You are on page 1of 1

EFFICIENT AND SUSTAINABLE WATER SUPPPLY DISTRIBUTION SYSTEM PROJECT IN PAJO,

PITALO, SAN FERNANDO, CEBU.

OVER THE PAST YEARS, METRO CEBU HAS BEEN CONTRIBUTING MUCH TOWARDS GROWTH AND
INDUSTRALIZATION TO VISAYAS’ INDUSTRIAL OUTPUT ESPECIALLY ABOUT THE QUALITY OF WATER SYSTEM.
HOWEVER, VARIOUS SECTORS HAVE CONCERNS ABOUT SOME SERVICES IN POOR ZONES.

CRISTINA C. DAVID, FRANCISCO M. LARGO, ARLENE INOCENCIO, ED L. WANG (1998). Only 23 percent of the total
households and a very small portion of industrial and commercial sectors are serviced by the Metro Cebu
Water District. Hence, the large majority of households, industrial and commercial firms have to rely on
private wells and private water vendors.

A LOT OF URBAN POOR ZONES THROUGH OUT THE PROVINCE OF CEBU IS IN AGONY OF HAVING A POOR WATER
SUPPLY SYSTEM IN THE FACE OF HIGH TECHNOLOGY ERA. MOSTLY, THEY REMAIN WIELDING OF DEEP WELL,
SPRING WATER, RIVERS AND OTHER BASIC SOURCES WATER SUPPLY OF THIS CONTINUING OF IMPROPER
APPLICATION OF OUR WATER RESOURCES HAS CAUSED UNSATISFACTORY AND DEFICIENCY IMPACT IN THE
COMMUNITY SPECIFICALLY IN PAJO, PITALO, SAN FERNANDO, CEBU. SUCH AS:

1. PRESENCE OF WATER CONTAMINANTS IN THE SYSTEM AS A RESULT OF IMPROPER SANITATION.

2. INSUFFICIENT WATER DISTRIBUTION DUE TO INADEQUATE AND UNSTUDIED SITE WHICH COULD BE
FEASIBLE FOR A WIDE WATER SUPPLY.

3. UNENDURABILITY OF THE SYSTEM THAT MIGHT RESULT INTO A GREATER COMPLICATION.

You might also like