘”ǡ‘””‡ˆ‡”‡…‡—„‡”ȌǢ
Ȅ ˆ‘”ƒ–ȋ‡Ǥ‰ǤŽƒ‰—ƒ‰‡ǡ•‘ˆ–™ƒ”‡˜‡”•‹‘ǡ‰”ƒ’Š‹…•Ȍƒ†‡†‹ƒȋ‡Ǥ‰Ǥ’ƒ’‡”ǡ‡Ž‡…–”‘‹…ȌǢ
Ȅ ”‡˜‹‡™ƒ†ƒ’’”‘˜ƒŽˆ‘”•—‹–ƒ„‹Ž‹–›ƒ†ƒ†‡“—ƒ…›Ǥ

7.6.3 Control of documented information

‘…—‡–‡†‹ˆ‘”ƒ–‹‘”‡“—‹”‡†„›–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ƒ†„›–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†
•ŠƒŽŽ„‡…‘–”‘ŽŽ‡†–‘‡•—”‡ǣ
ƒȌ ‹–‹•ƒ˜ƒ‹Žƒ„Ž‡ƒ†•—‹–ƒ„Ž‡ˆ‘”—•‡ǡ™Š‡”‡ƒ†™Š‡‹–‹•‡‡†‡†Ǣ
„Ȍ ‹–‹•ƒ†‡“—ƒ–‡Ž›’”‘–‡…–‡†ȋ‡Ǥ‰Ǥˆ”‘Ž‘••‘ˆ…‘ϐ‹†‡–‹ƒŽ‹–›ǡ‹’”‘’‡”—•‡ǡ‘”Ž‘••‘ˆ‹–‡‰”‹–›ȌǤ
‘”–Š‡…‘–”‘Ž‘ˆ†‘…—‡–‡†‹ˆ‘”ƒ–‹‘ǡ–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽƒ††”‡••–Š‡ˆ‘ŽŽ‘™‹‰ƒ…–‹˜‹–‹‡•ǡƒ•
ƒ’’Ž‹…ƒ„Ž‡ǣ
Ȅ †‹•–”‹„—–‹‘ǡƒ……‡••ǡ”‡–”‹‡˜ƒŽƒ†—•‡Ǣ
Ȅ •–‘”ƒ‰‡ƒ†’”‡•‡”˜ƒ–‹‘ǡ‹…Ž—†‹‰’”‡•‡”˜ƒ–‹‘‘ˆŽ‡‰‹„‹Ž‹–›Ǣ
Ȅ …‘–”‘Ž‘ˆ…Šƒ‰‡•ȋ‡Ǥ‰Ǥ˜‡”•‹‘…‘–”‘ŽȌǢ
Ȅ ”‡–‡–‹‘ƒ††‹•’‘•‹–‹‘Ǥ
‘…—‡–‡† ‹ˆ‘”ƒ–‹‘ ‘ˆ ‡š–‡”ƒŽ ‘”‹‰‹ †‡–‡”‹‡† „› –Š‡ ‘”‰ƒ‹œƒ–‹‘ –‘ „‡ ‡…‡••ƒ”› ˆ‘”
–Š‡ ’Žƒ‹‰ ƒ† ‘’‡”ƒ–‹‘ ‘ˆ –Š‡ ƒ••‡– ƒƒ‰‡‡– •›•–‡ •ŠƒŽŽ „‡ ‹†‡–‹ϐ‹‡†ǡ ƒ• ƒ’’”‘’”‹ƒ–‡ǡ ƒ†
controlled.
 ……‡••‹’Ž‹‡•ƒ†‡…‹•‹‘”‡‰ƒ”†‹‰–Š‡’‡”‹••‹‘–‘˜‹‡™–Š‡†‘…—‡–‡†‹ˆ‘”ƒ–‹‘‘Ž›ǡ‘”–Š‡
’‡”‹••‹‘ƒ†ƒ—–Š‘”‹–›–‘˜‹‡™ƒ†…Šƒ‰‡–Š‡†‘…—‡–‡†‹ˆ‘”ƒ–‹‘ǡ‡–…Ǥ

© ISO 2014 – All rights reserved 7


BS ISO 55001:2014
ISO 55001:2014(E)

