You are on page 1of 26

CODIGO 1306CSH1B-6

f´c = 300 kg/cm2


HUMEDAD 5.00 % TANDA DE PRUEBA 0.04 M3
ABSORCIÓN 1.44 %
ARENA 1600.0 KG.

INSUMO DISEÑOS PESO SECO VOLUMENES PESOS CORREGIDOS PESO PRUEBA


CEMENTO (KG.) 385.00 385.00 0.1222 385.00 15.4
ARENA (KG.) 1600.00 1600.00 0.6135 1680.00 67.2
FILLER CALIZO (KG) 40.50 40.50 0.0149 40.50 1.6
RHEOBUILD 1000 (LT.) 4.60 5.52 0.0046 4.60 0.2
MASTER FIBER (KG.) 4.00 4.00 0.0044 4.00 0.2
MEYCO SA 160 (LT.) 23.20 33.41 0.0232 23.20 0.9
DELVO (LT.) 1.90 2.04 0.0019 1.90 0.1
AGUA (LT.) 212.20 212.20 0.2122 155.24 6.2
AIRE % 1.50% 1.50% 0.0150 0.00 0.0
1.0119
V1 0.398
Vabs 1.012
Varena 0.613 a/c 0.5139835488
Warena 1600.0
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO - MASTERFIBER CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-5
f´c = 300 kg/cm2
HUMEDAD 0.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00
ARENA (KG.) 1600.00 3200.00 4800.00 6400.00 8000.00 9600.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40
AGUA (LT.) 235.24 470.48 705.72 940.96 1176.20 1411.44
7 8
2695.00 3080.00
11200.00 12800.00
283.50 324.00
32.20 36.80
28.00 32.00
162.40 185.60
13.30 15.20
1646.68 1881.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 2.5 %
ABSORCIÓN 1.8 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1640.00 3280.00 4920.00 6560.00 8200.00 9840.00 11480.00 13120.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 200.36 400.72 601.08 801.44 1001.80 1202.16 1402.52 1602.88
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 3.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1648.00 3296.00 4944.00 6592.00 8240.00 9888.00 11536.00 13184.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 187.24 374.48 561.72 748.96 936.20 1123.44 1310.68 1497.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 3.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1656.00 3312.00 4968.00 6624.00 8280.00 9936.00 11592.00 13248.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 179.24 358.48 537.72 716.96 896.20 1075.44 1254.68 1433.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 4.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1664.00 3328.00 4992.00 6656.00 8320.00 9984.00 11648.00 13312.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 171.24 342.48 513.72 684.96 856.20 1027.44 1198.68 1369.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 4.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1672.00 3344.00 5016.00 6688.00 8360.00 10032.00 11704.00 13376.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 163.24 326.48 489.72 652.96 816.20 979.44 1142.68 1305.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 5.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1680.00 3360.00 5040.00 6720.00 8400.00 10080.00 11760.00 13440.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 155.24 310.48 465.72 620.96 776.20 931.44 1086.68 1241.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 5.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1688.00 3376.00 5064.00 6752.00 8440.00 10128.00 11816.00 13504.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 147.24 294.48 441.72 588.96 736.20 883.44 1030.68 1177.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 6.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1696.00 3392.00 5088.00 6784.00 8480.00 10176.00 11872.00 13568.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 139.24 278.48 417.72 556.96 696.20 835.44 974.68 1113.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 6.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1704.00 3408.00 5112.00 6816.00 8520.00 10224.00 11928.00 13632.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 131.24 262.48 393.72 524.96 656.20 787.44 918.68 1049.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 7.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1712.00 3424.00 5136.00 6848.00 8560.00 10272.00 11984.00 13696.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 123.24 246.48 369.72 492.96 616.20 739.44 862.68 985.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 7.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1720.00 3440.00 5160.00 6880.00 8600.00 10320.00 12040.00 13760.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 115.24 230.48 345.72 460.96 576.20 691.44 806.68 921.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 8.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1728.00 3456.00 5184.00 6912.00 8640.00 10368.00 12096.00 13824.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 107.24 214.48 321.72 428.96 536.20 643.44 750.68 857.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 8.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1736.00 3472.00 5208.00 6944.00 8680.00 10416.00 12152.00 13888.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 99.24 198.48 297.72 396.96 496.20 595.44 694.68 793.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 9.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1744.00 3488.00 5232.00 6976.00 8720.00 10464.00 12208.00 13952.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 91.24 182.48 273.72 364.96 456.20 547.44 638.68 729.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 9.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1752.00 3504.00 5256.00 7008.00 8760.00 10512.00 12264.00 14016.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 83.24 166.48 249.72 332.96 416.20 499.44 582.68 665.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 10.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1760.00 3520.00 5280.00 7040.00 8800.00 10560.00 12320.00 14080.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 75.24 150.48 225.72 300.96 376.20 451.44 526.68 601.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 10.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1768.00 3536.00 5304.00 7072.00 8840.00 10608.00 12376.00 14144.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 67.24 134.48 201.72 268.96 336.20 403.44 470.68 537.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 11.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1776.00 3552.00 5328.00 7104.00 8880.00 10656.00 12432.00 14208.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 59.24 118.48 177.72 236.96 296.20 355.44 414.68 473.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 11.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1784.00 3568.00 5352.00 7136.00 8920.00 10704.00 12488.00 14272.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 51.24 102.48 153.72 204.96 256.20 307.44 358.68 409.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 12.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1792.00 3584.00 5376.00 7168.00 8960.00 10752.00 12544.00 14336.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 43.24 86.48 129.72 172.96 216.20 259.44 302.68 345.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 12.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1800.00 3600.00 5400.00 7200.00 9000.00 10800.00 12600.00 14400.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 35.24 70.48 105.72 140.96 176.20 211.44 246.68 281.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 13.0 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1808.00 3616.00 5424.00 7232.00 9040.00 10848.00 12656.00 14464.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 27.24 54.48 81.72 108.96 136.20 163.44 190.68 217.92
PLANTA COBRIZA
DISEÑO DE SHOTCRETE CON FILLER CALIZO – FIBRA ENDURO CORREGIDO POR HUMEDAD
CODIGO 1306CSH1B-6
f´c = 306 kg/cm2
HUMEDAD 13.5 %
ABSORCIÓN 1.4 %
ARENA 1600.0 KG.

M3
INSUMO 1 2 3 4 5 6 7 8
CEMENTO (KG.) 385.00 770.00 1155.00 1540.00 1925.00 2310.00 2695.00 3080.00
ARENA (KG.) 1816.00 3632.00 5448.00 7264.00 9080.00 10896.00 12712.00 14528.00
FILLER CALIZO 40.50 81.00 121.50 162.00 202.50 243.00 283.50 324.00
RHEOBUILD 1000 (LT.) 4.60 9.20 13.80 18.40 23.00 27.60 32.20 36.80
FIBRA ENDURO (KG.) 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00
MEYCO SA 160 (LT.) 23.20 46.40 69.60 92.80 116.00 139.20 162.40 185.60
DELVO (LT.) 1.90 3.80 5.70 7.60 9.50 11.40 13.30 15.20
AGUA (LT.) 19.24 38.48 57.72 76.96 96.20 115.44 134.68 153.92