Gas Lift Spread Calculation Don't make much sense

Tsh 7 Well Number


7600 Lift Depth
8.681 Casing I.D
4.500 Tubing OD
3.958 Tubing I.D
3.518 Annulus/Tubing Volume Ratio
70 Back Pressure at Well
350 Maximum Slug Pressure at Surface
0.850 Z factor for Casing Gas
0.950 Z factor for Tubing Gas
71 Casing Spread Required
1-1/2" Valve
3/8 Valve Port Size Port R 1-R TEF
0.8619 1-R factor 3/16 0.0345 0.9655 3.57
0.1381 R factor 1/4 0.0614 0.9386 6.54
0.1602 TEF = % 16.0 5/16 0.0959 0.9041 10.61
208 Temp @ valve 3/8 0.1381 0.8619 16.02
0.759 Tcf 7/16 0.1879 0.8121 23.14
900 Surface Open Pressure 1/2 0.2454 0.7546 32.52
1057 Open Press@ Depth
802 Surface Close Pressure
98 Valve Spread
300 Expected Production Rate (Bbl/Day)
2069 Required Scf/Bbl @ Lift Depth
621 MCFD Lift Gas Required
0.37 Fluid Gradient (Psi/ft)
15.2 Tubing Capacity (Bbl/1000ft)
11.5 Bbl per Slug
26 Cycle/Day to produce expected rate
0.9 Hours per cycle