You are on page 1of 4

PEMASUKAN

KOLEKTIF :
Industri : 1.360.000

Mesin : 1.691.000

Arsitek : 1.813.000

Sipil : 1.450.000

Elektro : 1.160.000

Pernik : 2.000.000

Band regist : 400.000

TOTAL PEMASUKAN : 9.874.000

BAJU :
Panitia : pendek @65.000 panjang @70.000

Industri 3 pendek = 195.000

7 panjang = 490.000

= 685.000 (10 pcs)

Mesin 9 pendek = 585.000 (9 pcs)

Arsitek 6 pendek = 390.000 (6 pcs)

Sipil 1 panjang = 70.000

6 pendek = 390.000

= 460.000 (7 pcs)

Elektro 1 panjang = 70.000

10 pendek = 700.000

= 770.000 (11 pcs)

TOTAL PEMASUKAN : 2.890.000

Luar Panitia : pendek @75.000 panjang @80.000

Industri 15 pendek = 1.125.000 (15 pcs)


Mesin 2 pendek = 180.000 (2 pcs)

Sipil 9 pendek = 675.000 (9 pcs)

TOTAL PEMASUKAN : 1.980.000

TOTAL PEMASUKAN BAJU KESELURUHAN : 2.890.000 + 1.980.000 = 4.870.000


PENGELUARAN

MUSIK :
Banner = 260.000

MC = 300.000

Print proposal = 334.000

HT = 300.000 (6 pcs)

Alat band = 6.500.000

DP GS = 200.000

Smile morning = 500.000

Tuan13 = 1.000.000

Starlit = 500.000

TOTAL PENGELUARAN = 9.894.000

BAJU :
Pendek @50.000 (57 pcs) = 2.850.000

Panjang @55.000 (9 pcs) = 495.000

TOTAL PENGELUARAN = 3.345.000


REKAPAN

TOTAL PEMASUKAN MUSIK = 9.874.000


TOTAL PENGELUARAN MUSIK = 9.894.000
= -20.000

TOTAL PEMASUKAN BAJU = 4.870.000


TOTAL PENGELUARAN BAJU = 3.345.000
= 1.525.000
BELUM BAYAR BAJU, arsitek = 325.000 (5 pcs) @65.000
Mesin = 195.000 (3 pcs) @65.000
TOTAL = 520.000
TOTAL KESELURUAN SISA DANA BAJU = 1.525.000 – 520.000
= 1.005.000

JADI, DANA SURPLUS BAJU DIALOKASIKAN UNTUK MENUTUP KEKURANGAN MUSIK


SEBESAR 20.000. MAKA SISA DANA PERNIK SEBESAR :
1.005.000 – 20.000 = 985.000

PADA HARI H, PANITIA KEHILANGAN BAJU (LUAR PANITIA) SEBANYAK (3 PCS) PENDEK
@75.000 = 225.000, DAN UANG DIKEMBALIKAN KEPADA YANG MEMESAN.

JADI, TOTAL KESELURUHAN REKAPAN DANA PERNIK SEBESAR :

985.000 – 225.000 = 760.000

You might also like