Gantt Chart Ken
Gantt Chart Ken
UPAH HARIAN +
OVERHEAD
4
Rp 75,000.00
Rp 72,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 50,000.00
Rp 45,000.00
Rp 45,000.00
Rp 100,000.00
Rp 100,000.00
Rp 70,000.00
Rp 60,000.00
Rp 70,000.00
Rp 65,000.00
Rp 45,000.00
Rp 45,000.00
Rp 50,000.00
Rp 60,000.00
HARGA SATUAN
4
-
Rp 100,000.00
Rp 100,000.00
Rp 90,000.00
Rp 128,000.00
Rp 173,000.00
Rp 280,000.00
Rp 368,000.00
Rp 368,000.00
Rp 368,000.00
Rp 255,000.00
Rp 280,000.00
Rp 48,000.00
Rp 60,000.00
Rp 1,200.00
Rp 8,500.00
Rp 15,800.00
Rp 600.00
Rp 2,500.00
Rp 800.00
Rp 5,000.00
-
-
Rp 4,000.00
Rp 1,750.00
Rp 60,000.00
Rp 60,000.00
Rp 52,000.00
Rp 52,000.00
Rp 60,000.00
Rp 60,000.00
Rp 60,000.00
Rp 52,000.00
Rp 55,000.00
Rp 57,000.00
Rp 45,500.00
Rp 45,500.00
Rp 48,000.00
Rp 65,000.00
Rp 65,000.00
Rp 65,000.00
Rp 62,500.00
Rp 62,500.00
Rp 62,500.00
Rp 62,500.00
Rp 145,000.00
Rp 185,000.00
Rp 50,000.00
Rp 4,500.00
Rp 10,000.00
Rp 13,000.00
Rp 3,500,000.00
Rp 2,600,000.00
Rp 1,600,000.00
Rp 1,200,000.00
Rp 3,800,000.00
Rp 2,800,000.00
Rp 1,600,000.00
Rp 1,200,000.00
Rp 18,000.00
Rp 18,000.00
Rp 8,500.00
Rp 7,500.00
Rp 6,500.00
Rp 5,500.00
Rp 7,500.00
Rp 15,000.00
Rp 11,800.00
Rp 13,570.00
Rp 15,000.00
Rp 20,700.00
Rp 28,000.00
Rp 25,000.00
Rp 5,000.00
Rp 28,000.00
Rp 22,000.00
Rp 30,000.00
Rp 750.00
Rp 19,500.00
Rp 19,250.00
Rp 725.00
Rp 120,000.00
Rp 15,000.00
Rp 75,000.00
Rp 95,000.00
Rp 750,000.00
Rp 950,000.00
Rp 450,000.00
Rp 250,000.00
Rp 275,000.00
Rp 750,000.00
Rp 950,000.00
Rp 1,000.00
Rp 1,000.00
Rp 3,000.00
Rp 18,000.00
Rp 72,941.18
Rp 64,705.88
Rp 57,631.37
Rp 103,874.51
Rp 60,203.92
Rp 64,705.88
Rp 54,180.39
Rp 209,882.35
Rp 109,050.98
Rp 33,200.00
Rp 41,250.00
Rp 63,500.00
Rp 160,574.04
Rp 49,400.00
Rp 63,855.00
Rp 105,060.00
Rp 19,000.00
Rp 27,500.00
Rp 19,200.00
Rp 20,000.00
Rp 35,000.00
Rp 750.00
Rp 17,500.00
Rp 6,750.00
Rp 16,750.00
Rp 16,000.00
Rp 60,950.00
Rp 9,000.00
Rp 34,500.00
Rp 37,650.00
Rp 82,000.00
Rp 165,000.00
Rp 18,000.00
Rp 18,000.00
Rp 18,000.00
Rp 51,750.00
Rp 74,750.00
Rp 85,000.00
Rp 120,000.00
Rp 195,000.00
Rp 100,000.00
Rp 61,000.00
Rp 5,500.00
Rp 10,500.00
Rp 41,500.00
Rp 140,000.00
Rp 85,000.00
Rp 47,500.00
Rp 21,500.00
Rp 40,000.00
Rp 70,000.00
Rp 125,000.00
Rp 11,500.00
Rp 350,000.00
Rp 450,000.00
Rp 250,000.00
Rp 822,500.00
Rp 150,000.00
Rp 150,000.00
Rp 1,650,000.00
Rp 1,450,000.00
Rp 350,000.00
Rp 210,000.00
Rp 410,000.00
Rp 350,000.00
Rp 350,000.00
Rp 25,000.00
Rp 25,000.00
Rp 30,000.00
Rp 47,500.00
Rp 65,000.00
Rp 25,000.00
Rp 6,500.00
Rp 18,500.00
Rp 24,000.00
Rp 34,000.00
Rp 38,000.00
Rp 48,700.00
Rp 75,000.00
Rp 110,000.00
Rp 250,000.00
Rp 280,750.00
Rp 369,750.00
Rp 22,000.00
Rp 27,000.00
Rp 36,000.00
Rp 51,900.00
Rp 75,500.00
Rp 104,000.00
Rp 12,500.00
Rp 92,500.00
Rp 110,000.00
Rp 152,500.00
Rp 223,750.00
Rp 298,750.00
Rp 542,500.00
Rp 585,000.00
Rp 55,000.00
Rp 75,000.00
Rp 80,000.00
Rp 150,000.00
Rp 14,000.00
Rp 82,800.00
Rp 51,600.00
Rp 33,600.00
Rp 18,425.00
Rp 7,810.00
Rp 5,142.50
Rp 38,000.00
Rp 37,000.00
Rp 37,000.00
Rp 17,500.00
Rp 18,250.00
Rp 11,250.00
Rp 17,500.00
Rp 20,000.00
Rp 20,000.00
Rp 7,500.00
Rp 16,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 40,000.00
Rp 28,000.00
Rp 28,000.00
Rp 12,500.00
Rp 20,000.00
Rp 2,500.00
Rp 3,000.00
Rp 5,800.00
Rp 20,000.00
Rp 25,000.00
Rp 30,000.00
Rp 35,000.00
Rp 110,000.00
Rp 125,000.00
Rp 135,000.00
Rp 107,000.00
Rp 55,000.00
Rp 20,000.00
Rp 55,000.00
Rp 10,000.00
Rp 4,750.00
Rp 375,000.00
Rp 131,250.00
Rp 860,000.00
Rp 450,000.00
Rp 275,000.00
Rp 1,000,000.00
Rp 130,000.00
Rp 18,500.00
Rp 49,000.00
Rp 185,000.00
Rp 430,000.00
Rp 900,000.00
Rp 75,000.00
Rp 95,000.00
Rp 132,875.00
Rp 183,000.00
Rp 27,000.00
Rp 12,500.00
Rp 12,000.00
Rp 235,000.00
Rp 110,000.00
Rp 120,000.00
Rp 110,000.00
Rp 120,000.00
Rp 16,000.00
Rp 17,500.00
Rp 35,000.00
Rp 75,000.00
Rp 125,000.00
Rp 9,800.00
Rp 85,000.00
Rp 105,000.00
Rp 65,000.00
Rp 95,000.00
Rp 74,000.00
Rp 175,000.00
Rp 195,000.00
Rp 35,000.00
Rp 195,000.00
Rp 20,800.00
Rp 10,000.00
Rp 7,000.00
Rp 14,000.00
Rp 19,200.00
