1 5th-Dec-2011
MINUTES OF THE MEETING OF ZONAL COMMITTEE(ZONE"A"PLAINS) FOR SCHEDULE OF
RATES-2010 HELD ON 05-12-11 AT 11.00 AM IN PWD REST HOUSE AT PATIALA.
A meeting of the zonal commitiee Zone’ 12-11 in PWD
Rest House at Patiala under the Chairmanship of Superintending Engineer-cum-convener zonal commitee for zone
A, Construction Circle, PWD B&R Br,, Sangrur to Review the rates” fix the ceiling premium on C.S.R -2010
." for Plains for common Schedule of rates was held on
The following memebers were present in the meeting:
Er. Arvinder Singh Er. SPS. Samra
Superintending Engineer., Superintending Engineer,
Const. Circle, Punjab, PWD B&R, ‘Const. Circle No.1, PWD B&R Br.,
‘Chandigarh. (Member) Patiala (Member)
Er. TS. Chahal Er. Ajmer Singh
Superintending Engineer, Superintending Engineer,
Const. Circle, Punjab, PWD B&R Br. Central Works Circle, PWD B&R Br.,
Bathinda, . (Member) ‘Amuitsar (Member)
Er. G.K. Gupta Er, P.S Bhatti,
Superintending Engineer, Superintending Engineer,
WIS. & Sanitation Circle, WSS. & Sanitation Circle,
Amritsar(Member) Patiala(Member)
Er. NS Pandori Er-Rajinder Singh
Superintending Engineer, Superintending Engineer,
WIS. & Sanitation Circle, Deptt, of Irrigation (Drainage Circle)
Bathinda(Member) Gidderbaha (Member)
Er.V.K. Chopra Er. Prem Chand
Superintending Engineer, ‘Superintending Engineer,
Electrical Circle, Punjab, PWD B&R Br., Deptt. of Irrigation (Drainage Circle)
Patiala. (Member) Ferozepur. (Member)
Er. RK Chaudhary Er. HS. Sandhu
Superintending Engineer, Superintending Engineer,
Deptt. of Irrigation (U.B.D.C.) Deptt, of Irrigation, Patiala. . (Member)
Amritsar,(Member)
Er. Bhagwant Singh Warar Er-V.S. Dhindsa,
Superintending Engineer, Superintending Engineer,
Deptt. of Inigation (Linning) Const. Circle, PWD B&R Br.,
Bathinda (Member) Sangrur (Convener)
The committee reviewed the rates of C.S.R-2010. All the present members felt that the rates of CS.R-
2010 are not workable. Most of the tenders received in the various departments too much higher then the C.S.R.
rates. Rates for various quarry material, bricks, steel, cement recommended by the Sub Committee formed by the
Zonal Committee were discussed in detail. The rates recommended by the Sub Committee was approved
Unanimously. Other aspects in steep rise in prices due to rise in labour rates, rise in rates of POL and other
construction material were also discussed. Afier detailed discussion and deliberations, committee decided to fixe
the ceiling premium on various chapters of C.S.R.-2010 for Zone-A (plains) as under.
‘These shall be deemed to have taken effect from the next day of the date of issue.
Cont.
45th-Dec-2011
The ceiling premium on through rates are based on the following basic rates of material ai source
VAT but excluding contractor's profit and labi
ces.
nding
1_ [Mild Steel (Bars of all sizes) RS43,000 00 per MT
2 [Tor Steel (all sizes) TMT (all sizes Fea15) 543,000.00] per MIT
3__ [Tor Steel (all sizes) TMT all sizes Fe 500) RSa4,000.00] per MT.
4 [Tor Steel (all sizes) PMT (all sizes Fe 550) RS.45,000.00|per MT
3__ [Structural Steel RS.45,000.00]per MT.
6 [Cement including cost of bags RS.295,00[per Bag
7__[Bitumen 25/85 grading for building works 5.56,870.00]per MT
8 [Bricks frst class at kiln site (Average rate ofall dist) RSA.A18.18]per 1000 nos.
9 [Bricks Tiles first class at kiln site (Average rate ofall dist) RSa,SR1_82[per 1000 nos.
