Qatar Shell GTL Ltd Restated Page oft Appendix 1 — Pressure Test Form Reference number. ‘Minimum test duration “Test pressure: Equipment design pressure: Raliaf value eat proses (max 110% of test pressure) Permissible water temp range: Permissible chloride content: ‘The following section is to be completed by the Inspection Engineer [Pressure gauge sin: —=S=S=S~S*«”iCalibration expiry date. Pressure gauge 2 sin Calibration expiry date: Water chloride content Water temperature: “Test duration Test date: Inspectors signature: Taspectors namie ‘onan io: EPRNMILOTST ‘ALL PABER GOMES ARE UNCONTROLLED Reuison: 2 Pint Date 02 August 2018 Qatar Shell GTL Ltd Restricted Page 10 of 17 Appendix 2 — Preparation / Reinstatement check list Reference number Pre-test checks Yos No NA Can the suppor structure support the test weight ooag Markadt-in drawings avalahle and complote og ee ae Non destructive testing complete and acceptable eye) ial Maintenance activities complete / suspended he SS ooo Pressure test gauges calibrated Peo Pressure test SRV set correctly ood All applicable welds and joints accessible and visible hog Has temper or hydrogen embritiement been considered Sea Al te lable betow) prepared Hea Post-test chocks Yes No NA ‘System fully depressurized im H 0 System fly rained qd oO System fly cried oog Alltemsin table (below) reinstated ooaoeg Ttem description and location or tag number Preparation | Reinstatement Reinstatement includes the fing of new gaskets at any disturbed joins. (continue on separate sheet if required) Ingpactors signature, Inspectors name Date Goomentio: EPRNMLOTS7 ‘ALL PAPER GOMES ARE UNCONTROLLED Revision. 2 Pre Date: 02 August 2018

You might also like