This document calculates the cement rise behind a 9 5/8" casing with an inside diameter of 8.681 inches in a well with a hole size of 12.25 inches. It details that 150 barrels of cement were pumped, with a shoe track length of 24 meters and annular capacity of 0.056 barrels per meter. Based on these details, it determines that the top of cement is 1381.9 meters behind the 9 5/8" casing.
This document calculates the cement rise behind a 9 5/8" casing with an inside diameter of 8.681 inches in a well with a hole size of 12.25 inches. It details that 150 barrels of cement were pumped, with a shoe track length of 24 meters and annular capacity of 0.056 barrels per meter. Based on these details, it determines that the top of cement is 1381.9 meters behind the 9 5/8" casing.
This document calculates the cement rise behind a 9 5/8" casing with an inside diameter of 8.681 inches in a well with a hole size of 12.25 inches. It details that 150 barrels of cement were pumped, with a shoe track length of 24 meters and annular capacity of 0.056 barrels per meter. Based on these details, it determines that the top of cement is 1381.9 meters behind the 9 5/8" casing.