Qatar Shell GTL Ltd
Restated Page oft
Appendix 1 — Pressure Test Form
Reference number.
‘Minimum test duration
“Test pressure: Equipment design pressure:
Raliaf value eat proses
(max 110% of test pressure)
Permissible water temp range:
Permissible chloride content:
‘The following section is to be completed by the Inspection Engineer
[Pressure gauge sin: —=S=S=S~S*«”iCalibration expiry date.
Pressure gauge 2 sin Calibration expiry date:
Water chloride content
Water temperature:
“Test duration
Test date:
Inspectors signature:
Taspectors namie
‘onan io: EPRNMILOTST ‘ALL PABER GOMES ARE UNCONTROLLED
Reuison: 2 Pint Date 02 August 2018Qatar Shell GTL Ltd
Restricted Page 10 of 17
Appendix 2 — Preparation / Reinstatement check list
Reference number
Pre-test checks Yos No NA
Can the suppor structure support the test weight ooag
Markadt-in drawings avalahle and complote og
ee ae
Non destructive testing complete and acceptable eye) ial
Maintenance activities complete / suspended he
SS ooo
Pressure test gauges calibrated Peo
Pressure test SRV set correctly ood
All applicable welds and joints accessible and visible hog
Has temper or hydrogen embritiement been considered Sea
Al te lable betow) prepared Hea
Post-test chocks Yes No NA
‘System fully depressurized im H 0
System fly rained qd oO
System fly cried oog
Alltemsin table (below) reinstated ooaoeg
Ttem description and location or tag number Preparation | Reinstatement
Reinstatement includes the fing of new gaskets at any disturbed joins.
(continue on separate sheet if required)
Ingpactors signature,
Inspectors name
Date
Goomentio: EPRNMLOTS7 ‘ALL PAPER GOMES ARE UNCONTROLLED
Revision. 2 Pre Date: 02 August 2018