Professional Documents
Culture Documents
1 Perhitungan Menara Air PDF
1 Perhitungan Menara Air PDF
1. MODEL PORTAL
2.5 m
5.8 m
3.0 m
3.0 m
K K 3.9 m
POOR
POND. STROUSS
2.5 m
2. DATA UMUM
- Kapasitas tagki air = 3 m3
- Beton : K-300 f'c = 24.9 Mpa
- Baja : U-32 fy = 320 Mpa
3. PERENCANAAN PLAT
Tebal plat ( h ) = 150 mm
ly = 2.50 Tebal selimut beton (d') = 25 mm
dx = h - ( d' + f sengkang + 0,5 f tul. utama )
Rn = Mn / ( 0,8bd2 )
r min = 1,4 / fy
lx = 2.50 r b = (0,85*b1*f'c/fy)*(600/600+fy)
r max = 0,75*r b
b1 = 0.85
m = fy/(0,85*f'c)
r perlu = (1-(1-(2*m*Rn/fy))^0,5)/m
r pakai = diambil nilai terbesar dari r min dan r perlu
As = r b d
i. Beban Mati ( D )
- Berat sendiri plat = 2.50 x 2.50 x 0.15 x 2400 = 2250 kg
- Beban air = 3 m3 x 4 x 1000 = 12000 kg
= 14250 kg
D = 2280 kg/m2
ii. Beban Hidup ( L )
- Beban hidup plat L = 100 kg/m2
Diasumsikan plat dalam keadaan terjepit penuh pada masing-masing tepinya, sehingga perbandingan ly/lx1
Dari tabel 13.3.1 PBI 1971 diperoleh :
Mlx = 0.001 Qu lx2 21
Mly = 0.001 Qu lx2 21
Mtx = -0.001 Qu lx2 52
Mty = -0.001 Qu lx2 52
iv. Momen
Mlx = 0.001 x 2896.0 x 2.5^2 x 21 = 380.10 kgm = 3,727,772.34 Nmm
Mly = 0.001 x 2896.0 x 2.5^2 x 21 = 380.10 kgm = 3,727,772.34 Nmm
Mtx = 0.001 x 2896.0 x 2.5^2 x 52 = 941.20 kgm = 9,230,674.36 Nmm
Mty = 0.001 x 2896.0 x 2.5^2 x 52 = 941.20 kgm = 9,230,674.36 Nmm
v. Penulangan
Penulangan arah X
Lapangan Tumpuan
Mlx = 3,727,772.34 Nmm Mtx = 9,230,674.36 Nmm
dx = 119.00 mm dx = 119.00 mm
Rn = 0.33 Rn = 0.81
m = 15.12 m = 15.12
r perlu = 0.0010 r perlu = 0.0026
rb = 0.0367 rb = 0.0367
r min = 0.0044 r min = 0.0044
r max = 0.0275 r max = 0.0275
r pakai = 0.0044 r pakai = 0.0044
b1 = 0.85 b1 = 0.85
As perlu = 520.63 mm2 As perlu = 520.63 mm2
Spasi perlu = 217.23 mm Spasi perlu = 217.23 mm
Tul. Pakai = f 12 - 150 mm Tul. Pakai = f 12 - 150 mm
As pasang = 753.98 mm2 As pasang = 753.98 mm2
Penulangan arah Y
Lapangan Tumpuan
Mly = 3,727,772.34 Nmm Mty = 9,230,674.36 Nmm
dx = 119.00 mm dx = 119.00 mm
Rn = 0.33 Rn = 0.81
m = 15.12 m = 15.12
r perlu = 0.0010 r perlu = 0.0026
rb = 0.0367 rb = 0.0367
r min = 0.0044 r min = 0.0044
r max = 0.0275 r max = 0.0275
r pakai = 0.0044 r pakai = 0.0044
b1 = 0.85 b1 = 0.85
As perlu = 520.63 mm2 As perlu = 520.63 mm2
Spasi perlu = 217.23 mm Spasi perlu = 217.23 mm
Tul. Pakai = f 12 - 150 mm Tul. Pakai = f 12 - 150 mm
As pasang = 753.98 mm2 As pasang = 753.98 mm2
4. PERENCANAAN BALOK
i. Preliminary Design
Bentang 2.50 m
h > 2.5 x 0.4 + fy --> h > 2.5 x 0.4 + 320 = 0.18 m
12 700 12 700
dipakai h= 0.25 m
1 h < b < 2 h --> 1 x 0.25 < b < 2 x 0.25
2 3 2 3
dipakai b= 0.20 m
dimensi balok = 25 / 20
Tebal selimut beton (d') = 25 mm
dx = h - ( d' + f sengkang + 0,5 f tul. utama )
Rn = dMn / ( 0,8bd2 )
r min = 1,4 / fy
r b = (0,85*b1*f'c/fy)*(600/600+fy)
r max = 0,75*r b
b1 = 0.85
m = fy/(0,85*f'c)
r d = (1-(1-(2*m*Rn/fy))^0,5)/m
r ' = dMn / 0,8.fy.b.d.dx
r = rd + r'
As = r b d
As' = r' b d
ii. Pembebanan
- Beban ekwivalen plat
qek = 0.5 x Qu x lx = 0.5 x 2896 x 2.5 = 3620.00 kg/m1
- Berat sendiri balok = 0.25 x 0.20 x 2400 = 120.00 kg/m1
- Beban dinding = 5.80 x 0.15 x 1700 = 1479.00 kg/m1
Q = 5219.00 kg/m1
iii. Momen
Berdasarkan ikhtisar momen pada PBI 1971 diperoleh :
Mlap = 0.091 x 5219.0 x 2.5^2 = 2,965.34 kgm = 29,082,125.27 Nmm
Mtum = 0.056 x 5219.0 x 2.5^2 = 1,812.15 kgm = 17,772,409.89 Nmm
iv. Penulangan
Penulangan balok menggunakan tulangan rangkap dengan d = 1/2, dimana tulangan tekan dan tulangan tarik
bekerja secara bersama-sama.