8 Operation

8.1 Operational planning and control


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ’Žƒǡ‹’Ž‡‡–ƒ†…‘–”‘Ž–Š‡’”‘…‡••‡•‡‡†‡†–‘‡‡–”‡“—‹”‡‡–•ǡƒ†
–‘‹’Ž‡‡––Š‡ƒ…–‹‘•†‡–‡”‹‡†‹͸Ǥͳǡ–Š‡ƒ••‡–ƒƒ‰‡‡–’Žƒȋ•Ȍ†‡–‡”‹‡†‹͸Ǥʹǡƒ†–Š‡
…‘””‡…–‹˜‡ƒ†’”‡˜‡–‹˜‡ƒ…–‹‘•†‡–‡”‹‡†‹10.1ƒ†10.2„›ǣ
Ȅ ‡•–ƒ„Ž‹•Š‹‰…”‹–‡”‹ƒˆ‘”–Š‡”‡“—‹”‡†’”‘…‡••‡•Ǣ
Ȅ ‹’Ž‡‡–‹‰–Š‡…‘–”‘Ž‘ˆ–Š‡’”‘…‡••‡•‹ƒ……‘”†ƒ…‡™‹–Š–Š‡…”‹–‡”‹ƒǢ
Ȅ ‡‡’‹‰†‘…—‡–‡†‹ˆ‘”ƒ–‹‘–‘–Š‡‡š–‡–‡…‡••ƒ”›–‘Šƒ˜‡…‘ϐ‹†‡…‡ƒ†‡˜‹†‡…‡–Šƒ––Š‡
’”‘…‡••‡•Šƒ˜‡„‡‡…ƒ””‹‡†‘—–ƒ•’Žƒ‡†Ǣ
Ȅ –”‡ƒ–‹‰ƒ†‘‹–‘”‹‰”‹••—•‹‰–Š‡ƒ’’”‘ƒ…Š†‡•…”‹„‡†‹͸ǤʹǤʹ.
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

8.2 Management of change


‹••ƒ••‘…‹ƒ–‡†™‹–Šƒ›’Žƒ‡†…Šƒ‰‡ǡ’‡”ƒ‡–‘”–‡’‘”ƒ”›–Šƒ–…ƒŠƒ˜‡ƒ‹’ƒ…–‘ƒ…Š‹‡˜‹‰
–Š‡ƒ••‡–ƒƒ‰‡‡–‘„Œ‡…–‹˜‡•ǡ•ŠƒŽŽ„‡ƒ••‡••‡†„‡ˆ‘”‡–Š‡…Šƒ‰‡‹•‹’Ž‡‡–‡†Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•—”‡–Šƒ–•—…Š”‹••ƒ”‡ƒƒ‰‡†‹ƒ……‘”†ƒ…‡™‹–Š͸Ǥͳƒ†͸ǤʹǤʹ.
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ…‘–”‘Ž’Žƒ‡†…Šƒ‰‡•ƒ†”‡˜‹‡™–Š‡—‹–‡†‡†…‘•‡“—‡…‡•‘ˆ…Šƒ‰‡•ǡ
–ƒ‹‰ƒ…–‹‘–‘‹–‹‰ƒ–‡ƒ›ƒ†˜‡”•‡‡ˆˆ‡…–•ǡƒ•‡…‡••ƒ”›Ǥ

8.3 Outsourcing
Š‡ –Š‡ ‘”‰ƒ‹œƒ–‹‘ ‘—–•‘—”…‡• ƒ› ƒ…–‹˜‹–‹‡• –Šƒ– …ƒ Šƒ˜‡ ƒ ‹’ƒ…– ‘ –Š‡ ƒ…Š‹‡˜‡‡– ‘ˆ ‹–•
ƒ••‡– ƒƒ‰‡‡– ‘„Œ‡…–‹˜‡•ǡ ‹– •ŠƒŽŽ ƒ••‡•• –Š‡ ƒ••‘…‹ƒ–‡† ”‹••Ǥ Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ ‡•—”‡ –Šƒ–
‘—–•‘—”…‡†’”‘…‡••‡•ƒ†ƒ…–‹˜‹–‹‡•ƒ”‡…‘–”‘ŽŽ‡†Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡ƒ††‘…—‡–Š‘™–Š‡•‡ƒ…–‹˜‹–‹‡•™‹ŽŽ„‡…‘–”‘ŽŽ‡†ƒ†‹–‡‰”ƒ–‡†
‹–‘–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•ƒ••‡–ƒƒ‰‡‡–•›•–‡ǤŠ‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡ǣ
ƒȌ –Š‡’”‘…‡••‡•ƒ†ƒ…–‹˜‹–‹‡•–Šƒ–ƒ”‡–‘„‡‘—–•‘—”…‡†ȋ‹…Ž—†‹‰–Š‡•…‘’‡ƒ†„‘—†ƒ”‹‡•‘ˆ–Š‡
‘—–•‘—”…‡†’”‘…‡••‡•ƒ†ƒ…–‹˜‹–‹‡•ƒ†–Š‡‹”‹–‡”ˆƒ…‡•™‹–Š–Š‡‘”‰ƒ‹œƒ–‹‘ǯ•‘™’”‘…‡••‡•ƒ†
ƒ…–‹˜‹–‹‡•ȌǢ
„Ȍ –Š‡”‡•’‘•‹„‹Ž‹–‹‡•ƒ†ƒ—–Š‘”‹–‹‡•™‹–Š‹–Š‡‘”‰ƒ‹œƒ–‹‘ˆ‘”ƒƒ‰‹‰–Š‡‘—–•‘—”…‡†’”‘…‡••‡•
ƒ†ƒ…–‹˜‹–‹‡•Ǣ
…Ȍ –Š‡’”‘…‡••‡•ƒ†•…‘’‡ˆ‘”–Š‡•Šƒ”‹‰‘ˆ‘™Ž‡†‰‡ƒ†‹ˆ‘”ƒ–‹‘„‡–™‡‡–Š‡‘”‰ƒ‹œƒ–‹‘
ƒ†‹–•…‘–”ƒ…–‡†•‡”˜‹…‡’”‘˜‹†‡”ȋ•ȌǢ
Š‡‘—–•‘—”…‹‰ƒ›ƒ…–‹˜‹–‹‡•ǡ–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•—”‡–Šƒ–ǣ
Ȅ –Š‡‘—–•‘—”…‡†”‡•‘—”…‡•‡‡––Š‡”‡“—‹”‡‡–•‘ˆ7.2ǡ7.3ƒ†͹Ǥ͸Ǣ
Ȅ –Š‡’‡”ˆ‘”ƒ…‡‘ˆ–Š‡‘—–•‘—”…‡†ƒ…–‹˜‹–‹‡•‹•‘‹–‘”‡†‹ƒ……‘”†ƒ…‡™‹–Š9.1.

