PREDIMENSIONAMIENTO DEL MURO DE CONTENCIÓN "MC-1"

h = 2.80 m
e = 0.35 m
t = 1.70 m
h1 = 0.90 m
hp = 2.80 m varia de : 0.90xh = 2.52 m
L = 1.20 m varia de : 0.50xh = 1.40 m
n = 0.00 m varia de : 0.10xh = 0.28 m
hz = 0.00 m varia de : 0.10xh = 0.28 m
R = 0.00 m

S/C = 2.00 tom/m2


hs/ys = 1.02 m

DETERMINACIÓN DE " t "

ф = 30.01 ˚
γs = 1.97 ton/m3
f'c = 175 kg/cm2

Ka = 0.33
pa = 0.670 ton/m²
pa` = 2.507 ton/m²
Ea = 4.45 ton
Eua = 8.01 ton
d = 13.44 cm
d = 30.00 cm a usar
t = 35.00 cm
CHEQUEO POR FLEXIÓN "MC-1"

F'c = 175 kg/cm2


Fy = 4200 kg/cm2
k = 0.85
ρ máx = 0.0133

Eua = 8.01 ton


hp = 2.80 m
pa = 0.670 ton/m²
pa` = 2.507 ton/m²
E1 = 1.88
E2 = 2.57
Mu = 9.06 ton.m
t = 35.00 cm
d = 30.00 cm
Ku = 10.07
ρ = 0.0028
0.18*F´c/Fy = 0.0075

OK No requiere acero
CHEQUEO DE DESLIZAMIENTO, VOLTEO, PRESIONES "MC-1"

h = 2.80 m
e = 0.35 m
t = 1.70 m
h1 = 0.90 m
hp = 2.60 m
L = 1.20 m
n = 0.00 m
hz = 0.00 m
R = 0.00 m

ф = 30.01 ˚
γs = 1.97 ton/m3
γc = 2.40 ton/m3
f'c = 175 kg/cm2
� = 0.578
Ka = 0.33
σt = 1.90 kg/cm2
hs/c = 1.02 m

i base altura (área)x(γ) brazo (wi)x(brazo)


1 0.00 3.82 0.00 1.70 0.00
2 1.35 3.82 5.08 1.25 6.35
3 1.35 2.80 4.54 0.80 3.63
4 0.35 2.80 2.35 0.18 0.42
5 1.20 0.00 0.00 0.60 0.00
∑wi = 11.97 ∑= 10.40

CHEQUEO POR DESLIZAMIENTO

pa = 0.670 ton/m²
pa` = 2.507 ton/m²
Ea = 4.45 ton
F.S.D = 1.55 OK

CHEQUEO POR VOLTEO

MR = 10.40 ton.m
Mv = 5.03 ton.m
F.S.V = 2.07 OK

CHEQUEO DE PRESIONES
x = 0.45 m
e = 0.15 m
L/6 = 0.2
e<>L/6 = e<=L/6
σ1 = 17.46 ton/m²
σ2 = 2.49 ton/m2

σ1<σt = OK
DISEÑO DE PANTALLA "MC-1"

F'c = 175 kg/cm²


Fy = 4200 kg/cm²
k = 0.85
ρ máx = 0.0133

CORTE
Eua = 8.01 ton
Vu = 8.01 ton
hp = 2.80 m
t = 35.00 cm
d = 30.00 cm
Vc = 21.03 ton
Vud = 7.15 ton
Vud/Ф = 8.41 ton

= OK

FLEXIÓN
Mu = 9.06 ton.m
d = 30.00 cm
Ku = 10.07
ρ = 0.0028
= OK

As principal = 8.4 cm²


Ф utilizar = Ф1/2
Nº Ф = 1
S(Ф) = 0.151 m
S(Ф) utilizar = 0.150 m

As horizontal = 8.00 cm²


ρ = 0.0020
t = 40.00 cm
Ф utilizar = Ф1/2
⅔(As) = 5.33 cm²
⅓(As) = 2.67 cm²
S(Ф) = 0.24 m utilizar : 0.225 contacto con el exterior
S(Ф) = 0.48 m utilizar : 0.30 contacto con el suelo

As horizontal = 6.50 cm²


ρ = 0.0020
t = 32.50 cm
Ф utilizar = Ф1/2
⅔(As) = 4.33 cm²
⅓(As) = 2.17 cm²
S(Ф) = 0.29 m utilizar : 0.225 contacto con el exterior
S(Ф) = 0.59 m utilizar : 0.30 contacto con el suelo

As montaje
Ф utilizar = Ф1/2
S(Ф) = 45.72 cm
S(Ф) utilizar = 25 cm
DISEÑO DE CIMENTACIÓN DEL MURO "MC-1"

∑wi = 11.97 ton


MR = 10.40 ton.m
MV = 5.03 ton.m

∑w ui = 17.96 ton
MUR = 15.60 ton.m
MUV = 9.05 ton.m
L = 1.20 m

x = 0.36 m
e = 0.24 m
L/6 = 0.2 m
e<>L/6 = e>L/6
σ u1 = 33.26 ton/m²
- - - -

DISEÑO DE PUNTA

CORTE

F'c = 175 kg/cm²


Fy = 4200 kg/cm²
n = 0.00 m
hz = 0.00 m
d = -10.00 cm
wu = 33.26 ton/m
vu = 0.00 ton
vud = #DIV/0! ton
vc = -7.01 ton
vud/Ф = #DIV/0! ton

#DIV/0!

FLEXIÓN

Muv = 0 ton.m
d = -10.00 cm
ku = 0.00
ρ = 0.0000
ρ mín = 0.0018
ρ máx = 0.0133
ρ<>ρ mín = ρ<ρmín
ρ<>ρ máx = ρ<ρmáx
ρ a usar = 0.0018
As = -1.80 cm²
ф utilizar = Ф1/2 No requiere
Nº ф = 1
S(Ф) = -0.71 m
S( Ф) utilizar 0.15 m
DISEÑO DE CIMENTACIÓN DEL MURO "MC-1"

DISEÑO DE TALÓN

CORTE

F'c = 175 kg/cm²


Fy = 4200 kg/cm²
R = 0.00 m
γs = 1.97 ton/m3
hp = 2.80 m
hs/c = 1.02 m
d = -10.00 cm
w us = #DIV/0! ton/m
vu = #DIV/0! ton
v ud = #DIV/0! ton
vc = -7.01 ton
v ud /Ф = #DIV/0! ton

= #DIV/0!

FLEXIÓN

M uv = #DIV/0! ton.m
d = -10.00 cm
ku = #DIV/0!
ρ = #DIV/0!
ρ mín = 0.0018
ρ máx = 0.0133
ρ<>ρ mín = #DIV/0!
ρ<>ρ máx = #DIV/0!
ρ a usar = #DIV/0!
As = #DIV/0! cm²
ф utilizar = Ф1/2 No requiere
Nº ф = 1
S(Ф) = #DIV/0! m
S( Ф) utilizar 0.150 m