You are on page 1of 98
‘= NATIONAL CAPITAL DISTRICT INTERIM COMMISSION SUBDIVISION CODE JANUARY 1985 PREPARED BY P.O, BOX i077 BOROKO CAMP SCOTT FURPHY PTY.LTD sie % : Sis CONTENTS 1. INTRODUCTION 2. GENERAL REQUIREMENTS & PROCEDURES 2.1 GENERAL 2.2 PHYSICAL INFRASTRUCTURE REQUIREMENTS 2.3 SUMMARY OF PROCEDURES FOR TSI. 2.4 PRELIMINARY ADVICE 2.5. CONGEPT APPROVAL 2.6 APPROVAL OF PLANS & SPECLFCATIONS 2.7 SUPERVISION & TESTING 2.8 FEES 2.9 STANDARD FORMS 2.10 FINANCIAL CONTRIBUTIONS 2.11 STANDARD DRAWINGS - 3. ROADS 3.1 GaNERAL 3.2 THE ROAD PATTERN 3.3. ROAD CLASSIFICATION 3-4 PUBLIC TRANSPORT . 3.5. FOOTPATHS if 3.6 PARKING 3.7 STREET LIGHTING 348 STREET SIGNS 3.9 ROAD CROSS SECTIONS 3.10 DRAINAGE 3.11 GEOMETRIC DESIGN CRITERIA 3.12 INTERSECTION DESLES 3.13 CUL-DE-sAcs 3.14 PAVEMENTS iN 3.15 KERBS & KERB AND CHANNEL DRAINAGE, al 4.2 43 44 43 4.6 47 4.8 4.9 4.10 wu 412 413 4s WATER Sel 5.2 5.3 5.4 5.5 5.6 347 5.8 5.9 5.10 Sell 5.12 5.13 5.14 5.15 5.16 GENERAL, MAJOR WATERCOURSES CHOICE OF PIPED OR OPEN DRAINS CALCULATION OF RUNOFF HYDRAULIC DESIGN CRITERIA CONNECTIONS TO INDIVIDUAL ALLOTMENTS LOCATION OF DRAINS PIPELINES CONCRETE LINED/STONE PITCHED DRAINS CULVERTS JUNCTION PITS SIDE ENTRY LTS HEADWALLS DRAIN CONSTRUCTION SUPPLY GaNRBAL WATER DEMAND’ & PRESSURE BASIS OF HYDRAULIC DESIGN ALIGNMENT & LOCATION OF MAINS PIPES PLPE FITTINGS RUBBER JOINTING RINGS STOP. VALVES HYDRANTS HOUSE CONNECTION SERVICES MAIN CONSTRUCTION TRSTING OF MAINS CONNECTION TO EXISTING MAINS STERLISING & FLUSHING OF MAINS THRUST BLOCKS DRAINAGE CUTOFFS

You might also like