Professional Documents
Culture Documents
Changes have been made to the Terms of reference for the GNB Advisory Group (NB-CPR/IR/2) and
to the Terms of Reference for Sector Groups (NB-CPR/IR/3).
For the Terms of Reference for the GNB-Advisory Group, the changes are:
- Whilst maintaining consensus as the general principle, the conditions for majority decisions
have been made clearer.
- References to the Standing Committee on Construction (SCC) have been removed as the role
of that committee has changed.
- More clear rules for the election of GNB President if two candidates have the same number
of votes.
- Made more clear that documents of the GNB Advisory Group are to be made available to
members – not to be published.
For the Terms of Reference for Sector Groups, the changes are:
- New principles for the allocation of EADs have been included. EADs are allocated on the
basis of the technical area codes defined by CPR Annex IV. A new Annex B has been
included.
- References to Guidelines for European Technical Approvals (ETAGs) and the corresponding
EOTA committees have been removed.
- The conditions for remote monitoring of SG meetings have been defined.
- A new Sector Group 22 has been defined for cables to EN 50575.
- References to AVCP systems have been removed from annex A
The revised internal rules have been uploaded to the CIRCABC space GNB-CPR Internal Rules (See
LINK).
Please do not hesitate to contact TechSec if you have any questions or comments.
TechSec
Anders Elbek
Tech-sec@dti.dk