You are on page 1of 1

THAI JURONG ENGINEERING LIMITED CAR-MCS-TJEL-013

MAE MOH POWER PLANT 4-7 REPLACEMENT PROJECT


ROOT CAUSE ANALYSIS FISHBONE DIAGRAM 14-Jan-17

ENVIRONMENT MANAGEMENT

ACCELERATE ERECTION ACTIVITY

BAD WHEATHER CONDITION TO ACHIEVE ERECTION


(CONTINOUS RAINING) SCHEDULE

EFFECT= SAND, IRON POWER,


OTHER FOREIGN MATERIAL
ROOT CAUSE STAINED WERE ACCUMULATED.
IMMEDIATE CAUSE
NO INTERNAL INSPECTION
MANUAL CLEANING

NO MENTIONED INSPECTION
TEST PLAN

METHOD OF
INSPECTION
CLEANING