_ fT aes
VERLITOAy VITORC
TABLE OF CONTENTS
Description
1, PETRON/STRUCTURAL STEEL WORKS by EEI
dal
12
13
14
Shapes 100-200 kg/m
Shapes Less than 100 kg/m
Painting Man-hours
Civil Work Estimate Quantity per Unit
2, EEI CORPORATION (SHOP FABRICATION GROUP)
3. D.C. FORTUNA (Civil Works)
4, ENGINEERING STANDARD MANHOUR by: Unknown
5, REVISED BLUE BOOK for CIVIL (DPWH)
(Revised — December 15, 2000)
54
52
53
5.4
55
56
5.7
58
5.9
SITE WORKS
CONCRETE WORKS
MASONRY
METALS
WOODS & PLASTICS
‘THERMAL & MOISTURE PROTECTION
DOORS & WINDOWS
FINISHES
ROADS & AIRPORT CONSTRUCTION
Location
21-27
28-39
40-43
44-50
50-54
54
54-55
55-57
57-58
58-61
61-69JETRON/STRUCTURAL STEEL WORKS
F\_SHAPES 100-200 KGS/M WEIGHT (ASSUME 50 % ARE BUILT-UP)
7 a's PESO PER KILOGRAM.
' 7
BUILT-UP |FABRICATION TOTAL
IBERWANENT WATERIALS SEE NOTE #1
| PAINT MATERIALS “SEE NOTE RT
I. GONSUMASLES: | NET OF VAT
i EWR 138 aa 30)
a ONES 0.82) 327 2.05)
COPPER SLAG (3 USAGE) = a] Ds4] a4]
SUNDRIES oa Bai os
[DIRECT LABOR COST 555] 27 Tas
4 -
il [FRINGE BENEFITS aia] a8] oei
fa (SUBSISTENCE 10] 35] Tas)
|
ul | OSTSTIES, a8 oe 30
HESTNG INSPECTION a oa oH
: ISUBCON PAINTING (NET OF VAT) a 1.27, 4.27)
NEAR WHITE BLAST WITH « COAT PRIMER
|
+ [FREIGHT OF MATERIALS FROM MANILA TO BTGAS. 053 253]
DELIVERY OF FINISHED PRODUCTS ‘SEE NOTE RS.
ud [OVERHEAD ANO INDIRECT COST
pee,
ABSENCE OF DRAWINGS AS OUR REFERENCE. ~
ree Sees ourona coor on be cHAROED
+ SALE Gelee nea «time nenvreenoe we sch 5%
Poe
C