You are on page 1of 44

SECRETARIA DE ES

CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. PROYECTO: "CONSTRUCCION DE BULEVAR E


SUPERVISIÓN: CONSTRUCCION Y SUPERVISION DAVINCI S DE RL CV

CONTRATAD
#NAME? CONCEPTO Unidad
CANT.
A Pavimentos
A.1 Remocion de la carpeta existente m2 1,104.20
A.2 Excavacion Comun m3 6,377.46
A.3 Subexcavacion para Zonas Inestables m3
A.4 Material de Relleno m3
A.5 Conformacion de subrazante sub base m2 19,929.58
A.6 Sub-base m3 2,254.16
A.7 Pavimento Concreto Hidraulico e=17 cm F'c=4000 psi m2 14,441.75
A.8 Pavimento Concreto Hidraulico e=17 cm F'c=3000 psi m2 585.99
A.9 Aceras de Concreto hidraulico e=10 cm m2 933.86
A.10 Bordillos ml 3,517.86
Sub-Total 1
B Señalizacion
B.1 Señalizacion Horizontal Pintura Acrilica ml 3,517.86
B.2 Señalizacion Horizontal Pintura Termo Plastica ml 1,955.32
B.3 Señalizacion Vertical Unidad 20.00
Sub-Total 2
C Obras de Drenaje

Página No. 1
SECRETARIA DE ES

CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. PROYECTO: "CONSTRUCCION DE BULEVAR E


SUPERVISIÓN: CONSTRUCCION Y SUPERVISION DAVINCI S DE RL CV

CONTRATAD
#NAME? CONCEPTO Unidad
CANT.
C.1 Excavacion para drenaje m3 33.17
C.2 Relleno para drenajes m3 16.58
C.3 Tragantes a Reubicar u 1.00
C.4 Tragantes sencillos u 2.00
C.5 Tuberia TCR 24" T3 ml 27.64
C.6 Tuberia TCR 36" T3 ml
C.7 Cuneta Revestida de Concreto m2
C.8 Mamposteria para Drenaje m3 5.00
Sub-Total 3
D Areas Verdes
D.1 Areas Verdes en mediana m2 599.04
Sub-Total 4
E Varios
E.1 Demolicion de Bordillos existentes ml 168.61
E.2 Demolicion de pavimentos existentes m2 384.79
E.3 Movilizacion de postes de concreto u 20.00
E.4 Arbol a cortar u 2.00
E.5 Administracion delegada glb 1.00

Página No. 2
SECRETARIA DE ES

CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. PROYECTO: "CONSTRUCCION DE BULEVAR E


SUPERVISIÓN: CONSTRUCCION Y SUPERVISION DAVINCI S DE RL CV

CONTRATAD
#NAME? CONCEPTO Unidad
CANT.
Sub-Total 5
D Servicios de Consultoria para el diseño de la obra
D.1 Diseño gbl 1.00
Sub-Total 6
SUB - TOTAL (1 + 2 + 3 + 4 + 5 + 6)
GRAN TOTAL

..

CONTRATISTA

Página No. 3
REPUBLICA DE HONDURAS
SECRETARIA DE ESTADO EN LOS DESPACHOS DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
DIRECCIÓN GENERAL DE CARRETERAS.

CCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMEN
OLANCHO"

CONTRATADA ORDEN DE CAMBIO #1 (CANTIDADES REALES) EJECUTADO ANTERIORMENTE


P. U. TOTAL CANTIDAD P.U TOTAL CANTIDAD TOTAL

59.87 66,108.45 6,278.00 59.87 375,863.86 6,278.00 375,863.86


120.50 768,483.93 3,942.40 120.50 475,059.20 2,229.80 268,690.90
5,022.40 120.50 605,199.20 3,214.80 387,383.40
5,660.80 138.55 784,303.84 3,285.60 455,219.88
21.15 421,510.62 13,541.80 21.15 286,409.07 7,776.80 164,479.32
242.38 546,363.30 2,572.94 242.38 623,629.20 1,477.59 358,138.26
822.18 11,873,718.02 12,960.78 822.18 10,656,094.10 0.00 0.00
725.44 425,100.59 0.00 725.44 0.00 0.00 0.00
532.36 497,149.71 231.3300758 532.36 123,150.88 0.00 0.00
194.32 683,590.56 2,681.09 194.32 520,989.41 0.00 0.00
### 14,450,698.76 ###

19.20 67,542.91 2,681.09 19.20 51,476.93 0.00 0.00


61.06 119,391.84 720.00 61.06 43,963.20 0.00 0.00
3,488.25 69,765.00 20.00 3,488.25 69,765.00 0.00 0.00
256,699.75 165,205.13 0.00

Página No. 4
REPUBLICA DE HONDURAS
SECRETARIA DE ESTADO EN LOS DESPACHOS DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
DIRECCIÓN GENERAL DE CARRETERAS.

CCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMEN
OLANCHO"

CONTRATADA ORDEN DE CAMBIO #1 (CANTIDADES REALES) EJECUTADO ANTERIORMENTE


P. U. TOTAL CANTIDAD P.U TOTAL CANTIDAD TOTAL
138.83 4,604.99 174.00 138.83 24,156.42 0.00 0.00
104.56 1,733.60 154.10 104.56 16,112.70 0.00 0.00
18,432.07 18,432.07 1.00 18,432.07 18,432.07 0.00 0.00
18,432.07 36,864.14 0.00 18,432.07 0.00 0.00 0.00
4,802.34 132,736.68 14.00 4,802.34 67,232.76 0.00 0.00
24.00 5,658.51 135,804.24 0.00 0.00
1,283.84 532.36 683,465.06 0.00 0.00
2,818.05 14,090.25 197.86 2,818.05 557,579.37 4.60 12,963.03
208,461.73 1,502,782.62 12,963.03

78.89 47,258.27 317.03 78.89 25,010.50 0.00 0.00


47,258.27 25,010.50 0.00

26.80 4,518.75 0.00 26.80 0.00 0.00 0.00


156.05 60,046.48 0.00 156.05 0.00 0.00 0.00
18,836.55 376,731.00 6.00 18,836.55 113,019.30 0.00 0.00
1,008.80 2,017.60 25.00 1,008.80 25,220.00 25.00 25,220.00
84,210.18 84,210.18 1.00 40,032.63 40,032.63 0.00 0.00

Página No. 5
REPUBLICA DE HONDURAS
SECRETARIA DE ESTADO EN LOS DESPACHOS DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
DIRECCIÓN GENERAL DE CARRETERAS.

CCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMEN
OLANCHO"

CONTRATADA ORDEN DE CAMBIO #1 (CANTIDADES REALES) EJECUTADO ANTERIORMENTE


P. U. TOTAL CANTIDAD P.U TOTAL CANTIDAD TOTAL
527,524.01 178,271.93 25,220.00

604,615.27 604,615.27 1.00 604,615.27 604,615.27 1.00 604,615.27


604,615.27 604,615.27 604,615.27
### 16,926,584.21 ###
### 16,926,584.21 ###

0.00

SUPERVISION

Página No. 6
D DE CATACAMAS, DEPARTAMENTO DE ESTIMACIÓN No. : 02
PERIODO: DEL 01/12/16 AL 31/12/16

EJECUTADO ESTE PERIODO TOTAL ACUMULADO


% EJEC.
CANTIDAD TOTAL CANTIDAD TOTAL

0.00 0.00 6,278.00 375,863.86 100.00%


930.00 112,065.00 3,159.80 380,755.90 80.15%
0.00 0.00 3,214.80 387,383.40 64.01%
0.00 0.00 3,285.60 455,219.88 58.04%
0.00 0.00 7,776.80 164,479.32 57.43%
0.00 0.00 1,477.59 358,138.26 57.43%
7,592.00 6,241,990.56 7,592.00 6,241,990.56 58.58%
0.00 0.00 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00%
386.80 75,162.98 386.80 75,162.98 14.43%
### 8,438,994.16 58.40%

0.00 0.00 0.00 0.00 0.00%


0.00 0.00 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00%
0.00 0.00 0.00%

Página No. 7
D DE CATACAMAS, DEPARTAMENTO DE ESTIMACIÓN No. : 02
PERIODO: DEL 01/12/16 AL 31/12/16

EJECUTADO ESTE PERIODO TOTAL ACUMULADO


% EJEC.
CANTIDAD TOTAL CANTIDAD TOTAL
42.00 5,830.86 42.00 5,830.86 24.14%
37.94 3,967.01 37.94 3,967.01 24.62%
0.00 0.00 0.00 0.00 0.00%
0.00 0.00 0.00 0.00
14.00 67,232.76 14.00 67,232.76 100.00%
0.00 0.00 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00%
106.16 299,164.19 110.76 312,127.22 55.98%
376,194.82 389,157.85 25.90%

0.00 0.00 0.00 0.00 0.00%


0.00 0.00 0.00%

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
6.00 113,019.30 6.00 113,019.30 100.00%
0.00 0.00 25.00 25,220.00 100.00%
0.00 0.00 0.00 0.00 0.00%

