You are on page 1of 3
Stage 10 —Install The 6-5/16" Type LTWC Tris sometimes necessary to olate the Blowout Perverer oe Stack or the Frac Tree fom presi inthe production 8-5/16) L TwC casing. The Type 1 2-Way Back Presuire Valve (TW) is designed to bock the pressure coming upeteam from _—Mondrel the well bore during the removal of the BOP and subse- quent installation of the Tubing Head and Free Tree “Master Valvesnd aksoallows fr the subsequent resting of the valveltubing Read connection, ‘The following depicts the instalation of the valve using @ standard dry 104, _—2" BUN Thread _—Poppe' |. Examine the 6-516" Type 'L' TWG Bach Pres- sure Valve Assembly (Item ST 10). Verity the felling + poppet is installed and moves freely insert ‘body seas are in place and in goed condition + latch pin moves feely ip and our agains spring pressure valve isin run position with mandrel extended al threads are clean and in good eoneition + mandrel rotates freely Tocking dogsare fullyretacted below valvebody oD. acking Dog aia un sliding Acme Tareod Late! Running Tool, 7” Nominal | | | [Seen rive Pir RPIO1456 2. Examine the Stiding Sleeve Running Tool (Item STIY). Verity the foiling: + threaded sliding sleeve i free te move tool shaft retiner nut i in place and secured with roll pin + dive pin i in place, centered, and retained wih 1/2" se screw RPO93833, + BIRT set screw i in place ConocoPhillip: Wood Group ser nei 710M S95 Pressure Control Wellhead Assembly With T Tubing Head Stage 10 —Install The 6-5/16" Type LTWC ee 7 eee | B= | Receiver Ie i S || Coupling ~~ | euwing_toot—~—“Zogs J | set sere ON Body rive Pin | | : i 3 a Sheor Pin ‘Slicing Sieeve —~ & ay Monee] esng sieeve BF Running Too| Poppet (Bocx Seat) Valve in Run Pisition (Bock Seat) Poppet Volve la Run Pisition RPIO1468 2. Lightly ubricate the mating threads of the running toaland TWC: with light oil Dey Roa. 3. Carefully thread the running toot into the TWC with elocksse rotation ap proximately two tame 7° 595 Pockott andthencontinuerotatingthetoolclck- wise until the drive pin contacts the top ofthe TWC mandrel, Backef 1/2 tun, 5. Assemble the dry rod if required and suspend above well bore with air hoist line, | | 4 Plekuponthetaltbelenghottestide | | | 6, Remove the 38st screw from theend ‘ofthe running tool. 7. Carefully lower the dry receiver cou- pling over the end ofthe ool 8. Align the mating holes ofthe coupling ‘and woland then slide theshearpin oto the hole and secure with set screw, “Tighten so screw securely 9. Calculate the dance from the ap of 7 598 BH Guide 117 5\¢ BOP Stock PY Running Too! 417 5M Dring ‘Avopter Ifa_ 505 cosing Heoe ‘the diilling adapter to the rig oor and dé 28.31". Tre distance othelocating shoulder in the 7* casing hanger. RP1Ot489 ConocoPhillips 1699-518" x7" 10M S95 Wellhead Assembly With T Tubing Head Wood Group Pressure Control Stage 10 —Install The 6-5/16" Type LTWC. 10, Measure up the dry od 5 Feetfrom the load shoulder ofthe TWC and place a Dry Ros spark on the rod 595 Sit Gulce [= a 5M BOP Stack HPV Running Toot 1, Carefully lower the valve into the well bore, tallyingtherodewery fie feetuntil you reach the eaculated dimension, 598 Pockott 12, Place mark on the rod at that dimes sionandihecontinvebweringueTWC tnt it ands on the stop shoulderand | the paint marcalgns withthe rg lor. ‘Slack off ll weight. 13, Rotate therodclockwiseuni the drive { pin drops into its mating notch inthe 7 type - SoH {op of the valve mandrel, Rod should 7 Tes LEM ‘top approximately Si | 137 BM Driling Adapter 14, With he fall weightof the 1od down on he TWG, olae the rod clackise 102 postive stop. This indiestes thar the latch pin has engaged! its mating slot in the hanger bore. 15. Rotate the rod counter chckvite ap- 7 $05 Mo proximately 1Stums. The orqueshould start to build and mark on the rod Hl should dropan additional 382"andthe 1 Joeking dogs wil be fully engaged Poppet (Bock Seat) —~ Locking Dogs (Engages) “~Loteh Pin 16. Continue rotating therod counter clock- sae ‘oe and tree to approximates 500 T tes | I ai01a70 17, Pick up on the rod approsimately 5/8" to 34 and ‘ontinue rotating the rod counter clockwise appro: > mately 12 cums or unt the wol comes fee oF the valve ‘Note: Stisht upward pulls required while Une tools being removed from the wale, "395 Pockoft 18, Retieve the tool tothe rig oor and lay down red. 19, Rigupandremove theS95 Bit GuideperStage9and then nipple downand remove BOP stackaned drilinee adapeer. Type L TW 20, Pace ah cg ec te mp of te 7695 Poet mctien ears TaCnes oetownalerwnsss WARNING? Ifthe measurement isles then 12.6" the ‘TWC isnot fllyengaged, Reinstall the running coolwith ‘up joint and increase torque until proper measurement is auained, 895 Mondrel Casing Hanger RP102027 Wood Group csi 7" OM S95 Pressure Control Wellhead Assembly With T Tubing Head

You might also like