Rp 15,000.00
Rp 8,500.00
Rp 5,500.00
Rp 4,500.00
Rp 25,000.00
Rp 4,500.00
Rp 3,500.00
Rp 20,000.00
Rp 7,500.00
Rp 8,000.00
DAFTAR ANALISA
SUP.07.6.42b
1 M³ Membuat ring balok beton bertulang non struktur (150 Kg besi + bekisting)
5.0000 1 M² Pasang bekisting untuk balok Rp 192,206.00
1.0000 M³ Membuat beton bertulang , camp. Rp 926,960.00
### Kg Pembesian dengan besi polos Rp 13,422.90
JUMLAH
SUP.07.6.42c
1 M³ Membuat ring balok beton bertulang struktur (129 kg besi + bekisting)
5.0000 1 M² Pasang bekisting untuk balok Rp 192,206.00
1.0000 M³ Membuat beton bertulang , mutu Rp 1,129,500.00
### Kg Pembesian dengan besi polos Rp 13,422.90
JUMLAH
07.6.43 1 M³ Membuat dinding beton bertulang (150 kg besi + bekisting)
0.2400 M³ papan kayu kelas III (campuran) Rp 1,600,000.00
3.2000 Kg paku kayu Rp 20,700.00
1.6000 Lt minyak bekisting Rp 5,500.00
### Kg Besi beton polos ᴓ 6 mm - 19 mm Rp 11,800.00
2.2500 Kg Kawat beton / bindrat Rp 15,000.00
### Kg Semen PC Rp 1,200.00
0.5200 M³ pasir beton Rp 100,000.00
0.7800 M³ Batu becah 1/2 cm , 2/3 cm/koral bet Rp 368,000.00
0.1600 M³ Balok kayu kelas III (campuran) Rp 1,600,000.00
24.0000 Bt Kayu (galam) untuk perancah Rp 5,500.00
5.6000 Pekerja Rp 45,000.00
0.3500 Tukang Batu Rp 60,000.00
2.6400 Tukang Kayu Rp 60,000.00
1.0500 Tukang Besi Rp 60,000.00
0.4000 Kepala Tukang Rp 72,000.00
0.1930 Mandor Rp 75,000.00
JUMLAH
Rp 500.00
Rp 2,520.00
Rp 3,000.00
Rp 9,375.00
Rp 115,200.00
Rp 1,242.00
Rp 6,400.00
Rp 18,000.00
Rp 12,000.00
Rp 1,440.00
Rp 1,500.00
Rp 138,237.00 Rp 32,940.00 Rp 171,177.00
Rp 500.00
Rp 2,520.00
Rp 3,000.00
Rp 9,375.00
Rp 115,200.00
Rp 73,140.00
Rp 1,242.00
Rp 7,875.00
Rp 18,000.00
Rp 12,000.00
Rp 1,440.00
Rp 1,500.00
Rp 212,852.00 Rp 32,940.00 Rp 245,792.00
Rp 500.00
Rp 2,520.00
Rp 2,400.00
Rp 7,500.00
Rp 520,000.00
Rp 1,242.00
Rp 13,500.00
Rp 12,000.00
Rp 1,440.00
Rp 1,500.00
Rp 534,162.00 Rp 28,440.00 Rp 562,602.00
Rp 19,200.00
Rp 11,200.00
Rp 414.00
Rp 4,500.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 30,814.00 Rp 11,595.00 Rp 42,409.00
Rp 9,375.00
Rp 288,000.00
Rp 17,595.00
Rp 5,500.00
Rp 42,000.00
Rp 15,000.00
Rp 10,000.00
Rp 42,000.00
Rp 18,000.00
Rp 8,625.00
Rp 470,000.00
Rp 6,000.00
Rp 16,500.00
Rp 4,485.00
Rp 90,000.00
Rp 120,000.00
Rp 60,000.00
Rp 21,600.00
Rp 3,750.00
Rp 953,080.00 Rp 295,350.00 Rp 1,248,430.00
Rp 12,750.00
Rp 336,000.00
Rp 6,210.00
Rp 12,600.00
Rp 3,000.00
Rp 14,000.00
Rp 91,425.00
Rp 45,000.00
Rp 120,000.00
Rp 14,400.00
Rp 3,750.00
Rp 475,985.00 Rp 183,150.00 Rp 659,135.00
Rp 22,500.00
Rp 441,600.00
Rp 14,490.00
Rp 91,425.00
Rp 45,000.00
Rp 90,000.00
Rp 10,800.00
Rp 3,750.00
Rp 570,015.00 Rp 149,550.00 Rp 719,565.00
Rp 4,500.00
Rp 3,750.00
Rp 8,250.00 Rp 8,250.00
Rp 9,375.00
Rp 297,600.00
Rp 6,210.00
Rp 21,600.00
Rp 3,000.00
Rp 14,000.00
Rp 91,425.00
Rp 100,912.50
Rp 45,000.00
Rp 120,000.00
Rp 14,400.00
Rp 3,750.00
Rp 544,122.50 Rp 183,150.00 Rp 727,272.50
Rp 300,015.00
Rp 24,975.00
Rp 324,990.00 Rp 324,990.00
Rp 300,015.00
Rp 2,475.00
Rp 302,490.00 Rp 302,490.00
Rp 18,000.00
Rp 3,000.00
Rp 21,000.00 Rp 21,000.00
Rp 23,670.00
Rp 3,900.00
Rp 27,570.00 Rp 27,570.00
Rp 33,075.00
Rp 5,475.00
Rp 38,550.00 Rp 38,550.00
Rp 28,125.00
Rp 4,650.00
Rp 32,775.00 Rp 32,775.00
Rp 56,250.00
Rp 9,375.00
Rp 65,625.00 Rp 65,625.00
Rp 37,035.00
Rp 6,225.00
Rp 43,260.00 Rp 43,260.00
Rp 2,250.00
Rp 375.00
Rp 2,625.00 Rp 2,625.00
Rp 8,640.00
Rp 1,425.00
Rp 10,065.00 Rp 10,065.00
Rp 22,500.00
Rp 3,750.00
Rp 26,250.00 Rp 26,250.00
Rp 120,000.00
Rp 13,500.00
Rp 750.00
Rp 120,000.00 Rp 14,250.00 Rp 134,250.00
Rp 207,600.00
Rp 13,500.00
Rp 750.00
Rp 207,600.00 Rp 14,250.00 Rp 221,850.00
Rp 108,000.00
Rp 13,500.00
Rp 750.00
Rp 108,000.00 Rp 14,250.00 Rp 122,250.00
Rp 280,500.00
Rp 470,400.00
Rp 31,400.00
Rp 67,500.00
Rp 36,000.00
Rp 4,320.00
Rp 5,625.00
Rp 782,300.00 Rp 113,445.00 Rp 895,745.00
Rp 280,500.00
Rp 320,400.00
Rp 42,700.00
Rp 67,500.00
Rp 36,000.00
Rp 4,320.00
Rp 5,625.00
Rp 643,600.00 Rp 113,445.00 Rp 757,045.00
Rp 280,500.00
Rp 242,400.00
Rp 48,500.00
Rp 67,500.00
Rp 36,000.00
Rp 4,320.00
