PROCEDURES

1. All the details including topography and man-made features in and near the
stations had been observed and sketched.

2. The instrument was setup over the station 2.The pole with mini prism was put at
the back sight,station 1.

3. The temporary adjustment (leveling,centering) over the point was performed.

4. The height of instrument was measured using measuring tape and recorded.

5. The bearing for line 2-1 was set as the datum.The distance of stn2-stn1 was
measured and recorded.

6. A pole was used as a target over the point.The pole height was measured and the
reading was recorded.

7. The horizontal bearing,horizontal distance,and vertical distance for each


observation was recorded.

8. All the features surrounding the station were observed.We make sure the pole
height was measured and recorded for each observation.