You are on page 1of 3

Earth bag technology Houses (Comparison)

Suggestion for
Catalogue II New submitted design improvement
1. One storey 1. One plus Attic

Provide GI
messing

GI Wire Messing Simply cement plaster

Provide the
floor reinforced
bands

Provision of reinforced Roof Band No provision of any reinforced Bands


Provide the
Buttressed
walls

Provision of Butressed walls No Provision of Buttressed Walls

Improve the
Connection
Between the
floors by
additional
means

Connection between GF and Attic floor


Conform the
embedment of the
reinforcement
with proper
anchorage (assure
not surficial
exposing of the
reinforcement)

Additional reinforcement between the floors

Conform the
Quality of soil.