Rp 5,625.00
Rp 571,400.00 Rp 113,445.00 Rp 684,845.00
Rp 280,500.00
Rp 195,600.00
Rp 52,000.00
Rp 67,500.00
Rp 36,000.00
Rp 4,320.00
Rp 5,625.00
Rp 528,100.00 Rp 113,445.00 Rp 641,545.00
Rp 280,500.00
Rp 163,200.00
Rp 54,400.00
Rp 67,500.00
Rp 36,000.00
Rp 4,320.00
Rp 5,625.00
Rp 498,100.00 Rp 113,445.00 Rp 611,545.00
Rp 306,000.00
Rp 30,000.00
Rp 35,100.00
Rp 23,400.00
Rp 2,808.00
Rp 2,925.00
Rp 336,000.00 Rp 64,233.00 Rp 400,233.00
Rp 84,000.00
Rp 76,836.00
Rp 5,900.00
Rp 29,250.00
Rp 12,000.00
Rp 1,440.00
Rp 2,250.00
Rp 166,736.00 Rp 44,940.00 Rp 211,676.00
Rp 42,000.00
Rp 33,360.00
Rp 2,800.00
Rp 14,400.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 78,160.00 Rp 22,245.00 Rp 100,405.00
Rp 42,000.00
Rp 22,740.00
Rp 3,800.00
Rp 14,400.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 68,540.00 Rp 22,245.00 Rp 90,785.00
Rp 42,000.00
Rp 17,244.00
Rp 4,000.00
Rp 14,400.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 63,244.00 Rp 22,245.00 Rp 85,489.00
Rp 42,000.00
Rp 13,800.00
Rp 4,300.00
Rp 14,400.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 60,100.00 Rp 22,245.00 Rp 82,345.00
Rp 42,000.00
Rp 11,616.00
Rp 4,500.00
Rp 14,400.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 58,116.00 Rp 22,245.00 Rp 80,361.00
Rp 31,250.00
Rp 8,640.00
Rp 2,300.00
Rp 15,300.00
Rp 6,420.00
Rp 420.00
Rp 820.80
Rp 1,275.00
Rp 42,190.00 Rp 24,235.80 Rp 66,425.80
Rp 180,000.00
Rp 15,360.00
Rp 3,500.00
Rp 13,500.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 198,860.00 Rp 21,345.00 Rp 220,205.00
Rp 28,380.00
Rp 57,000.00
Rp 14,400.00
Rp 9,000.00
Rp 1,080.00
Rp 1,125.00
Rp 85,380.00 Rp 25,605.00 Rp 110,985.00
Rp 15,504.00
Rp 1,300.00
Rp 9,000.00
Rp 9,000.00
Rp 1,080.00
Rp 750.00
Rp 16,804.00 Rp 19,830.00 Rp 36,634.00
Rp 10,224.00
Rp 1,700.00
Rp 9,000.00
Rp 9,000.00
Rp 1,080.00
Rp 750.00
Rp 11,924.00 Rp 19,830.00 Rp 31,754.00
Rp 7,776.00
Rp 1,900.00
Rp 9,000.00
Rp 9,000.00
Rp 1,080.00
Rp 750.00
Rp 9,676.00 Rp 19,830.00 Rp 29,506.00
Rp 6,240.00
Rp 2,000.00
Rp 9,000.00
Rp 9,000.00
Rp 1,080.00
Rp 750.00
Rp 8,240.00 Rp 19,830.00 Rp 28,070.00
Rp 5,184.00
Rp 2,200.00
Rp 9,000.00
Rp 9,000.00
Rp 1,080.00
Rp 750.00
Rp 7,384.00 Rp 19,830.00 Rp 27,214.00
Rp 17,136.00
Rp 2,300.00
Rp 11,250.00
Rp 12,000.00
Rp 1,440.00
Rp 937.50
Rp 19,436.00 Rp 25,627.50 Rp 45,063.50
Rp 600.00
Rp 200.00
Rp 2,565.00
Rp 2,280.00
Rp 273.60
Rp 150.00
Rp 800.00 Rp 5,268.60 Rp 6,068.60
Rp 5,184.00
Rp 1,600.00
Rp 11,250.00
Rp 6,000.00
Rp 720.00
Rp 1,125.00
Rp 6,784.00 Rp 19,095.00 Rp 25,879.00
Rp 5,184.00
Rp 1,600.00
Rp 6,750.00
Rp 4,200.00
Rp 504.00
Rp 600.00
Rp 6,784.00 Rp 12,054.00 Rp 18,838.00
Rp 3,850,000.00
Rp 270,000.00
Rp1,200,000.00
Rp 144,000.00
Rp 22,500.00
Rp 3,850,000.00 Rp1,636,500.00 Rp 5,486,500.00
Rp 3,120,000.00
Rp 270,000.00
Rp1,080,000.00
Rp 144,000.00
Rp 22,500.00
Rp 3,120,000.00 Rp1,516,500.00 Rp 4,636,500.00
Rp 152,000.00
Rp 45,000.00
Rp 150,000.00
Rp 18,000.00
Rp 3,750.00
Rp 152,000.00 Rp 216,750.00 Rp 368,750.00
Rp 112,000.00
Rp 45,000.00
Rp 150,000.00
Rp 18,000.00
Rp 3,750.00
Rp 112,000.00 Rp 216,750.00 Rp 328,750.00
Rp 133,000.00
Rp 36,000.00
Rp 120,000.00
Rp 14,400.00
Rp 3,000.00
Rp 133,000.00 Rp 173,400.00 Rp 306,400.00
Rp 98,000.00
Rp 36,000.00
Rp 120,000.00
Rp 14,400.00
Rp 3,000.00
Rp 98,000.00 Rp 173,400.00 Rp 271,400.00
Rp 243,200.00
Rp 45,000.00
Rp 180,000.00
Rp 21,600.00
Rp 22,500.00
Rp 243,200.00 Rp 269,100.00 Rp 512,300.00
Rp 179,200.00
Rp 45,000.00
Rp 180,000.00
Rp 21,600.00
Rp 37,500.00
Rp 179,200.00 Rp 284,100.00 Rp 463,300.00
Rp 2,860,000.00
Rp 75,000.00
Rp 16,560.00
Rp 180,000.00
Rp 720,000.00
Rp 86,400.00
Rp 15,000.00
Rp 2,951,560.00 Rp1,001,400.00 Rp 3,952,960.00
Rp 31,200.00
Rp 3,105.00
Rp 4,500.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 34,305.00 Rp 11,595.00 Rp 45,900.00
Rp 49,000.00
Rp 4,200.00
Rp 4,500.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 53,200.00 Rp 11,595.00 Rp 64,795.00
Rp 36,400.00
Rp 3,105.00
Rp 4,500.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 39,505.00 Rp 11,595.00 Rp 51,100.00
Rp 429,000.00