* Tulangan Lentur
Lapangan Tumpuan
Mlap = 29,082,125.27 Nmm Mtum = 17,772,409.89 Nmm
dx = 219.00 mm dx = 219.00 mm
Rn = 0.76 Rn = 0.46
m = 15.12 m = 15.12
rd = 0.0024 rd = 0.0015
r' = 0.0052 r' = 0.0032
rb = 0.0367 rb = 0.0367
r min = 0.0044 r min = 0.0044
r max = 0.0275 r max = 0.0275
r = 0.0076 r = 0.0046
b1 = 0.85 b 1 = 0.85
Asperlu = 332.88 mm 2 As perlu = 202.96 mm2
Tul. Pakai = 3 - f 12 ( As =339.29 ) Tul. Pakai = 3 - f 12 ( As =339.29 )
As'perlu = 227.20 mm 2 As'perlu = 138.85 mm 2
200 mm 200 mm
f 12 3 f 12 3
250 mm 250 mm
f 12 3 f 12 3
Lapangan Tumpuan
* Tulangan Geser
Vutump = 0.50 x 5219.0 x 2.5 = 6,523.75 kg = 63,980,675.60 N
Vulap = 0.13 x 5219.0 x 2.5 = 1,630.94 kg = 15,995,168.90 N
f = 0.60
Vc = 1/6 x f'c0,5 x b x dx = 6,259,294.42 N
Vsmin = 1/3 x b x dx = 7,933.33 N
Vsmax = 1/3 x f'c0,5 x b x dx = 12,518,588.8 N
f Vc/2 = 1,877,788.33
f Vc = 3,755,576.65
200 mm 200 mm
f 12 3 f 12 3
f 10 - 150 250 mm f 10 - 90
f 12 3 f 12 3
Lapangan Tumpuan
5. PERENCANAAN KOLOM 50 X 50
- 2280 x 2.5 x 2.5 = 14250.00 kg
- 5219 x 2.5 = 13047.50 kg
27297.50 kg
- 0,5 x 0,5 x 2400 x 15 = 9000 kg
36,297.5 kg
qtot = min
14 D 16 f 10 - 200
6. PERENCANAAN POER
Dalam merencanakan tebal poer harus dipenuhi syarat bahwa kekuatan geser nominal beton harus lebih besar
dari geser pons yang terjadi. Berdasarkan SK SNI T-15-1991-03 Pasal 3.4.11 butir 2 menyebutkan bahwa harga Vn
tidak boleh lebih besar dari Vc.
= 1/3 fc' . bo . d
0,5
Vc
dimana :
bc = rasio sisi terpanjang terhadap sisi terpendek dari beban terpusat
= 500/500 = 1
d = 500 - (60 + 0,5. 22) = 429 mm
bo = keliling dari penampang kritis poer
= 2 . (P +d) + 2 . (L + d)
= 2 x (500+429) + 2 x (500 + 429) = 3,716 mm
Vc = 3,977,431.19 N atau
Vc = 2,651,620.80 N
Rn = 1.93
m = 15.12
r perlu = 0.0063
rb = 0.0367
r min = 0.0044
r max = 0.0275
r pakai = 0.0063
b1 = 0.85
As perlu = 2722.07 mm2
Spasi perlu = 104.16 mm
Tul. Pakai = f 19 - 100 mm
As pasang = 2835.29 mm2
Vu = n.Pmaks-q.L
= 145,082.00 kg = 1,422,869.42 N
Karena kekuatan geser beton lebih besar dari pada gaya geser yang bekerja, maka tulangan geser dipasang
tulangan praktis saja. Tulangan geser diambil dengan cara membengkokkan tulangan lentur keatas, dan untuk
mengatasi torsi dipasang tulangan samping 3 D 16.
Penulangan Poer
f19-100
f19-100
m m m m m m m m m m m m m m f16-3
m m
m m
m m
m m m m m m m m m m m m m m
f 19 - 100
f 19 - 100
6 f 12
f19 -3
f19 -3
7. KONTROL STABILITAS
Stabilitas bangunan sangat dipengaruhi oleh gaya-gaya luar yang bekerja tegak lurus pada bidang-bidang yang
ditinjau terhadap beban-beban yang bekerja pada bangunan tersebut.
Dalam hal ini gaya yang dianggap berpengaruh adalah tekanan angin. Diasumsikan tekanan angin yang bekerja
adalah sebesar 40 kg/m2. (pasal 4.2. PMI 1970)
Analisa Mekanika
Q* * Beban
W = 5.8 x 2.5 x 40 = 580.00 kg
W Q* = 36,297.50 x 2.5 = kg/m'
90,743.75
* Reaksi Tumpuan
Ra = Rb = 90,743.75 x 2.5 = 113,429.69 kg
5.8 m 2
3.0 m
- Momen akibat beban merata
Mab = QL2
2
3.0 m = 90,743.75 x 2,52 = 567,148 kgm
2