9 Performance evaluation

9.1 Monitoring, measurement, analysis and evaluation


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ†‡–‡”‹‡ǣ
ƒȌ ™Šƒ–‡‡†•–‘„‡‘‹–‘”‡†ƒ†‡ƒ•—”‡†Ǣ

8 © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

„Ȍ –Š‡‡–Š‘†•ˆ‘”‘‹–‘”‹‰ǡ‡ƒ•—”‡‡–ǡƒƒŽ›•‹•ƒ†‡˜ƒŽ—ƒ–‹‘ǡƒ•ƒ’’Ž‹…ƒ„Ž‡ǡ–‘‡•—”‡˜ƒŽ‹†
”‡•—Ž–•Ǣ
…Ȍ ™Š‡–Š‡‘‹–‘”‹‰ƒ†‡ƒ•—”‹‰•ŠƒŽŽ„‡’‡”ˆ‘”‡†Ǣ
†Ȍ ™Š‡–Š‡”‡•—Ž–•ˆ”‘‘‹–‘”‹‰ƒ†‡ƒ•—”‡‡–•ŠƒŽŽ„‡ƒƒŽ›•‡†ƒ†‡˜ƒŽ—ƒ–‡†Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡˜ƒŽ—ƒ–‡ƒ†”‡’‘”–‘
Ȅ –Š‡ƒ••‡–’‡”ˆ‘”ƒ…‡Ǣ
Ȅ –Š‡ƒ••‡–ƒƒ‰‡‡–’‡”ˆ‘”ƒ…‡ǡ‹…Ž—†‹‰ϐ‹ƒ…‹ƒŽƒ†‘Ǧϐ‹ƒ…‹ƒŽ’‡”ˆ‘”ƒ…‡Ǣ
Ȅ –Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆ–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡˜ƒŽ—ƒ–‡ƒ†”‡’‘”–‘–Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆ–Š‡’”‘…‡••‡•ˆ‘”ƒƒ‰‹‰”‹••ƒ†
opportunities.
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ ”‡–ƒ‹ ƒ’’”‘’”‹ƒ–‡ †‘…—‡–‡† ‹ˆ‘”ƒ–‹‘ ƒ• ‡˜‹†‡…‡ ‘ˆ –Š‡ ”‡•—Ž–• ‘ˆ
‘‹–‘”‹‰ǡ‡ƒ•—”‡‡–ǡƒƒŽ›•‹•ƒ†‡˜ƒŽ—ƒ–‹‘Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•—”‡–Šƒ–‹–•‘‹–‘”‹‰ƒ†‡ƒ•—”‡‡–‡ƒ„Ž‡•‹––‘‡‡––Š‡”‡“—‹”‡‡–•
of 4.2.

9.2 Internal audit

9.2.1 Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ …‘†—…– ‹–‡”ƒŽ ƒ—†‹–• ƒ– ’Žƒ‡† ‹–‡”˜ƒŽ• –‘ ’”‘˜‹†‡ ‹ˆ‘”ƒ–‹‘ –‘
ƒ••‹•–‹–Š‡†‡–‡”‹ƒ–‹‘‘™Š‡–Š‡”–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ǣ

ƒȌ …‘ˆ‘”•–‘ǣ
Ȅ –Š‡‘”‰ƒ‹œƒ–‹‘ǯ•‘™”‡“—‹”‡‡–•ˆ‘”‹–•ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǣ
Ȅ –Š‡”‡“—‹”‡‡–•‘ˆ–Š‹• –‡”ƒ–‹‘ƒŽ–ƒ†ƒ”†Ǣ
„Ȍ ‹•‡ˆˆ‡…–‹˜‡Ž›‹’Ž‡‡–‡†ƒ†ƒ‹–ƒ‹‡†Ǥ