Rp 4,140.00
Rp 5,400.00
Rp 7,200.00
Rp 864.00
Rp 450.00
Rp 433,140.00 Rp 13,914.00 Rp 447,054.00
Rp 42,000.00
Rp 2,800.00
Rp 6,750.00
Rp 15,000.00
Rp 1,800.00
Rp 5,625.00
Rp 44,800.00 Rp 29,175.00 Rp 73,975.00
Rp 31,200.00
Rp 2,070.00
Rp 6,750.00
Rp 15,000.00
Rp 1,800.00
Rp 5,625.00
Rp 33,270.00 Rp 29,175.00 Rp 62,445.00
Rp 29,900.00
Rp 2,070.00
Rp 6,750.00
Rp 15,000.00
Rp 1,800.00
Rp 5,625.00
Rp 31,970.00 Rp 29,175.00 Rp 61,145.00
Rp 80,500.00
Rp 4,200.00
Rp 9,000.00
Rp 18,000.00
Rp 2,160.00
Rp 750.00
Rp 84,700.00 Rp 29,910.00 Rp 114,610.00
Rp 59,800.00
Rp 3,105.00
Rp 9,000.00
Rp 18,000.00
Rp 2,160.00
Rp 750.00
Rp 62,905.00 Rp 29,910.00 Rp 92,815.00
Rp 41,800.00
Rp 1,400.00
Rp 4,950.00
Rp 13,200.00
Rp 1,584.00
Rp 375.00
Rp 43,200.00 Rp 20,109.00 Rp 63,309.00
Rp 30,800.00
Rp 1,035.00
Rp 4,950.00
Rp 13,200.00
Rp 1,584.00
Rp 375.00
Rp 31,835.00 Rp 20,109.00 Rp 51,944.00
Rp 40,600.00
Rp 1,242.00
Rp 6,750.00
Rp 15,000.00
Rp 1,800.00
Rp 5,625.00
Rp 41,842.00 Rp 29,175.00 Rp 71,017.00
Rp 24,080.00
Rp 1,242.00
Rp 4,500.00
Rp 6,000.00
Rp 720.00
Rp 3,750.00
Rp 25,322.00 Rp 14,970.00 Rp 40,292.00
Rp 50,700.00
Rp 19,600.00
Rp 2,070.00
Rp 6,750.00
Rp 27,000.00
Rp 3,240.00
Rp 5,625.00
Rp 72,370.00 Rp 42,615.00 Rp 114,985.00
Rp 50,700.00
Rp 19,600.00
Rp 100,000.00
Rp 7,000.00
Rp 2,070.00
Rp 6,750.00
Rp 27,000.00
Rp 3,240.00
Rp 5,625.00
Rp 179,370.00 Rp 42,615.00 Rp 221,985.00
Rp 50,700.00
Rp 19,600.00
Rp 74,750.00
Rp 7,000.00
Rp 2,070.00
Rp 6,750.00
Rp 27,000.00
Rp 3,240.00
Rp 5,625.00
Rp 154,120.00 Rp 42,615.00 Rp 196,735.00
Rp 50,700.00
Rp 19,600.00
Rp 70,000.00
Rp 7,000.00
Rp 2,070.00
Rp 6,750.00
Rp 27,000.00
Rp 3,240.00
Rp 5,625.00
Rp 149,370.00 Rp 42,615.00 Rp 191,985.00
Rp 15,750.00
Rp 207.00
Rp 945.00
Rp 1,260.00
Rp 144.00
Rp 75.00
Rp 15,957.00 Rp 2,424.00 Rp 18,381.00
Rp 63,000.00
Rp 414.00
Rp 1,485.00
Rp 30,000.00
Rp 1,800.00
Rp 150.00
Rp 63,414.00 Rp 33,435.00 Rp 96,849.00
Rp 261,600.00
Rp 52,000.00
Rp 320,160.00
Rp 74,250.00
Rp 15,000.00
Rp 1,800.00
Rp 6,000.00
Rp 633,760.00 Rp 97,050.00 Rp 730,810.00
Rp 236,400.00
Rp 47,000.00
Rp 345,920.00
Rp 74,250.00
Rp 15,000.00
Rp 1,800.00
Rp 6,000.00
Rp 629,320.00 Rp 97,050.00 Rp 726,370.00
Rp 207,600.00
Rp 57,000.00
Rp 320,160.00
Rp 74,250.00
Rp 15,000.00
Rp 1,800.00
Rp 6,000.00
Rp 584,760.00 Rp 97,050.00 Rp 681,810.00
Rp 12,000.00
Rp 2,600.00
Rp 16,192.00
Rp 51,750.00
Rp 1,200.00
Rp 144.00
Rp 450.00
Rp 30,792.00 Rp 53,544.00 Rp 84,336.00
Rp 574,800.00
Rp 37,000.00
Rp 272,320.00
Rp 74,250.00
Rp 15,000.00
Rp 1,800.00
Rp 6,000.00
Rp 884,120.00 Rp 97,050.00 Rp 981,170.00
Rp 403,200.00
Rp 54,000.00
Rp 298,080.00
Rp 90,000.00
Rp 21,000.00
Rp 2,520.00
Rp 75,000.00
Rp 755,280.00 Rp 188,520.00 Rp 943,800.00
Rp 349,200.00
Rp 47,000.00
Rp 342,240.00
Rp 90,000.00
Rp 21,000.00
Rp 2,520.00
Rp 75,000.00
Rp 738,440.00 Rp 188,520.00 Rp 926,960.00
Rp 12,390.00
Rp 225.00
Rp 315.00
Rp 420.00
Rp 50.40
Rp 22.50
Rp 12,615.00 Rp 807.90 Rp 13,422.90
Rp 64,000.00
Rp 6,210.00
Rp 550.00
Rp 13,500.00
Rp 15,600.00
Rp 1,872.00
Rp 375.00
Rp 70,760.00 Rp 31,347.00 Rp 102,107.00
Rp 72,000.00
Rp 6,210.00
Rp 550.00
Rp 13,500.00
Rp 15,600.00
Rp 1,872.00
Rp 375.00
Rp 78,760.00 Rp 31,347.00 Rp 110,107.00
Rp 64,000.00
Rp 8,280.00
Rp 1,100.00
Rp 24,000.00
Rp 42,000.00
Rp 11,000.00
Rp 14,400.00
Rp 19,800.00
Rp 2,376.00
Rp 450.00
Rp 150,380.00 Rp 37,026.00 Rp 187,406.00
Rp 64,000.00
Rp 8,280.00
Rp 1,100.00
Rp 28,800.00
Rp 42,000.00
Rp 11,000.00
Rp 14,400.00
Rp 19,800.00
Rp 2,376.00
Rp 450.00
Rp 155,180.00 Rp 37,026.00 Rp 192,206.00
Rp 64,000.00
Rp 8,280.00
Rp 1,100.00
Rp 24,000.00
Rp 42,000.00
Rp 33,000.00
Rp 14,400.00
Rp 19,800.00
Rp 2,376.00
Rp 450.00
Rp 172,380.00 Rp 37,026.00 Rp 209,406.00
Rp 48,000.00
Rp 8,280.00
Rp 1,100.00
Rp 32,000.00
Rp 42,000.00
Rp 16,500.00
Rp 32,000.00
Rp 14,400.00
Rp 19,800.00
Rp 2,376.00
Rp 450.00
Rp 179,880.00 Rp 37,026.00 Rp 216,906.00
Rp 48,000.00
Rp 8,280.00
Rp 825.00
Rp 24,000.00
Rp 42,000.00
Rp 11,000.00
Rp 14,400.00
Rp 19,800.00
Rp 2,376.00
Rp 450.00
Rp 134,105.00 Rp 37,026.00 Rp 171,131.00
Rp 465,600.00
Rp 65,000.00
Rp 239,200.00
