RPS, Kontrak Dan Penjelasan Enterpreneurship
RPS, Kontrak Dan Penjelasan Enterpreneurship
I Man Power
1. Executive director 1 Bulan
2. Project Manager 1 Bulan
3 Public Relations and Events Manager 1 Bulan
4 Finance 1 Bulan
5 Contruction Engineers 3 Bulan
6 Mechanical Engineers 3 Bulan
7 Electrical Engineers 3 Bulan
8 Helper 10 Bulan
J
II Pengadaan Barang
1. Turbin Angin SG 1.5-122 30 unit
2. Smart Container Inverter 400 V 1 unit
3. Intensium® Max, the megawatt energy storage system (baterai) 1 unit
4. Trafo 2000 KVa 1 unit
5. Kabel N2XSY 1000 m
6 ePowerControl MC-M 1 unit
J
III Akomodasi
1. Akomodasi Pengadaan Barang 1
2. Akomodasi Survey
3. Akomodasi Kontraktor 59
4. Pengrususan Dokumen
Jumlah
Total Anggaran
LL OF MATERIAL
BAYU (PLTB) PANTAI MANGGAR
30,000,000.00 30,000,000.00
35,000,000.00 35,000,000.00
6,000,000.00 6,000,000.00
10,000,000.00 10,000,000.00
90,000,000.00 90,000,000.00
90,000,000.00 90,000,000.00
90,000,000.00 90,000,000.00
25,000,000.00 25,000,000.00
JUMLAH 346,000,000.00
100,000,000.00 3,000,000,000.00
150,000,000.00 150,000,000.00
200,000,000.00 200,000,000.00
125,000,000.00 125,000,000.00
250,000.00 250,000,000.00
300,000,000.00 300,000,000.00
JUMLAH 4,025,000,000.00
15,000,000.00 15,000,000.00
10,000,000.00 10,000,000.00
5,000,000.00 5,000,000.00
8,000,000.00 8,000,000.00
38,000,000.00
4,409,000,000.00