You are on page 1of 2

16293 16293 16293 16293 16293 16293 16293 16293 16293

16293 Roll No.


16293 16293 16293 16293 16293 Total16293
No. of Pages
16293 : 02 16293

Total No. of Questions : 15


MBA/MBA(IB) (2012 & Onward) (Sem.–2)
16293 16293 16293 16293 16293 16293 16293 16293 16293
PRODUCTION AND OPERATION MANAGEMENT
Subject Code : MBA-202
16293 16293 16293 16293 Paper16293
ID : [C0247]
16293 16293 16293 16293

Time : 3 Hrs. Max. Marks : 60

16293 INSTRUCTION
16293 16293TO CANDIDATES
16293 : 16293 16293 16293 16293 16293

1. SECTION-A contains SIX questions carrying FIVE marks each and students has
to attempt any FOUR questions.
2. SECTIONS-B consists of FOUR Sub-sections : Units-I, II, III & IV. Each Sub-
16293 16293
section16293 16293
contains T WO questions 16293 16293
each carrying 16293
EIGHT marks 16293
and student has to 16293

attempt any ONE question from each Sub -section.

m
3. SECTION-C is COMPULSORY and consist of ONE Case Study carrying EIGHT
marks.

o
16293 16293 16293 16293 16293 16293 16293 16293 16293

16293 16293 16293 16293


SECTION-A
16293
.r c16293 16293

m
16293 16293

e
1. Define Product Design & Development.
2.
p
Discuss the concept of facility location.
o
a .r c
16293 16293 16293 16293 16293 16293 16293 16293 16293
3. What do you understand by method study and work measurement?
4.

r p
Explain the benefits of Six Sigma.

e
16293 16293
5.
6.
What is16293
b 16293
Juran’s Quality Trilogy? 16293 16293

a p
16293

Elaborate the importance of value analysis in Production Management.


16293 16293

rp
16293 16293 16293 16293 16293 16293 16293 16293 16293

16293 16293 16293 16293


SECTION-B
UNIT-I
16293 b 16293 16293 16293 16293

7. Explain the transformation process model of operations management. Discuss the various
types of production systems. Give examples.
16293 16293 16293 16293 16293 16293 16293 16293 16293
8. Discuss the need and importance of new product design and development. Explain the
steps involved in new product design & development, with examples.

16293 16293 16293 16293 16293 16293 16293 16293 16293

1 | M-49097 (S13)-1524

16293 16293 16293 16293 16293 16293 16293 16293 16293

16293 16293 16293 16293 16293 16293 16293 16293 16293


16293 16293 16293 16293 16293 16293 16293 16293 16293

UNIT-II
16293 16293 16293 16293 16293 16293 16293 16293 16293

9. Discuss the concept and importance of Method Study and Work Measurement. What are
the functions of Production Planning and Control?
16293 10. What are
16293 16293the various types of plant
16293 16293layouts? Also
16293discuss the problems faced
16293 16293 while 16293

deciding on a facility layout.

UNIT-III
16293 16293 16293 16293 16293 16293 16293 16293 16293

11. Discuss the various types of Sampling Techniques. What are the applications of control
charts? Explain with illustrations.
16293 12. What is16293
16293 the importance
16293of Total Quality
16293 Management?
16293 Discuss16293
Deming's 14 16293
principles 16293

and Juran’s Quality Trilogy.


UNIT-IV
16293 16293 16293 16293 16293 16293 16293 16293 16293
13. Explain Value analysis in operations management. Discuss virtual factory concept.

16293 16293 find the16293


expression for16293
total optimised costs.
16293 16293
m
14. Derive an expression for Economic Order Quantity, stating suitable assumptions. Also

o
16293 16293 16293

16293 16293 16293 16293 SECTION-C


16293
.r c 16293 16293

m
16293 16293

15. Case Study :

p e o
a .r c
16293 16293
XYZ Ltd16293
does the ABC
16293
classification
16293
of the various
16293
components
16293
and parts it16293
uses for 16293
assembling its tractors. As an operations manager, you are required to classify the

r p
following parts and components into A, B and C categories according to their usage

e
values. Draw the ABC distribution curve. Item # 8 has a high criticality class
16293 16293 i.e. a shortage
16293

b
of this item may lead
16293 16293 to a complete

What special treatment can be given to this item?

a
16293

p
halt in 16293
the production16293process. 16293

rp
Item ID# Unit Price (Rs) Annual usage (Units)
16293 16293 16293 16293 16293 16293 16293
1 5 100,00016293 16293

b
2 35 2,600
3 79 420
16293 16293 16293 4 16293 16293 68 16293 16293 13,600 16293 16293
5 800 210
6 2,300 670
7 450 76
16293 16293 16293 16293 16293 16293 16293
8 6 400 16293 16293

9 92 6,100
10 3 250,000
16293 16293 16293 16293 16293 16293 16293 16293 16293

2 | M-49097 (S13)-1524

16293 16293 16293 16293 16293 16293 16293 16293 16293

16293 16293 16293 16293 16293 16293 16293 16293 16293

You might also like