Rp 270,000.00
Rp 60,000.00
Rp 7,200.00
Rp 22,500.00
Rp 769,800.00 Rp 359,700.00 Rp 1,129,500.00
Rp 480,000.00
Rp 40,000.00
Rp 301,760.00
Rp 270,000.00
Rp 60,000.00
Rp 7,200.00
Rp 22,500.00
Rp 821,760.00 Rp 359,700.00 Rp 1,181,460.00
Rp 42,240.00
Rp 12,420.00
Rp 2,750.00
Rp 6,750.00
Rp 3,000.00
Rp 360.00
Rp 525.00
Rp 57,410.00 Rp 10,635.00 Rp 68,045.00
Rp 320,000.00
Rp 31,050.00
Rp 2,200.00
Rp 837,800.00
Rp 33,750.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 175,500.00
Rp 21,000.00
Rp 62,400.00
Rp 63,000.00
Rp 17,640.00
Rp 12,375.00
Rp 1,951,440.00 Rp 351,915.00 Rp 2,303,355.00
ktur (100 kg besi + bekisting)
Rp 550,535.00
Rp 1,129,500.00
Rp 1,342,290.00
Rp 3,022,325.00
ng struktur (90 kg + bekisting)
Rp 272,180.00
Rp 926,960.00
Rp 1,208,061.00
Rp 2,407,201.00
g besi + bekisting)
Rp 1,326,168.20
Rp 926,960.00
Rp 1,449,673.20
Rp 975,600.00
Rp 4,678,401.40
g besi + bekisting)
Rp 1,326,168.20
Rp 926,960.00
Rp 1,342,290.00
Rp 975,600.00
Rp 4,571,018.20
dag/talang (75 kg besi + bekisting)
Rp 1,326,168.20
Rp 926,960.00
Rp 1,006,717.50
Rp 975,600.00
Rp 4,235,445.70
Rp 480,000.00
Rp 62,100.00
Rp 90,000.00
Rp 300,000.00
Rp 36,000.00
Rp 7,500.00
Rp 542,100.00 Rp 433,500.00 Rp 975,600.00
Rp 432,000.00
Rp 41,400.00
Rp 3,300.00
Rp 2,360,000.00
Rp 45,000.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 218,250.00
Rp 21,000.00
Rp 93,600.00
Rp 84,000.00
Rp 23,832.00
Rp 12,750.00
Rp 3,608,340.00 Rp 453,432.00 Rp 4,061,772.00
Rp 432,000.00
Rp 41,400.00
Rp 3,300.00
Rp 1,770,000.00
Rp 45,000.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 218,250.00
Rp 21,000.00
Rp 93,600.00
Rp 23,832.00
Rp 12,750.00
Rp 3,018,340.00 Rp 369,432.00 Rp 3,387,772.00
Rp 550,535.00
Rp 926,960.00
Rp 1,422,827.40
Rp 2,900,322.40
Rp 640,000.00
Rp 82,800.00
Rp 11,000.00
Rp 2,194,800.00
Rp 67,500.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 240,000.00
Rp 110,000.00
Rp 328,500.00
Rp 21,000.00
Rp 198,000.00
Rp 126,000.00
Rp 41,040.00
Rp 18,750.00
Rp 4,072,740.00 Rp 733,290.00 Rp 4,806,030.00
Rp 640,000.00
Rp 82,800.00
Rp 11,000.00
Rp 2,194,800.00
Rp 67,500.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 240,000.00
Rp 110,000.00
Rp 328,500.00
Rp 21,000.00
Rp 198,000.00
Rp 126,000.00
Rp 41,040.00
Rp 18,750.00
Rp 4,072,740.00 Rp 733,290.00 Rp 4,806,030.00
Rp 640,000.00
Rp 82,800.00
Rp 11,000.00
Rp 1,073,800.00
Rp 67,500.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 240,000.00
Rp 110,000.00
Rp 328,500.00
Rp 21,000.00
Rp 198,000.00
Rp 126,000.00
Rp 41,040.00
Rp 18,750.00
Rp 2,951,740.00 Rp 733,290.00 Rp 3,685,030.00
Rp 640,000.00
Rp 82,800.00
Rp 11,000.00
Rp 1,770,000.00
Rp 67,500.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 240,000.00
Rp 110,000.00
Rp 328,500.00
Rp 21,000.00
Rp 198,000.00
Rp 126,000.00
Rp 41,040.00
Rp 18,750.00
Rp 3,647,940.00 Rp 733,290.00 Rp 4,381,230.00
Rp 512,000.00
Rp 66,240.00
Rp 8,800.00
Rp 2,360,000.00
Rp 45,000.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 224,000.00
Rp 88,000.00
Rp 268,200.00
Rp 21,000.00
Rp 168,000.00
Rp 84,000.00
Rp 32,760.00
Rp 15,600.00
Rp 4,030,680.00 Rp 589,560.00 Rp 4,620,240.00
Rp 512,000.00
Rp 66,240.00
Rp 8,800.00
Rp 2,135,800.00
Rp 45,000.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 224,000.00
Rp 88,000.00
Rp 268,200.00
Rp 21,000.00
Rp 168,000.00
Rp 84,000.00
Rp 32,760.00
Rp 15,600.00
Rp 3,806,480.00 Rp 589,560.00 Rp 4,396,040.00
Rp 512,000.00
Rp 66,240.00
Rp 8,800.00
Rp 1,770,000.00
Rp 33,750.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 192,000.00
Rp 176,000.00
Rp 261,000.00
Rp 21,000.00
Rp 168,000.00
Rp 63,000.00
Rp 30,240.00
Rp 13,875.00
Rp 3,485,430.00 Rp 557,115.00 Rp 4,042,545.00
kg besi + bekisting)
Rp 961,030.00
Rp 926,960.00
Rp 2,590,619.70
Rp 4,478,609.70
Kg besi + bekisting)
Rp 961,030.00
Rp 926,960.00
Rp 2,013,435.00
Rp 3,901,425.00
esi + bekisting)
Rp 961,030.00
Rp 1,129,500.00
Rp 1,731,554.10
Rp 3,822,084.10
Rp 384,000.00
Rp 66,240.00
Rp 8,800.00
Rp 1,770,000.00
Rp 33,750.00
Rp 387,600.00
Rp 52,000.00
Rp 287,040.00
Rp 256,000.00
Rp 132,000.00
Rp 252,000.00
Rp 21,000.00
