SITE ACCEPTANCE FOLDER
Nokia eNodeB
Site No. : 6350
Site Name : 6350
Project — : Capex-Modernization 2018
PO Number:
ms Caer See
er ronan
yrepared (also subject responsible ifother) ‘i
imotiucidin Project: _Capex-Modemization 2017RF Data Sheet
Material List (H04)
HOS Final site Checklist
Outstanding Item List (H11)
RAN Global Checklist (GCL)
‘Shelter Floor plan and complete site pictures
Commissioning, Site information, SSV & Sweep Test Reports
Prepared (also subject responsible if other)
a ‘Mohiuddin
Project: _Capex-Modemization 2017
|S2iman Salman Qureshi
Date. 24-Aug-2017 Page 2010
Version 3:18Check power cables and Circuit Breaker (1008)
Check unit cabling
¢: Check installation done as per standard
Check unit's LED status during power up
‘Comments
as
Ojojojojo};
olojojoja
Hardware and Software
Point to Check
z
8
Check BTS Site manager's hardware view shows all installed units
Check Tag Number for the Cabinet.
Check SI No of the Modules
Check BTS Site manager's software version and update if necessary.
‘Save the Site info & commisioning report.
| Check MHA settings and type serial numbers and Barcodes of MHAs
Check antenna Tlts settings type serial numbers and Barcodes
Check fall the labeling done as per standard
RHO SQ gags
Bjojojolojojojo
g/o)g}ojola|ojole
Comments
NAME: SIGNED: DATE:
(NOKIA Representative)
name: __ AZH? Led Pe AIGNED: je eS pate: 29 J Ze) Ba
(MOBIL? Representative)
Prepared (also subject responsible if other)
‘Meiraj Mohiuddin Project: Capex-Modemization 2017
Dae cp oe
|r ores Vener San