You are on page 1of 2

MAGRAV POWER Power Factor

Corrector Device

HOW TO CONNECT TO THE GRID AND LOAD


(+)
1
(-)
Electrical
Electric Outlet
Grid MP
House KWH
Meter (Single
Phase)
Live Neutral
(L) (+) (N)(-)
Breakers
IN OUT Appliances
(Max Total
Load 2.0Kw)

Phase 1: Conditioning of the MPU for 21 days refer to Users Manual


MAGRAV POWER Power Factor
Corrector Device

HOW TO CONNECT TO THE GRID AND LOAD


(+)
2
(-) Electrical Outlet

Electric Appliances
Grid MP (Max Total
Load 500w)
House KWH
Meter (Single
Phase)
Live Neutral
(L) (+) (N)(-)
Breakers
IN OUT
Appliances
(Max Total
Load 2Kw)

Phase 2: After the 21 days of Conditioning, set your system this way.

You might also like