2. METRADO DE CARGAS
Wu2
Wu1
2.125 m 2.525 m
X RB
Wu1 TRAMO DESCANSO
Carga Muerta Carga Viva
P.P = 576.00 Kg/m S/C = 720.00 Kg/m
Acabados = 120.00 Kg/m
696.00 Kg/m 720.00 Kg/m
WD1 = 835.20 Kg/m WL1 = 1152.00 Kg/m Wu1 = 1987.20 Kg/m
3. CALCULO DE MOMENTO
RB = 5334.44 Kg
4. DISEÑO EN ACERO
Para Momento Positivo: 4.79 T-m
Asumiendo varilla de acero: Ф= 1/2
b= 120.00 cm As = 1.27 cm²
d= 17.37 cm
a= 1.50 cm USAR = 7 Ф 1/2 @ 19.5
As (+) = 7.63 cm² Ok!
As (+) = 7.63 cm²
S= 19.50 cm
# Varillas = 7
As min = 3.75 cm²
Para As de Temperatura:
As temp = 3.60 cm²
As temp = 1.80 cm² Dos capas
Asumiendo varilla de acero: Ф= 3/8
S= 39.50 cm As = 0.71 cm²
S max = 100.00 cm
S max = 45.00 cm USAR = Ф 3/8 @ 39.5
S= 39.50 cm