Página No. 8
D DE CATACAMAS, DEPARTAMENTO DE ESTIMACIÓN No. : 02
PERIODO: DEL 01/12/16 AL 31/12/16

EJECUTADO ESTE PERIODO TOTAL ACUMULADO


% EJEC.
CANTIDAD TOTAL CANTIDAD TOTAL
113,019.30 138,239.30 77.54%

0.00 0.00 1.00 604,615.27 100.00%


0.00 604,615.27 100.00%
### 9,571,006.58 56.54%
### 9,571,006.58 56.54%

2,652,573.92

SUPERVISION

Página No. 9
REPUBLICA DE HONDURAS
SECRETARIA DE ESTADO EN LOS DESPACHOS DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
DIRECCION GENERAL DE CARRETERAS
MATERIALES ALMACENADOS CORRESPONDIENTE A LA ESTIMACION No. 09

PROYECTO: "CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA


PROYECTO: LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE Err:509
CATACAMAS, DEPARTAMENTO DE OLANCHO"
CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. FECHA: 31 DE JULIO DE 2014

INVENTARIO ANTERIOR ENTRADA DE MATERIALES MAT.INCORPORADOS EN OBRA INVENTARIO A LA FECHA


PRECIO
MATERIALES UNIDAD
UNITARIO LPS. CANTIDAD VALOR LPS. CANTIDAD VALOR LPS CANTIDAD VALOR LPS. CANTIDAD VALOR LPS

GRAVA 1 1/2" M3 151.00 2,047.26 309,136.26 - - 336.22 50,769.22 2,383.48 359,905.48

GRAVA 3/4" M3 151.00 3,892.64 587,788.64 - - 336.22 50,769.22 4,228.86 638,557.86

ARENA TRITURADA M3 151.00 1,986.96 300,030.96 4,000.00 604,000.00 672.44 101,538.44 6,659.40 1,005,569.40

TUBO SDR 50 DE 10" LANCE 1,761.43 - - - - - -

TUBO SDR 50 DE 8" LANCE 1,017.81 - - - - - -

TUBO SDR 50 DE 4" LANCE 301.36 - - - - - -

TUBO SDR 26 DE 3" LANCE 337.58 98.00 33,082.84 - - 98.00 33,082.84

TUBO SDR 26 DE 4" LANCE 557.84 - - - - - -

TUBO SDR 51 DE 10" LANCE 1,761.43 - - - - - -

TUBO SDR 26 DE 6" LANCE 1,196.63 - - - - - -

TOTAL . . . 1,230,038.70 604,000.00 203,076.88 2,037,115.58

Materiales Almacenados Periodo Anterior Lps. 1,230,038.70


Mas Materiales Almacenados Este Periodo Lps. 604,000.00
Menos Materiales Incorporados a la Obra Lps. 203,076.88
Inventario de Materiales a la Fecha Lps. 2,037,115.58

CONTRATISTA CONSULTOR

COORDINADOR JEFE DEPTO. CONSTRUCCION

APROBADO: ____________________________
DIRECTOR DE CARRETERAS
PROYECTO: "CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO"

CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. DATOS FACTORES DEL MES


So = SALARIO MÍNIMO FECHA DE LICITACIÓN Lps. 231.47 FAM=[0.7*(S/So)+0.3*(IPC/IPCo)-1] 0.1430
SUPERVISIÓN: CONSTRUCCION Y SUPERVISION DAVINCI S DE RL CV S = SALARIO MÍNIMO FECHA DE ESTIMACIÓN Lps. 266.87 FAE=[DV/DVo-1] 0.0684
Err:509 Do = PRECIO DIESEL FECHA LICITACIÓN Lps. 84.9200 FACL=[D/Do-1] 0.1032
FECHA DE LICITACIÓN: 30 DE AGOSTO DE 2012 D = PRECIO DIESEL FECHA ESTIMACIÓN Lps. 93.6868
ESCALAMIENTO DE COSTOS IPCo = INDICE DE PRECIOS AL CONSUMIDOR FECHA DE LICITACIÓN 239.80
IPC = INDICE DE PRECIOS AL CONSUMIDOR FECHA DE ESTIMACIÓN 268.6000
DVo = VALOR DIVISA FECHA LICITACIÓN Lps. 19.6761
DV = VALOR DIVISA FECHA ESTIMACIÓN Lps. 21.0225