Rp 158,400.00
Rp 63,000.00
Rp 28,800.00
Rp 14,475.00
Rp 3,377,430.00 Rp 537,675.00 Rp 3,915,105.00
Rp 3,200.00
Rp 207.00
Rp 16,500.00
Rp 5,310.00
Rp 60,000.00
Rp 7.20
Rp 900.00
Rp 22,080.00
Rp 32,000.00
Rp 900.00
Rp 1,200.00
Rp 360.00
Rp 360.00
Rp 432.00
Rp 225.00
Rp 140,204.20 Rp 3,477.00 Rp 143,681.20
Rp 3,200.00
Rp 207.00
Rp 16,500.00
Rp 5,310.00
Rp 60,000.00
Rp 7.20
Rp 900.00
Rp 22,080.00
Rp 32,000.00
Rp 900.00
Rp 1,200.00
Rp 360.00
Rp 360.00
Rp 432.00
Rp 225.00
Rp 140,204.20 Rp 3,477.00 Rp 143,681.20
Rp 3,200.00
Rp 207.00
Rp 16,500.00
Rp 5,310.00
Rp 60,000.00
Rp 7.20
Rp 900.00
Rp 22,080.00
Rp 32,000.00
Rp 900.00
Rp 1,200.00
Rp 360.00
Rp 360.00
Rp 432.00
Rp 225.00
Rp 140,204.20 Rp 3,477.00 Rp 143,681.20
Rp 180,000.00
Rp 180,000.00 Rp 180,000.00
Rp 25,000.00
Rp 6,750.00
Rp 4,500.00
Rp 576.00
Rp 600.00
Rp 25,000.00 Rp 12,426.00 Rp 37,426.00
Rp 74,400.00
Rp 33,864.00
Rp 42,075.00
Rp 64,770.00
Rp 163,785.52
Rp 50,388.00
Rp 65,132.10
Rp 107,161.20
Rp 1,552.50
Rp 9,000.00
Rp 6,000.00
Rp 720.00
Rp 75.00
Rp 75,952.50 Rp 15,795.00 Rp 91,747.50
Rp 35,416.50 Rp 15,795.00 Rp 51,211.50
Rp 43,627.50 Rp 15,795.00 Rp 59,422.50
Rp 66,322.50 Rp 15,795.00 Rp 82,117.50
Rp 165,338.02 Rp 15,795.00 Rp 181,133.02
Rp 51,940.50 Rp 15,795.00 Rp 67,735.50
Rp 66,684.60 Rp 15,795.00 Rp 82,479.60
Rp 108,713.70 Rp 15,795.00 Rp 124,508.70
Rp 19,000.00
Rp 27,500.00
Rp 144.38
Rp 11,250.00
Rp 9,000.00
Rp 1,080.00
Rp 975.00
Rp 19,144.38 Rp 22,305.00 Rp 41,449.38
Rp 27,644.38 Rp 22,305.00 Rp 49,949.38
Rp 28,031.25
Rp 840.00
Rp 3,150.00
Rp 6,000.00
Rp 7,200.00
Rp 750.00
Rp 28,871.25 Rp 17,100.00 Rp 45,971.25
Rp 12,650.00
Rp 207.00
Rp 2,250.00
Rp 3,000.00
Rp 360.00
Rp 225.00
Rp 12,857.00 Rp 5,835.00 Rp 18,692.00
Rp 16,500.00
Rp 207.00
Rp 2,250.00
Rp 3,000.00
Rp 360.00
Rp 225.00
Rp 16,707.00 Rp 5,835.00 Rp 22,542.00
Rp 17,812.50
Rp 621.00
Rp 3,150.00
Rp 6,000.00
Rp 720.00
Rp 262.50
Rp 18,433.50 Rp 10,132.50 Rp 28,566.00
Rp 1,650,000.00
Rp 1,500.00
Rp 148,500.00
Rp 66,000.00
Rp 7,920.00
Rp 12,000.00
Rp 1,651,500.00 Rp 234,420.00 Rp 1,885,920.00
Rp 150,000.00
Rp 7,200.00
Rp 1,000.00
Rp 45,000.00
Rp 90,000.00
Rp 10,800.00
Rp 12,000.00
Rp 158,200.00 Rp 157,800.00 Rp 316,000.00
Rp 150,000.00
Rp 7,200.00
Rp 1,000.00
Rp 45,000.00
Rp 90,000.00
Rp 10,800.00
Rp 12,000.00
Rp 158,200.00 Rp 157,800.00 Rp 316,000.00
Rp 350,000.00
Rp 7,500.00
Rp 7,200.00
Rp 1,000.00
Rp 45,000.00
Rp 60,000.00
Rp 7,200.00
Rp 7,500.00
Rp 365,700.00 Rp 119,700.00 Rp 485,400.00
Rp 350,000.00
Rp 3,000.00
Rp 7,200.00
Rp 1,000.00
Rp 54,000.00
Rp 87,000.00
Rp 10,800.00
Rp 7,500.00
Rp 361,200.00 Rp 159,300.00 Rp 520,500.00
Rp 350,000.00
Rp 4,500.00
Rp 81,000.00
Rp 162,000.00
Rp 38,880.00
Rp 8,250.00
Rp 354,500.00 Rp 290,130.00 Rp 644,630.00
Rp 60,500.00
Rp 16.20
Rp 4,704.00
Rp 5,600.00
-
Rp 6,300.00
Rp 4,200.00
Rp 504.00
Rp 525.00
Rp 70,820.20 Rp 11,529.00 Rp 82,349.20
Rp 124,200.00
Rp 92,400.00
Rp 13,000.00
Rp 5,600.00
Rp 30,680.00
Rp 9,000.00
Rp 63,900.00
Rp 28,380.00
Rp 3,384.00
Rp 5,325.00
Rp 274,880.00 Rp 100,989.00 Rp 375,869.00
Rp 22,200.00
Rp 4,375.00
Rp 1,620.00
Rp 3,600.00
Rp 432.00
Rp 135.00
Rp 26,575.00 Rp 5,787.00 Rp 32,362.00
Rp 28,800.00
Rp 4,375.00
Rp 1,620.00
Rp 3,600.00
Rp 432.00
Rp 135.00
Rp 33,175.00 Rp 5,787.00 Rp 38,962.00
Rp 40,800.00
Rp 4,375.00
Rp 1,620.00
Rp 3,600.00
Rp 432.00
Rp 135.00
Rp 45,175.00 Rp 5,787.00 Rp 50,962.00
Rp 58,440.00
Rp 4,375.00
Rp 1,620.00
Rp 3,600.00
Rp 432.00
Rp 135.00
Rp 62,815.00 Rp 5,787.00 Rp 68,602.00
Rp 32,400.00
Rp 4,375.00
Rp 1,620.00
Rp 3,600.00
Rp 432.00
Rp 135.00
Rp 36,775.00 Rp 5,787.00 Rp 42,562.00
Rp 90,000.00
Rp 4,375.00
Rp 2,430.00
Rp 5,400.00
Rp 648.00
Rp 202.50
Rp 94,375.00 Rp 8,680.50 Rp 103,055.50
Rp 43,200.00
Rp 4,375.00
Rp 2,430.00
Rp 5,400.00
Rp 648.00
Rp 202.50
Rp 47,575.00 Rp 8,680.50 Rp 56,255.50
Rp 132,000.00
Rp 4,375.00
Rp 3,645.00
Rp 8,100.00
Rp 972.00
Rp 307.50
Rp 136,375.00 Rp 13,024.50 Rp 149,399.50
Rp 90,600.00
Rp 4,375.00
Rp 3,645.00
Rp 8,100.00
Rp 972.00
Rp 307.50
Rp 94,975.00 Rp 13,024.50 Rp 107,999.50
Rp 300,000.00
Rp 4,375.00
Rp 3,645.00
Rp 8,100.00
