Professional Documents
Culture Documents
1. Discrete Manufacturing
2. Repetitive Manufacturing
the system.
MRP run.
Guys, I believe you got an idea about the steps involved prior
They are
production execution.
1 Material availability
2 Capacity availability
3 Creation of Batch
4 Reservation creation
type parameter.
confirmation parameter.
termed as confirmation.
operation.
Back-flush components
confirmation parameter.
1. Through confirmation
Hope the above briefing has given you the enough idea to go
Best Regards,
Dheeraj Rawal