Watersteam adjustment

After maintenance of APMA you have to check and adjust compensation for water
steam:

1. Change to Supervisor Modus 8/9 FACTORY CALIBRATION


2. Bypass mist catcher MC and catalyser CAT

PS
PS-1

F SV-2
FS P
SV-1
F-1
MC A-1
FS-1 OP-1 P-1

MC-1

CAT-1 F-2 BT-1

CAT F BT

3. Introduce zero gas and calibrate zero point


4. Bypass mist catcher MC, reinstall catalyser and insert bubbler at the outlet of
catalyser

PS
PS-1

F SV-2
FS P
SV-1
F-1
MC A-1
FS-1 OP-1 P-1

MC-1

CAT-1 F-2 BT-1

CAT F BT
BEFEUCHTER

5. If the measured value is stable, press AS key and the adjustment for water steam
will be done automatic
6. Exit Supervisor Modus and restore the original piping
7. Calibrate analyzer (zero and span)