Stage 10 —Install The 6-5/16" Type LTWC
Tris sometimes necessary to olate the Blowout Perverer oe
Stack or the Frac Tree fom presi inthe production 8-5/16) L TwC
casing. The Type 1 2-Way Back Presuire Valve (TW)
is designed to bock the pressure coming upeteam from _—Mondrel
the well bore during the removal of the BOP and subse-
quent installation of the Tubing Head and Free Tree
“Master Valvesnd aksoallows fr the subsequent resting of
the valveltubing Read connection, ‘The following depicts
the instalation of the valve using @ standard dry 104,
_—2" BUN
Thread
_—Poppe'
|. Examine the 6-516" Type 'L' TWG Bach Pres-
sure Valve Assembly (Item ST 10). Verity the
felling
+ poppet is installed and moves freely insert
‘body seas are in place and in goed condition
+ latch pin moves feely ip and our agains spring
pressure
valve isin run position with mandrel extended
al threads are clean and in good eoneition
+ mandrel rotates freely
Tocking dogsare fullyretacted below valvebody
oD.
acking Dog
aia un
sliding Acme Tareod
Late!
Running Tool,
7” Nominal
|
|
|
[Seen rive Pir
RPIO1456
2. Examine the Stiding Sleeve Running Tool (Item STIY). Verity the
foiling:
+ threaded sliding sleeve i free te move tool shaft
retiner nut i in place and secured with roll pin
+ dive pin i in place, centered, and retained wih 1/2" se screw
RPO93833, + BIRT set screw i in place
ConocoPhillip:
Wood Group ser nei 710M S95
Pressure Control Wellhead Assembly With T Tubing HeadStage 10 —Install The 6-5/16" Type LTWC
ee 7 eee
| B= | Receiver Ie
i S || Coupling ~~
| euwing_toot—~—“Zogs J | set sere ON
Body rive Pin | | : i 3
a Sheor Pin
‘Slicing Sieeve —~ & ay Monee] esng sieeve BF Running Too|
Poppet
(Bocx Seat)
Valve in Run
Pisition
(Bock Seat)
Poppet
Volve la Run
Pisition
RPIO1468
2. Lightly ubricate the mating threads of
the running toaland TWC: with light
oil
Dey Roa.
3. Carefully thread the running toot into
the TWC with elocksse rotation ap
proximately two tame 7° 595 Pockott
andthencontinuerotatingthetoolclck-
wise until the drive pin contacts the top
ofthe TWC mandrel, Backef 1/2 tun,
5. Assemble the dry rod if required and
suspend above well bore with air hoist
line,
|
|
4 Plekuponthetaltbelenghottestide |
|
|
6, Remove the 38st screw from theend
‘ofthe running tool.
7. Carefully lower the dry receiver cou-
pling over the end ofthe ool
8. Align the mating holes ofthe coupling
‘and woland then slide theshearpin oto
the hole and secure with set screw,
“Tighten so screw securely
9. Calculate the dance from the ap of
7 598 BH Guide
117 5\¢ BOP Stock
PY Running Too!
417 5M Dring
‘Avopter
Ifa_ 505 cosing Heoe
‘the diilling adapter to the rig oor and
dé 28.31". Tre distance othelocating
shoulder in the 7* casing hanger.
RP1Ot489
ConocoPhillips
1699-518" x7" 10M S95
Wellhead Assembly With T Tubing Head
Wood Group
Pressure ControlStage 10 —Install The 6-5/16" Type LTWC.
10, Measure up the dry od 5 Feetfrom the
load shoulder ofthe TWC and place a Dry Ros
spark on the rod
595 Sit Gulce
[=
a 5M BOP Stack
HPV Running Toot
1, Carefully lower the valve into the well
bore, tallyingtherodewery fie feetuntil
you reach the eaculated dimension,
598 Pockott
12, Place mark on the rod at that dimes
sionandihecontinvebweringueTWC
tnt it ands on the stop shoulderand |
the paint marcalgns withthe rg lor.
‘Slack off ll weight.
13, Rotate therodclockwiseuni the drive {
pin drops into its mating notch inthe 7 type - SoH
{op of the valve mandrel, Rod should 7 Tes LEM
‘top approximately Si |
137 BM Driling
Adapter
14, With he fall weightof the 1od down on
he TWG, olae the rod clackise 102
postive stop. This indiestes thar the
latch pin has engaged! its mating slot in
the hanger bore.
15. Rotate the rod counter chckvite ap- 7 $05 Mo
proximately 1Stums. The orqueshould
start to build and mark on the rod Hl
should dropan additional 382"andthe 1
Joeking dogs wil be fully engaged
Poppet (Bock Seat) —~
Locking Dogs
(Engages)
“~Loteh Pin
16. Continue rotating therod counter clock- sae
‘oe and tree to approximates 500 T
tes | I ai01a70
17, Pick up on the rod approsimately 5/8" to 34 and
‘ontinue rotating the rod counter clockwise appro: >
mately 12 cums or unt the wol comes fee oF the
valve
‘Note: Stisht upward pulls required while Une tools being
removed from the wale,
"395 Pockoft
18, Retieve the tool tothe rig oor and lay down red.
19, Rigupandremove theS95 Bit GuideperStage9and
then nipple downand remove BOP stackaned drilinee
adapeer.
Type L TW
20, Pace ah cg ec te mp of te 7695
Poet mctien ears
TaCnes oetownalerwnsss
WARNING? Ifthe measurement isles then 12.6" the
‘TWC isnot fllyengaged, Reinstall the running coolwith
‘up joint and increase torque until proper measurement
is auained,
895 Mondrel
Casing Hanger
RP102027
Wood Group csi 7" OM S95
Pressure Control Wellhead Assembly With T Tubing Head