9.2.2 Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽǣ

ƒȌ ’Žƒǡ‡•–ƒ„Ž‹•Šǡ‹’Ž‡‡–ƒ†ƒ‹–ƒ‹ƒƒ—†‹–’”‘‰”ƒ‡ȋ•Ȍǡ‹…Ž—†‹‰–Š‡ˆ”‡“—‡…›ǡ‡–Š‘†•ǡ
”‡•’‘•‹„‹Ž‹–‹‡•ǡ ’Žƒ‹‰ ”‡“—‹”‡‡–• ƒ† ”‡’‘”–‹‰Ǥ Š‡ ƒ—†‹– ’”‘‰”ƒ‡ȋ•Ȍ •ŠƒŽŽ –ƒ‡ ‹–‘
…‘•‹†‡”ƒ–‹‘–Š‡‹’‘”–ƒ…‡‘ˆ–Š‡’”‘…‡••‡•…‘…‡”‡†ƒ†–Š‡”‡•—Ž–•‘ˆ’”‡˜‹‘—•ƒ—†‹–•Ǣ
„Ȍ †‡ϐ‹‡–Š‡ƒ—†‹–…”‹–‡”‹ƒƒ†•…‘’‡ˆ‘”‡ƒ…Šƒ—†‹–Ǣ
…Ȍ •‡Ž‡…–ƒ—†‹–‘”•ƒ†…‘†—…–ƒ—†‹–•–‘‡•—”‡‘„Œ‡…–‹˜‹–›ƒ†–Š‡‹’ƒ”–‹ƒŽ‹–›‘ˆ–Š‡ƒ—†‹–’”‘…‡••Ǣ
†Ȍ ‡•—”‡–Šƒ––Š‡”‡•—Ž–•‘ˆ–Š‡ƒ—†‹–•ƒ”‡”‡’‘”–‡†–‘”‡Ž‡˜ƒ–ƒƒ‰‡‡–Ǣƒ†
‡Ȍ ”‡–ƒ‹ †‘…—‡–‡† ‹ˆ‘”ƒ–‹‘ ƒ• ‡˜‹†‡…‡ ‘ˆ –Š‡ ”‡•—Ž–• ‘ˆ –Š‡ ‹’Ž‡‡–ƒ–‹‘ ‘ˆ –Š‡ ƒ—†‹–
’”‘‰”ƒ‡ƒ†–Š‡ƒ—†‹–”‡•—Ž–•Ǥ

9.3 Management review


‘’ ƒƒ‰‡‡– •ŠƒŽŽ ”‡˜‹‡™ –Š‡ ‘”‰ƒ‹œƒ–‹‘ǯ• ƒ••‡– ƒƒ‰‡‡– •›•–‡ǡ ƒ– ’Žƒ‡† ‹–‡”˜ƒŽ•ǡ –‘
‡•—”‡‹–•…‘–‹—‹‰•—‹–ƒ„‹Ž‹–›ǡƒ†‡“—ƒ…›ƒ†‡ˆˆ‡…–‹˜‡‡••Ǥ
Š‡ƒƒ‰‡‡–”‡˜‹‡™•ŠƒŽŽ‹…Ž—†‡…‘•‹†‡”ƒ–‹‘‘ˆǣ
ƒȌ –Š‡•–ƒ–—•‘ˆƒ…–‹‘•ˆ”‘’”‡˜‹‘—•ƒƒ‰‡‡–”‡˜‹‡™•Ǣ
„Ȍ …Šƒ‰‡•‹‡š–‡”ƒŽƒ†‹–‡”ƒŽ‹••—‡•–Šƒ–ƒ”‡”‡Ž‡˜ƒ––‘–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǣ

© ISO 2014 – All rights reserved 9


BS ISO 55001:2014
ISO 55001:2014(E)

…Ȍ ‹ˆ‘”ƒ–‹‘‘–Š‡ƒ••‡–ƒƒ‰‡‡–’‡”ˆ‘”ƒ…‡ǡ‹…Ž—†‹‰–”‡†•‹ǣ
Ȅ ‘…‘ˆ‘”‹–‹‡•ƒ†…‘””‡…–‹˜‡ƒ…–‹‘•Ǣ
Ȅ ‘‹–‘”‹‰ƒ†‡ƒ•—”‡‡–”‡•—Ž–•Ǣ
Ȅ ƒ—†‹–”‡•—Ž–•Ǣ
†Ȍ ƒ••‡–ƒƒ‰‡‡–ƒ…–‹˜‹–›Ǣ
‡Ȍ ‘’’‘”–—‹–‹‡•ˆ‘”…‘–‹—ƒŽ‹’”‘˜‡‡–Ǣ
ˆȌ …Šƒ‰‡•‹–Š‡’”‘ϐ‹Ž‡‘ˆ”‹••ƒ†‘’’‘”–—‹–‹‡•Ǥ
Š‡ ‘—–’—–• ‘ˆ –Š‡ ƒƒ‰‡‡– ”‡˜‹‡™ •ŠƒŽŽ ‹…Ž—†‡ †‡…‹•‹‘• ”‡Žƒ–‡† –‘ …‘–‹—ƒŽ ‹’”‘˜‡‡–
‘’’‘”–—‹–‹‡•ƒ†ƒ›‡‡†ˆ‘”…Šƒ‰‡•ȋ•‡‡8.2Ȍ–‘–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ”‡–ƒ‹†‘…—‡–‡†‹ˆ‘”ƒ–‹‘ƒ•‡˜‹†‡…‡‘ˆ–Š‡”‡•—Ž–•‘ˆƒƒ‰‡‡–”‡˜‹‡™•Ǥ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

