You are on page 1of 6

No Item Pekerjaan Satuan Volume Panjang Lebar Tinggi Jumlah

1 Pembersihan Lokasi M2 1210 44.3 27.3


2 Lantai Lap. FutsalKk-150 M3 121 44.3 27.3 0.1
- Semen Zak 905
- Pasir M3 70
- Kerikil M3 69
3 Kolom 20 x 20 M3 11.28 6 0.2 0.2 47
- Semen Zak 85
- Pasir M3 7
- Keriil M3 7
- Besi Ø8 Ljr 96 6.1 188
a Bekisting M2 225.6 6 0.2 0.2 47
- Kayu Kelas III M3 4.512
- Paku kg 45.12
- Plywood lbr 39.48
- Kayu Dolken Batang 225.6
4 Dinding +1 meter, 1:4 M2 131.55 131.55 1
- Semen Zak 88
- Pasir M3 0.008738679
- Bata Merah 5x11x22 bh 18417
5 Plesteran M2 404.1
- Semen Zak 269
- Pasir M3 0.026843786
6 Kawat Harmonika M2 650.445 131.55 4.9
7 Pengecatan M2 1454.100
- Cat 2 Lapis Ltr 290.82
Pengurangan

10,000 12,100,000

150,000 135,750,000
500,000 35,000,000
800,000 55,200,000

150,000 12,750,000
500,000 3,500,000
800,000 5,600,000
200,000 19,200,000

1,800,000 8,121,600
20,000 902,400
80,000 3,158,400
2,000 451,200

150,000 13,200,000
500,000 4,369
2,000 36,834,000

150,000 40,350,000
500,000 13,422

20,000 5,816,400

387,951,791 5,819,276.87
No Item Pekerjaan Satuan Volume Panjang Lebar Tinggi Jumlah

1 Pembersihan Lokasi M2 459 27 17


2 Lantai Lap. FutsalKk-150 M3 46 27 17 0.1
- Semen Zak 344
- Pasir M3 27
- Kerikil M3 26
7 Pengecatan M2 375
- Cat 2 Lapis Ltr 75
Pengurangan
No Item Pekerjaan Satuan Volume Panjang Lebar Tinggi Jumlah

1 Pembersihan Lokasi M2 473 27.3 17.3


2 Lantai Lap. FutsalKk-150 M3 48 27.3 17.3 0.1
- Semen Zak 359
- Pasir M3 28
- Kerikil M3 28
3 Kolom 20 x 20 M3 7.92 6 0.2 0.2 33
- Semen Zak 60
- Pasir M3 5
- Keriil M3 5
- Besi Ø8 Ljr 68 6.1 132
a Bekisting M2 158.4 6 0.2 0.2 33
- Kayu Kelas III M3 3.168
- Paku kg 31.68
- Plywood lbr 27.72
- Kayu Dolken Batang 158.4
4 Dinding +1 meter, 1:4 M2 81.9 81.9 1
- Semen Zak 55
- Pasir M3 0.0054405
- Bata Merah 5x11x22 bh 11466
5 Plesteran M2 322.2
- Semen Zak 214
- Pasir M3 29.9646
6 Kawat Harmonika M2 404.510 81.9 4.9
7 Pengecatan M2 697.200
- Cat 2 Lapis Ltr 139.44
Pengurangan

You might also like