Average rate of all the quarries material
10_[Crished Bajt 3.2mm RS425.77]per cum
T_[Grshed Bajri 12mm RS391.03|per cum
12 [Water bom Bajri 13.2 mm 5.33636 [per cum
T3_[Water bom Baja 11.2 mm RS341 71 per cum
14_|Water born Bajri 6 mi RS303.73|per cum
15__|Stone metal 90-45 mm RS334.57|per cum
16 _|Stone metal 40-63 mm RS350.60]per cum
17_|Stone metal 224-55 mm RS 369.44[per cum
18_ [Stone metal 25 mm RS3347 [per cum
‘Stone metal 40 mm RS.325.10[per cum
[Stone boulders 3.6 kg-18 kg RS277.81 [per cum
[Stone boulders 18 ky-40 ke Rs344.31 [per cum
[Stone boulders above 40 ke RS304.57|per cam
23_ [Gravel 75-25 mm RS251.78)per cum
M4 [GSBGI& GA RS.221.53 [per cam
25__ [Course sand Rs.198.20[per cam
Note 1: Average rates have been taken for quarry material in CSR . However rates from the quarry having
Icheapest landed rates at particalar location shall apply and the rat
lgiving a (+) or (-) loading to the average rates for the respective ite
lare attached at annexure-L
fs shall be correspondingly adjusted by
sms. Rates of material at various quaries
[Note 2:
district
‘Average rates have been taken for Brick/Bricks tiles in CS
shall apply and the rates shall be correspondingly adjusted
laverage rates for the respective items. Various distt rates of Bricks
RR. However rates for the respective
by giving a (+) or (-) loading to the
& Tiles are attached at annexure-I
[Basic Rate of bitumen at Panipat refinery excluding all taxes
T_[VG-10 (BULK) RS36.270 00 [per MT.
2 [VG (PACK) RS.39,370.00|per NT.
3_[V6-30 (BULK) RS37,070.00]per M.T.
4__[CRMB-50 (BULK) RS36,670.00| per MT.
3_|CRMB-50 (PACK) RS.39,920.00}per MT.
@_|CRMB-55 (BULK) RS36,860.00]per MOT.
7_ |ERMB-55 (PACK) Rs0,110.00|per MoT
3_ |CRMB-60 (BULK) Rs.36,740.00|per MT
‘9 [ERMB-60 (PACK) RS.39,990.00] per MT
10_JEMULSION-RAPID (BULK) RS25,810.00]per M.T
T1_JEMULSION-RAPID (PACK) RS.29,660.00|per NaI
12 [EMULSION-MEDIU (BULK) RS26,010.00]per MT
13_[EMULSION-MEDIU (PACK) Rs.29,860,00|per MOT.
14_|EMULSION-SLOW (BULK), Rs.26,010.00}per MET.
15_ [EMUTSION-SLOW (PACK) Rs.29,860.00]per MT
Cont.......3Sth-Dec-2011
Sr.No
(Chapter No.
Premium on
Labour Rate above!
CSR
CSR
Premium on
‘Through Rate above)
[CHAPTER NO. 1 DAILY WAGES:
As per
note: ii of C.S.R-2010 " The Payment ¢o the labour on daily
wages will be paid as per rate fixed by
the Labour Department as_per Minimum Wages Act from time to time.
[C.S.RChpater No. (HIRE CHARGES OF MACHINERY)
Allitems
We
[Chapter No.3 (MATERIALS)
[basic ai
[No premium has been fixed o1
alysis purpose,
"ms on this chapter except item No.3.
3.12(d) as this
Item No. 3.10,
tem No. 3.1200)
(Chapter No. 4(LOADING & UNLOADING)
[All items except Item No. 4.1 A, 42 13%
tem No.4. A 42 13%
[Chapter No. 5 (CARRIAGE)
[AI items Upto 40 Km 15%
[a1 Km. to 60 Km 10%
[61 Km. to 150 Km 8%
151 Km, and above 3%
[Chapter No. (EARTH WORK)
[All items except Item No. 6.19,6.20 & 6.22
12%
hem No. 6.19,6.20 & 6.22
O%
‘Chapter No. (ROCK CUTTING)
[The ceil
ling premium fixed by the Zonal Committee for Zone-B will
ibe applicable for Zone-A also
‘Chapter No. (DEMOLITION)
All items
13%
0%.
[Chapter No.0(CENTERING SHUTTERING),
All itenis
[Chapter No.10(CONCRETE),
[Ail items except item No. 10.26,10.31,10.52,10.33 to 10.30
10.46,10.47,10.48 to 10.55,10.59, 10.66 to 10.68,10.70 10
10.73.
18%
hem No. 10.26
O%
15%
rem No, 10.31 &10.32
12%
35
Trem No.10.33 to 10.39, 10.46,10.47,10.48 to 10.35,10.59,
10.66 to 10.68.10.70 to 10.73,
12%
(Chapter No. 11(BRICK WORK)
All items items except item No. 11.29 to 11.33
12%
35%
em No. 11,29 to 1133
[Chapter No.12 (STONE MASONRY)
[The ceiling premium fixed by the Zonal Committee for Zone-B will be applicable for Zone-A also.
Cont.