10 Improvement

10.1 Nonconformity and corrective action


Š‡ƒ‘…‘ˆ‘”‹–›‘”‹…‹†‡–‘……—”•‹‹–•ƒ••‡–•ǡƒ••‡–ƒƒ‰‡‡–‘”ƒ••‡–ƒƒ‰‡‡–•›•–‡
–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽǣ
 ƒȌ ”‡ƒ…––‘–Š‡‘…‘ˆ‘”‹–›‘”‹…‹†‡–ǡƒ†ǡƒ•ƒ’’Ž‹…ƒ„Ž‡ǣ
Ȅ –ƒ‡ƒ…–‹‘–‘…‘–”‘Žƒ†…‘””‡…–‹–Ǣ
Ȅ †‡ƒŽ™‹–Š–Š‡…‘•‡“—‡…‡•Ǣ
„Ȍ ‡˜ƒŽ—ƒ–‡–Š‡‡‡†ˆ‘”ƒ…–‹‘–‘‡Ž‹‹ƒ–‡–Š‡…ƒ—•‡•‘ˆ–Š‡‘…‘ˆ‘”‹–›‘”‹…‹†‡–ǡ‹‘”†‡”–Šƒ–
‹–†‘‡•‘–‘……—”‘””‡…—”‡Ž•‡™Š‡”‡ǡ„›ǣ
Ȅ ”‡˜‹‡™‹‰–Š‡‘…‘ˆ‘”‹–›‘”‹…‹†‡–Ǣ
Ȅ †‡–‡”‹‹‰–Š‡…ƒ—•‡•‘ˆ‘…‘ˆ‘”‹–›‘”‹…‹†‡–Ǣ
Ȅ †‡–‡”‹‹‰‹ˆ•‹‹Žƒ”‘…‘ˆ‘”‹–‹‡•‡š‹•–ǡ‘”…‘—Ž†’‘–‡–‹ƒŽŽ›‘……—”Ǣ
…Ȍ ‹’Ž‡‡–ƒ›ƒ…–‹‘‡‡†‡†Ǣ
†Ȍ ”‡˜‹‡™–Š‡‡ˆˆ‡…–‹˜‡‡••‘ˆƒ›…‘””‡…–‹˜‡ƒ…–‹‘–ƒ‡Ǣƒ†
‡Ȍ ƒ‡…Šƒ‰‡•ȋ•‡‡8.2Ȍ–‘–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡ǡ‹ˆ‡…‡••ƒ”›Ǥ
‘””‡…–‹˜‡ƒ…–‹‘••ŠƒŽŽ„‡ƒ’’”‘’”‹ƒ–‡–‘–Š‡‡ˆˆ‡…–•‘ˆ–Š‡‘…‘ˆ‘”‹–‹‡•‘”‹…‹†‡–‡…‘—–‡”‡†Ǥ
Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ”‡–ƒ‹†‘…—‡–‡†‹ˆ‘”ƒ–‹‘ƒ•‡˜‹†‡…‡‘ˆǣ
Ȅ –Š‡ƒ–—”‡‘ˆ–Š‡‘…‘ˆ‘”‹–‹‡•‘”‹…‹†‡–ƒ†ƒ›•—„•‡“—‡–ƒ…–‹‘•–ƒ‡Ǣ
Ȅ –Š‡”‡•—Ž–•‘ˆƒ›…‘””‡…–‹˜‡ƒ…–‹‘Ǥ

10.2 Preventive action


Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽ‡•–ƒ„Ž‹•Š’”‘…‡••‡•–‘’”‘ƒ…–‹˜‡Ž›‹†‡–‹ˆ›’‘–‡–‹ƒŽˆƒ‹Ž—”‡•‹ƒ••‡–’‡”ˆ‘”ƒ…‡
ƒ†‡˜ƒŽ—ƒ–‡–Š‡‡‡†ˆ‘”’”‡˜‡–‹˜‡ƒ…–‹‘Ǥ
Š‡ƒ’‘–‡–‹ƒŽˆƒ‹Ž—”‡‹•‹†‡–‹ϐ‹‡†–Š‡‘”‰ƒ‹œƒ–‹‘•ŠƒŽŽƒ’’Ž›–Š‡”‡“—‹”‡‡–•‘ˆ10.1.