Rp 972.00
Rp 307.50
Rp 304,375.00 Rp 13,024.50 Rp 317,399.50
Rp 124,800.00
Rp 4,375.00
Rp 3,645.00
Rp 8,100.00
Rp 972.00
Rp 307.50
Rp 129,175.00 Rp 13,024.50 Rp 142,199.50
Rp 210,000.00
Rp 25,000.00
Rp 1,350.00
Rp 18,000.00
Rp 2,160.00
Rp 112.50
Rp 235,000.00 Rp 21,622.50 Rp 256,622.50
Rp 30,000.00
Rp 162.50
Rp 450.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 30,162.50 Rp 7,545.00 Rp 37,707.50
Rp 47,500.00
Rp 162.50
Rp 450.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 47,662.50 Rp 7,545.00 Rp 55,207.50
G/TOHO/ setara
Rp 65,000.00
Rp 162.50
Rp 450.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 65,162.50 Rp 7,545.00 Rp 72,707.50
Rp 25,000.00
Rp 450.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 25,000.00 Rp 7,545.00 Rp 32,545.00
Rp 16,500.00
Rp 2,240.00
Rp 2,700.00
Rp 3,600.00
Rp 432.00
Rp 225.00
Rp 18,740.00 Rp 6,957.00 Rp 25,697.00
Rp 275,000.00
Rp 47,250.00
Rp 90,000.00
Rp 7,560.00
Rp 390.00
Rp 275,000.00 Rp 145,200.00 Rp 420,200.00
Rp 135,000.00
Rp 2,700.00
Rp 36,000.00
Rp 4,320.00
Rp 390.00
Rp 135,000.00 Rp 43,410.00 Rp 178,410.00
Rp 110,000.00
Rp 450.00
Rp 30,000.00
Rp 720.00
Rp 375.00
Rp 110,000.00 Rp 31,545.00 Rp 141,545.00
Rp 125,000.00
Rp 450.00
Rp 30,000.00
Rp 720.00
Rp 375.00
Rp 125,000.00 Rp 31,545.00 Rp 156,545.00
Rp 55,000.00
Rp 225.00
Rp 30,000.00
Rp 360.00
Rp 187.50
Rp 55,000.00 Rp 30,772.50 Rp 85,772.50
Rp 30,000.00
Rp 675.00
Rp 9,000.00
Rp 1,080.00
Rp 525.00
Rp 30,000.00 Rp 11,280.00 Rp 41,280.00
Rp 35,000.00
Rp 675.00
Rp 9,000.00
Rp 1,080.00
Rp 525.00
Rp 35,000.00 Rp 11,280.00 Rp 46,280.00
Rp 20,000.00
Rp 450.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 20,000.00 Rp 7,545.00 Rp 27,545.00
Rp 25,000.00
Rp 450.00
Rp 6,000.00
Rp 720.00
Rp 375.00
Rp 25,000.00 Rp 7,545.00 Rp 32,545.00
Rp 10,000.00
Rp 675.00
Rp 9,000.00
Rp 1,080.00
Rp 600.00
Rp 10,000.00 Rp 11,355.00 Rp 21,355.00
Rp 375,000.00
Rp 2,250.00
Rp 30,000.00
Rp 3,600.00
Rp 187.50
Rp 375,000.00 Rp 36,037.50 Rp 411,037.50
Rp 20,000.00
Rp 900.00
Rp 12,000.00
Rp 1,440.00
Rp 75.00
Rp 20,000.00 Rp 14,415.00 Rp 34,415.00
Rp 131,250.00
Rp 2,250.00
Rp 30,000.00
Rp 3,600.00
Rp 187.50
Rp 131,250.00 Rp 36,037.50 Rp 167,287.50
Rp 104,500.00
Rp 675.00
Rp 9,000.00
Rp 1,080.00
Rp 600.00
Rp 104,500.00 Rp 11,355.00 Rp 115,855.00
Rp 146,162.50
Rp 675.00
Rp 9,000.00
Rp 1,080.00
Rp 600.00
Rp 146,162.50 Rp 11,355.00 Rp 157,517.50
Rp 201,300.00
Rp 675.00
Rp 9,000.00
Rp 1,080.00
Rp 600.00
Rp 201,300.00 Rp 11,355.00 Rp 212,655.00
ai Dan Dinding
Rp 60,000.00
Rp 60,000.00
Rp 55,000.00
Rp 65,000.00
Rp 13,656.00
Rp 4,200.00
Rp 12,750.00
Rp 27,900.00
Rp 21,000.00
Rp 2,520.00
Rp 2,250.00
Rp 90,606.00 Rp 53,670.00 Rp 144,276.00
Rp 90,606.00 Rp 53,670.00 Rp 144,276.00
Rp 85,606.00 Rp 53,670.00 Rp 139,276.00
Rp 95,606.00 Rp 53,670.00 Rp 149,276.00
Rp 52,000.00
Rp 60,000.00
Rp 45,500.00
Rp 65,000.00
Rp 13,656.00
Rp 4,200.00
Rp 12,750.00
Rp 27,900.00
Rp 21,000.00
Rp 2,520.00
Rp 2,250.00
Rp 82,606.00 Rp 53,670.00 Rp 136,276.00
Rp 90,606.00 Rp 53,670.00 Rp 144,276.00
Rp 76,106.00 Rp 53,670.00 Rp 129,776.00
Rp 95,606.00 Rp 53,670.00 Rp 149,276.00
Rp 52,000.00
Rp 52,000.00
Rp 48,000.00
Rp 62,500.00
Rp 62,500.00
Rp 145,000.00
Rp 185,000.00
Rp 13,656.00
Rp 4,200.00
Rp 12,750.00
Rp 27,900.00
Rp 21,000.00
Rp 2,520.00
Rp 2,250.00
Rp 82,606.00 Rp 53,670.00 Rp 136,276.00
Rp 82,606.00 Rp 53,670.00 Rp 136,276.00
Rp 78,606.00 Rp 53,670.00 Rp 132,276.00
Rp 93,106.00 Rp 53,670.00 Rp 146,776.00
Rp 93,106.00 Rp 53,670.00 Rp 146,776.00
Rp 175,606.00 Rp 53,670.00 Rp 229,276.00
Rp 215,606.00 Rp 53,670.00 Rp 269,276.00
Rp 45,500.00
Rp 13,656.00
Rp 4,200.00
Rp 12,750.00
Rp 27,900.00
Rp 21,000.00
Rp 2,520.00
Rp 2,250.00
Rp 76,106.00 Rp 53,670.00 Rp 129,776.00
Rp 62,500.00
Rp 62,500.00
Rp 13,656.00
Rp 4,200.00
Rp 12,750.00
Rp 27,900.00
Rp 21,000.00
Rp 2,520.00
Rp 2,250.00
Rp 93,106.00 Rp 53,670.00 Rp 146,776.00
Rp 93,106.00 Rp 53,670.00 Rp 146,776.00
Rp 60,000.00
Rp 60,000.00
Rp 55,000.00
Rp 65,000.00
Rp 11,160.00
Rp 1,800.00
Rp 12,750.00
Rp 27,000.00
Rp 27,000.00
Rp 3,240.00
Rp 2,250.00
Rp 85,710.00 Rp 59,490.00 Rp 145,200.00
