You are on page 1of 4

Working together

for a safer world

Thickness measurement and close-up survey guidance


Ver. 7.4

February 2017
Thickness Measurement And Close‐Up Survey Guidance 

Contents

Part 1 Thickness Measurement Process

Chapter 1 Introduction
Chapter 2 Survey Planning
Chapter 3 Preparation of Spaces
Chapter 4 Thickness Measurement and Close-up Surveys
Chapter 5 Permissible Diminution
Chapter 6 Additional Assessments
Chapter 7 TM Reporting

Part 2 Special Survey Requirements:


Other Ship Types & General Dry Cargo Ships

Part 3 Special Survey Requirements:


Bulk Carriers

Part 4 Special Survey Requirements:


Oil Tankers, Ore/Oil Ships, Ore/Bulk/Oil Ships

Part 5 Special Survey Requirements:


Chemical Tankers

Part 6 Special Survey Requirements:


Ships For Liquefied Gases

Part 7 Annual And Intermediate Survey Requirements

Part 8 Assessment Of Protective Coatings In Ballast Tanks :


All Ships

Appendix 1 Opening Meeting Form

Appendix 2 Thickness Measurement Report Forms

2
Thickness Measurement And Close‐Up Survey Guidance 

Contents

Appendix 3 Guidance On Thickness Measurement For Transverse Sections And The


Evaluation Of Longitudinal Strength Of Hull Girders For All Ships
(Including Oil Tankers Greater Than 130m In Length)

Appendix 4 Guidance On Thickness Measurement Of Cargo Hold Shell


Frames On Single Skin Bulk Carriers Contracted For Construction Prior
To 1 July 1998

Appendix 5 Approval Of Thickness Measurement Companies

Appendix 6 Guidance Notes For Evaluation Of Scantlings Of Corrugated Transverse


Watertight Bulkheads In Bulk Carriers Contracted For Construction On
Or After 1 July 1998

Appendix 7 Guidance Notes For Evaluation Of Scantlings Of Hatch Covers & Hatch
Coamings Of Cargo Holds Of Bulk Carriers Contracted For Construction
On Or After 1 July 1998 & Bulk Carriers, Ore Carriers And Combination
Carriers Contracted For Construction On Or After 1 January 2004. Also
All Remaining Ships Contracted For Construction On Or After 1 July 2012.

Appendix 8 Guidelines For The Gauging / Renewal / Reinforcement Of The Vertically


Corrugated Transverse Watertight Bulkhead Between Holds Nos. 1 And
2 In Accordance To UR S19.

Appendix 9 CAP TM Jobs Argonaut User Guide

Appendix 10 Residual Deck Buckling in Argonaut

3
For further information, contact your local Lloyd’s Register group office.

For all other Thickness Measurement guidance and information about our services go to:
www.lr.org/tm

www.lr.org
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Lloyd’s Register Group Limited (Reg. no.08126909) is a limited company registered in England and Wales. Registered office: 71 Fenchurch
Street, London, EC3M 4BS, UK. A member of the Lloyd’s Register group.

Lloyd’s Register Group Limited , its affiliates and subsidiaries and their respective officers, employees or agents are, individually and
collectively, referred to in this clause as the ‘Lloyd’s Register Group’. The Lloyd’s Register Group assumes no responsibility and shall not be
liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided,
unless that person has signed a contract with the relevant Lloyd’s Register Group entity for the provision of this information or advice and in
that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.

You might also like