10 © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

10.3 Continual improvement


Š‡ ‘”‰ƒ‹œƒ–‹‘ •ŠƒŽŽ …‘–‹—ƒŽŽ› ‹’”‘˜‡ –Š‡ •—‹–ƒ„‹Ž‹–›ǡ ƒ†‡“—ƒ…› ƒ† ‡ˆˆ‡…–‹˜‡‡•• ‘ˆ ‹–• ƒ••‡–
ƒƒ‰‡‡–ƒ†–Š‡ƒ••‡–ƒƒ‰‡‡–•›•–‡Ǥ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

© ISO 2014 – All rights reserved 11


BS ISO 55001:2014
ISO 55001:2014(E)

Annex A
ȋ‹ˆ‘”ƒ–‹˜‡Ȍ

Information on asset management activities

‡Ž‡˜ƒ– ƒ••‡– ƒƒ‰‡‡– •—„Œ‡…– ƒ”‡ƒ• ƒ††”‡••‡† „› ‘–Š‡” ’—„Ž‹•Š‡† ‹–‡”ƒ–‹‘ƒŽǡ ”‡‰‹‘ƒŽǡ ‘”
ƒ–‹‘ƒŽ•–ƒ†ƒ”†•‹…Ž—†‡ǡ„—–ƒ”‡‘–Ž‹‹–‡†–‘ǡ–Š‡ˆ‘ŽŽ‘™‹‰ǣ
Ȅ †ƒ–ƒƒƒ‰‡‡–Ǣ
Ȅ …‘†‹–‹‘‘‹–‘”‹‰Ǣ
Ȅ ”‹•ƒƒ‰‡‡–Ǣ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

Ȅ “—ƒŽ‹–›ƒƒ‰‡‡–Ǣ
Ȅ ‡˜‹”‘‡–ƒŽƒƒ‰‡‡–Ǣ
Ȅ •›•–‡•ƒ†•‘ˆ–™ƒ”‡‡‰‹‡‡”‹‰Ǣ
Ȅ Ž‹ˆ‡…›…Ž‡…‘•–‹‰Ǣ
Ȅ †‡’‡†ƒ„‹Ž‹–›ȋƒ˜ƒ‹Žƒ„‹Ž‹–›ǡ”‡Ž‹ƒ„‹Ž‹–›ǡƒ‹–ƒ‹ƒ„‹Ž‹–›ǡƒ‹–‡ƒ…‡•—’’‘”–ȌǢ
Ȅ …‘ϐ‹‰—”ƒ–‹‘ƒƒ‰‡‡–Ǣ
Ȅ –‡”‘Ǧ–‡…Š‘Ž‘‰›Ǣ
Ȅ •—•–ƒ‹ƒ„Ž‡†‡˜‡Ž‘’‡–Ǣ
Ȅ ‹•’‡…–‹‘Ǣ
Ȅ ‘Ǧ†‡•–”—…–‹˜‡–‡•–‹‰Ǣ
Ȅ ’”‡••—”‡‡“—‹’‡–Ǣ
Ȅ ϐ‹ƒ…‹ƒŽƒƒ‰‡‡–Ǣ
Ȅ ˜ƒŽ—‡ƒƒ‰‡‡–Ǣ
Ȅ •Š‘…ƒ†˜‹„”ƒ–‹‘Ǣ
Ȅ ƒ…‘—•–‹…•Ǣ
Ȅ “—ƒŽ‹ϐ‹…ƒ–‹‘ƒ†ƒ••‡••‡–‘ˆ’‡”•‘‡ŽǢ
Ȅ ’”‘Œ‡…–ƒƒ‰‡‡–Ǣ
Ȅ ’”‘’‡”–›ƒ†’”‘’‡”–›ƒƒ‰‡‡–Ǣ
Ȅ ˆƒ…‹Ž‹–‹‡•ƒƒ‰‡‡–Ǣ
Ȅ ‡“—‹’‡–ƒƒ‰‡‡–Ǣ
Ȅ …‘‹••‹‘‹‰’”‘…‡••Ǣ
Ȅ ‡‡”‰›ƒƒ‰‡‡–Ǥ
•‡”• ‘ˆ  ͷͷͲͲͲǡ  ͷͷͲͲʹ ƒ† –Š‹• –‡”ƒ–‹‘ƒŽ –ƒ†ƒ”† •Š‘—Ž† ƒŽ•‘ ”‡ˆ‡” –‘ •—…Š •–ƒ†ƒ”†•
™Š‡”‡˜‡”’‘••‹„Ž‡ǡ–‘‡•—”‡…‘•‹•–‡–†‡Ž‹˜‡”›‘ˆƒ••‡–ƒƒ‰‡‡––Š”‘—‰Š‘—––Š‡‹”‘”‰ƒ‹œƒ–‹‘Ǥ