Rp 85,710.00 Rp 59,490.00 Rp 145,200.00
Rp 80,710.00 Rp 59,490.00 Rp 140,200.00
Rp 90,710.00 Rp 59,490.00 Rp 150,200.00
Rp 60,000.00
Rp 60,000.00
Rp 57,000.00
Rp 65,000.00
Rp 11,160.00
Rp 1,800.00
Rp 12,750.00
Rp 27,000.00
Rp 27,000.00
Rp 3,240.00
Rp 2,250.00
Rp 85,710.00 Rp 59,490.00 Rp 145,200.00
Rp 85,710.00 Rp 59,490.00 Rp 145,200.00
Rp 82,710.00 Rp 59,490.00 Rp 142,200.00
Rp 90,710.00 Rp 59,490.00 Rp 150,200.00
Rp 52,000.00
Rp 60,000.00
Rp 45,500.00
Rp 65,000.00
Rp 11,160.00
Rp 1,800.00
Rp 12,750.00
Rp 27,000.00
Rp 27,000.00
Rp 3,240.00
Rp 2,250.00
Rp 77,710.00 Rp 59,490.00 Rp 137,200.00
Rp 85,710.00 Rp 59,490.00 Rp 145,200.00
Rp 71,210.00 Rp 59,490.00 Rp 130,700.00
Rp 90,710.00 Rp 59,490.00 Rp 150,200.00
Rp 52,000.00
Rp 52,000.00
Rp 48,000.00
Rp 62,500.00
Rp 62,500.00
Rp 185,000.00
Rp 11,160.00
Rp 1,800.00
Rp 12,750.00
Rp 27,000.00
Rp 27,000.00
Rp 3,240.00
Rp 2,250.00
Rp 77,710.00 Rp 59,490.00 Rp 137,200.00
Rp 77,710.00 Rp 59,490.00 Rp 137,200.00
Rp 73,710.00 Rp 59,490.00 Rp 133,200.00
Rp 88,210.00 Rp 59,490.00 Rp 147,700.00
Rp 88,210.00 Rp 59,490.00 Rp 147,700.00
Rp 210,710.00 Rp 59,490.00 Rp 270,200.00
Rp 425.00
Rp 6,750.00
Rp 187.50
Rp 425.00 Rp 6,937.50 Rp 7,362.50
Rp 1,600.00
Rp 150.00
Rp 25.00
Rp 1,800.00
Rp 2,400.00
Rp 288.00
Rp 187.50
Rp 1,775.00 Rp 4,675.50 Rp 6,450.50
Rp 2,625.00
Rp 2,975.00
Rp 6,460.00
Rp 3,150.00
Rp 4,500.00
Rp 540.00
Rp 187.50
Rp 12,060.00 Rp 8,377.50 Rp 20,437.50
Rp 3,500.00
Rp 2,625.00
Rp -
Rp 9,880.00
Rp 3,150.00
Rp 540.00
Rp 432.00
Rp 187.50
Rp 16,005.00 Rp 4,309.50 Rp 20,314.50
Rp 14,400.00
Rp 1,800.00
Rp 3,780.00
Rp 4,536.00
Rp 187.50
Rp 14,400.00 Rp 10,303.50 Rp 24,703.50
Rp 6,000.00
Rp 14,880.00
Rp 6,000.00
Rp -
Rp 3,600.00
Rp 1,152.00
Rp 187.50
Rp 26,880.00 Rp 4,939.50 Rp 31,819.50
Rp 5,600.00
Rp 4,500.00
Rp 450.00
Rp 5,600.00 Rp 4,950.00 Rp 10,550.00
Rp 1,125.00
Rp 1,842.50
Rp 3,640.00
Rp 900.00
Rp 3,780.00
Rp 216.00
Rp 187.50
Rp 6,607.50 Rp 5,083.50 Rp 11,691.00
Rp -
Rp 3,360.00
Rp 21,528.00
Rp 900.00
Rp 3,780.00
Rp 453.60
Rp 187.50
Rp 24,888.00 Rp 5,321.10 Rp 30,209.10
Rp -
Rp 3,360.00
Rp 13,416.00
Rp 900.00
Rp 3,780.00
Rp 453.60
Rp 187.50
Rp 16,776.00 Rp 5,321.10 Rp 22,097.10
PERHITUNGAN VOLUME PEKERJAAN
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan pasang patok pasang bowplank 45.00 m
2 Pekerjaan Pengurusan Ijin Mendirikan Bangunan 1.00 m²
3 Pekerjaan Pembersihan Lokasi bangunan 75.00 m²
II PEKERJAAN TANAH
1 Galian tanah pondasi 28.01 m³
2 Urugan kembali tanah bekas galian pondasi 12.27 m³
3 Pek. Timbunan Tanah urug bawah lantai 7.50 m³
4 Pek. Timbunan pasir urug bawah lantai 2.63 m³
IV PEKERJAAN PEMBETONAN
1 Pekerjaan sloop beton 15/20 1.30 m³
2 Pekerjaan kolom beton 15/15 1.15 m³
3 Pekerjaan ringbalk 15/15 0.98 m³
IX PEKERJAAN PLAFOND
1 Pek. Rangka plafond kayu lanan uk 5/7 33.00 m²
2 Pek. Plafond plywood 4 mm 33.00 m²
XI PEKERJAAN PENGGANTUNG
1 Pek. Engsel pintu kwalitas standart 10.00 Buah
2 Pek. Engsel jendela dan ventilasi kwalitas standart 8.00 Buah
3 Pekerjaan pasang kunci tanam double slagg pintu 5.00 Buah
4 Pasang grendel daun jendela 4.00 Buah
5 Pasang kait angin daun jendela 8.00 Buah
DIBULATKAN
TERBILANG : Delapan puluh tiga juta dua ratus lima puluh satu ribu rupiah
AYA RUMAH TINGGAL TYPE 36
AN TOTAL
Rp 3,908,405.00
Rp 2,310,951.43
Rp 9,500,811.33
Rp 13,257,552.84
Rp 15,039,083.24
Rp 5,274,446.90
Rp 10,246,396.13
Rp 6,492,593.75
Rp 3,534,836.25
Rp 2,269,500.00
Rp 1,649,385.00
Rp 5,744,046.58
Rp 3,522,730.00
Rp 500,000.00
JUMLAH BIAYA KONSTRUKSI Rp 83,250,738.45
Rp 83,251,000.00
GANTT CHART
Bulan 1 Bulan 2 Bulan
No. Jenis Pekerjaan 1 2 3 4 1 2 3 4 1
1 2 3 4 5 6 7 8 9
1 PEKERJAAN PERSIAPAN
2 PEKERJAAN TANAH
3 PEKERJAAN PONDASI
4 PEKERJAAN PEMBETONAN
5 PEKERJAAN PASANGAN DINDING/PLESTERAN
6 PEK. KOSEN PINTU DAN JENDELA
7 PEK KAP DAN ATAP
8 PEKERJAAN LANTAI
9 PEKERJAAN PLAFOND
10 PEKERJAAN INSTALASI LISTRIK
11 PEKERJAAN PENGGANTUNG
12 PEKERJAAN PENGECATAN
13 PEKERJAAN SANITAIR DAN PLAMBING
14 PEKERJAAN LAIN-LAIN
GANTT CHART
Bulan 3 Bulan 4
2 3 4 1 2 3 4
10 11 12 13 14 15 16