12 © ISO 2014 – All rights reserved


BS ISO 55001:2014
ISO 55001:2014(E)

Bibliography

ȏͳȐ ͻͲͲͲǡQuality management systems — Fundamentals and vocabulary


ȏʹȐ ͻͲͲͳǡQuality management systems — Requirements
ȏ͵Ȑ ͻͲͲͶǡManaging for the sustained success of an organization — A quality management approach
ȏͶȐ ͳͶͲͲͳǡEnvironmental management systems — Requirements with guidance for use
ȏͷȐ  ͳͶʹʹͶǡ Petroleum, petrochemical and natural gas industries — Collection and exchange of
reliability and maintenance data for equipment
ȏ͸Ȑ ͳͷ͸͸͵ǦͳǡPetroleum and natural gas industries — Life cycle costing — Part 1: Methodology
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

ȏ͹Ȑ  ͳͷ͸ͺ͸Ǧʹǡ Buildings and constructed assets — Service life planning — Part 2: Service life
prediction procedures
ȏͺȐ ͳ͹͵ͷͻǡCondition monitoring and diagnostics of machines — General guidelines
ȏͻȐ ͳͻͲͳͳǡGuidelines for auditing management systems
ȏͳͲȐ  ʹͲͺͳͷǡ Petroleum, petrochemical and natural gas industries — Production assurance and
reliability management
ȏͳͳȐ ʹͳͷͲͲǡGuidance on project management
ȏͳʹȐ ʹʹ͵ͲͳǡSocietal security — Business continuity management systems — Requirements
ȏͳ͵Ȑ ͵ͳͲͲͲǣʹͲͲͻǡRisk management — Principles and guidelines
ȏͳͶȐ ͵͹ͷͲͲǡGuidance on outsourcing1)
ȏͳͷȐ  ͷͷͲͲʹǣʹͲͳͶǡ Asset management — Management systems — Guidelines on the application of
ISO 55001
ȏͳ͸Ȑ 
—‹†‡͹͵ǣʹͲͲͻǡRisk management — Vocabulary
ȏͳ͹Ȑ Ȁ ͳͷʹͺͺǡSystems and software engineering — System life cycle processes
ȏͳͺȐ Ȁ ͳͻ͹͹ͲǦͳǡInformation technology — Software asset management — Part 1: Processes and
tiered assessment of conformance
ȏͳͻȐ ͵ͳͲͳͲǡRisk management — Risk assessment techniques
ȏʹͲȐ ͸Ͳ͵ͲͲǦͳǡDependability management — Part 1: Dependability management systems
[21] International Infrastructure Management Manual, International Infrastructure Management
Manual, Version 4.0 2011,  ͲǦͶ͹͵ǦͳͲ͸ͺͷǦǡ ’”‘†—…‡† „›  ‡™ ‡ƒŽƒ† …Ǥ ƒ† –Š‡
•–‹–—–‡‘ˆ—„Ž‹…‘”•‰‹‡‡”‹‰—•–”ƒŽ‹ƒȋ Ȍ
ȏʹʹȐ  ʹͳ͵ʹǡ –ƒ†ƒ”† ”ƒ…–‹…‡ ˆ‘” ˜‡–‘”› ‡”‹ϔ‹…ƒ–‹‘ǣ Ž‡…–”‘‹… ƒ† Š›•‹…ƒŽ ˜‡–‘”› ‘ˆ
Assets
ȏʹ͵Ȑ ʹʹ͹ͻǡStandard Practice for Establishing the Guiding Principles of Property Management
ȏʹͶȐ ʹ͸ͲͺǡStandard Practice for Equipment Control Matrix (ECM)
ȏʹͷȐ  ͷͷǡ••‡–ƒƒ‰‡‡–Ȅƒ”–ͷǣ’‡…‹ϔ‹…ƒ–‹‘ˆ‘”–Š‡‘’–‹‹œ‡†ƒƒ‰‡‡–‘ˆ’Š›•‹…ƒŽ
assets

1) †‡”’”‡’ƒ”ƒ–‹‘Ǥ

© ISO 2014 – All rights reserved 13


BS ISO 55001:2014
ISO 55001:2014(E)

ȏʹ͸Ȑ   ͺͳʹͲǡ Assetmanagement — Eisen aan een veiligheids-, kwaliteits- en
capaciteitsmanagementsysteem voor het elektriciteits- en gasnetbeheer (Asset management for
electricity and gas networks)
[27] Engineering Asset Management an Insurance Perspective„› ƒƒ”ƒ”†ǡ ǣͻͺ͹Ͳͻͺʹͷͳ͸͵ͲͲǡ
‡Ž‹ƒ„‹Ž‹–›™‡„Ǥ…‘
[28] Physical Asset Management Handbook Ͷ–Š †‹–‹‘ „› ‘Š Ǥ ‹–…Š‡ŽŽǡ ǣ ͻ͹ͺͲͻͺͷ͵͸ͳͻ͵ͺǡ
Š––’ǣȀȀ‡Ž‹ƒ„‹Ž‹–›™‡„Ǥ…‘
[29] Making Common Sense Common Practice, Models for Operational Excellenceǡ Ͷ–Š †‹–‹‘ „› ‘
‘‘”‡ǡǤǤǡ ǣͻ͹ͺͲͻͺ͵ͺ͹ͶͳͺͺǡŠ––’ǣȀȀ‡Ž‹ƒ„‹Ž‹–›™‡„Ǥ…‘
[30] Maintenance Work Management Processes (Maintenance Strategy Series)„›‡””›‹”‡ƒǡ ǣ
ͻ͹ͺͲͻͺ͵ʹʹͷͺ͸͹
[31] Maintenance & Reliability Best Practices ʹ† †‹–‹‘ „› ƒ‡•Š
—Žƒ–‹ǡ —„Ž‹•Š‡”ǣ †—•–”‹ƒŽ
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

”‡••ǡ ͻ͹Ͳͺ͵ͳͳ͵Ͷ͵Ͷͳ

14 © ISO 2014 – All rights reserved


Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI
BS ISO 55001:2014
BS ISO 55001:2014
ISO 55001:2014(E)
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

ICS౧03.100.01
”‹…‡„ƒ•‡†‘ͳͶ’ƒ‰‡•

© ISO 2014 – All rights reserved


Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

This page deliberately left blank


BS ISO 55001:2014
NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW

British Standards Institution (BSI)


BSI is the national body responsible for preparing British Standards and other
standards-related publications, information and services.
BSI is incorporated by Royal Charter. British Standards and other standardization
products are published by BSI Standards Limited.

About us Revisions
We bring together business, industry, government, consumers, innovators Our British Standards and other publications are updated by amendment or revision.
Licensed copy:ASTAD PROJECT MANAGEMENT, 01/07/2018, Uncontrolled Copy, © BSI

and others to shape their combined experience and expertise into standards We continually improve the quality of our products and services to benefit your
-based solutions. business. If you find an inaccuracy or ambiguity within a British Standard or other
The knowledge embodied in our standards has been carefully assembled in BSI publication please inform the Knowledge Centre.
a dependable format and refined through our open consultation process.
Organizations of all sizes and across all sectors choose standards to help Copyright
them achieve their goals. All the data, software and documentation set out in all British Standards and
other BSI publications are the property of and copyrighted by BSI, or some person
Information on standards or entity that owns copyright in the information used (such as the international
We can provide you with the knowledge that your organization needs standardization bodies) and has formally licensed such information to BSI for
to succeed. Find out more about British Standards by visiting our website at commercial publication and use. Except as permitted under the Copyright, Designs
bsigroup.com/standards or contacting our Customer Services team or and Patents Act 1988 no extract may be reproduced, stored in a retrieval system
Knowledge Centre. or transmitted in any form or by any means – electronic, photocopying, recording
or otherwise – without prior written permission from BSI. Details and advice can
Buying standards be obtained from the Copyright & Licensing Department.
You can buy and download PDF versions of BSI publications, including British
and adopted European and international standards, through our website at Useful Contacts:
bsigroup.com/shop, where hard copies can also be purchased. Customer Services
If you need international and foreign standards from other Standards Development Tel: +44 845 086 9001
Organizations, hard copies can be ordered from our Customer Services team. Email (orders): orders@bsigroup.com
Email (enquiries): cservices@bsigroup.com
Subscriptions
Subscriptions
Our range of subscription services are designed to make using standards
Tel: +44 845 086 9001
easier for you. For further information on our subscription products go to
Email: subscriptions@bsigroup.com
bsigroup.com/subscriptions.
With British Standards Online (BSOL) you’ll have instant access to over 55,000 Knowledge Centre
British and adopted European and international standards from your desktop. Tel: +44 20 8996 7004
It’s available 24/7 and is refreshed daily so you’ll always be up to date. Email: knowledgecentre@bsigroup.com
You can keep in touch with standards developments and receive substantial
Copyright & Licensing
discounts on the purchase price of standards, both in single copy and subscription
Tel: +44 20 8996 7070
format, by becoming a BSI Subscribing Member.
Email: copyright@bsigroup.com
PLUS is an updating service exclusive to BSI Subscribing Members. You will
automatically receive the latest hard copy of your standards when they’re
revised or replaced.
To find out more about becoming a BSI Subscribing Member and the benefits
of membership, please visit bsigroup.com/shop.
With a Multi-User Network Licence (MUNL) you are able to host standards
publications on your intranet. Licences can cover as few or as many users as you
wish. With updates supplied as soon as they’re available, you can be sure your
documentation is current. For further information, email bsmusales@bsigroup.com.

BSI Group Headquarters


389 Chiswick High Road London W4 4AL UK

You might also like