CANTIDAD DEL MANO DE OBRA EQUIPOS Y MAQUINARIA COMBUSTIBLES Y LUBRICANTES


No. DESCRIPCIÓN UNIDAD
PERIODO
P.U. TOTAL TOTAL
IPM FAM FACT. VALOR IPE FAE FACT. VALOR IPCL FACL FACT. VALOR
A Pavimentos
A.9 Aceras de Concreto hidraulico e=10 cm m2 Err:509 532.36 Err:509 0.0860 0.1430 0.0122 Err:509 0.3970 0.0684 0.0271 Err:509 0.3160 0.1032 0.0326 Err:509 Err:509
C Obras de Drenaje
C.5 Tuberia TCR 24" T3 ml Err:509 4,802.34 Err:509 0.2070 0.1430 0.0296 Err:509 0.0650 0.0684 0.0044 Err:509 0.0800 0.1032 0.0082 Err:509 Err:509
C.8 Mamposteria para Drenaje m3 Err:509 2,818.05 Err:509 0.2510 0.1430 0.0358 Err:509 0.1090 0.0684 0.0074 Err:509 0.1210 0.1032 0.0124 Err:509 Err:509
T TOTALES . . . . Err:509 Err:509 Err:509 Err:509 Err:509

SUB-TOTAL ESCALADO Err:509


TOTAL INCREMENTO DE MATERIALES EN EST. Err:509
TOTAL A COBRAR EN EST. Err:509

PONDERACIÓN DE DIESEL PONDERACIÓN DE DIVISA

PERIODO: DEL 01 / JULIO / 14 AL 25 / JULIO / 14 PERIODO: DEL 01 / JULIO / 14 AL 25 / JULIO / 14

DE FECHA A FECHA # DE DÍAS PRECIO IMPORTE DE FECHA A FECHA # DE DÍAS PRECIO IMPORTE
JULIO JULIO JULIO JULIO
1.00 6.00 6.00 93.6900 562.14 1.00 25.00 25.00 21.0225 525.5625
JULIO JULIO
7.00 13.00 7.00 93.7900 656.53 25.00 525.5625
JULIO JULIO
14.00 20.00 7.00 93.8500 656.95
JULIO JULIO P.U. DE LA DIVISA PONDERADO 21.0225
21.00 25.00 5.00 93.3100 466.55

25.00 2,342.17
P.U. DEL DIESEL PONDERADO 93.6868
SECRETARIA DE ESTADO EN LOS DESPACHOS DE INFRAESTRUCTUR
DIRECCION GENERAL DE CARRETERAS
DEPARTAMENTO DE CONSTRUCCION

PROYECTO: "CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD AP


CATACAMAS, DEPARTAMENTO DE OL

CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V.


Err:509
Err:509

INCREMENTO DE COSTOS DE MATERIALE

No CONCEPTO CANTIDAD MATERIAL UNIDAD


DEL PERIODO
A Pavimentos
C.5 Tuberia TCR 24" T3 Err:509 Cemento Kg
C.8 Mamposteria para Drenaje Err:509 Cemento Kg
S DESPACHOS DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
ECCION GENERAL DE CARRETERAS
PARTAMENTO DE CONSTRUCCION

S, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE


S, DEPARTAMENTO DE OLANCHO"

MENTO DE COSTOS DE MATERIALES

CANTIDAD P.U FECHA P.U FECHA DIFERENCIA TOTAL


A RECONOCER LICITACION ACTUAL INCREMENTO

142.3750 4.25 5.07 0.82 Err:509


29.5423 4.25 5.07 0.82 Err:509
TOTAL DE INCREMENTO DE MATERIALES LPS Err:509
REPÚBLICA DE HONDURAS

DIRECCION GENERAL DE CARRETERAS


MATERIALES ALMACENADOS CORRESPONDIENTE A LA ESTIMACION No. 13

PROYECTO:
#REF!
CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. FECHA: 31 DE AGOSTO DE 2015

INVENTARIO ANTERIOR ENTRADA DE MATERIALES MAT.INCORPORADOS EN OBRA INVENTARIO A LA FECHA


PRECIO
MATERIALES UNIDAD
UNITARIO LPS. CANTIDAD VALOR LPS. CANTIDAD VALOR LPS CANTIDAD VALOR LPS. CANTIDAD VALOR LPS

GRAVA 1 1/2" M3 151.00 715.03 107,969.53 - - - - 715.03 107,969.53

GRAVA 3/4" M3 151.00 2,614.41 394,775.91 - - - - 2,614.41 394,775.91

ARENA TRITURADA M3 151.00 3,174.81 479,396.31 - - - - 3,174.81 479,396.31

TUBO SDR 50 DE 10" LANCE 1,761.43 - - - - - -

TUBO SDR 50 DE 8" LANCE 1,017.81 - - - - - -

TUBO SDR 50 DE 4" LANCE 301.36 - - - - - -

TUBO SDR 26 DE 3" LANCE 337.58 - - - - - - -

TUBO SDR 26 DE 4" LANCE 557.84 - - - - - -

TUBO SDR 51 DE 10" LANCE 1,761.43 - - - - - -

TUBO SDR 26 DE 6" LANCE 1,196.63 - - - - - -

TOTAL . . . 982,141.75 - - 982,141.75

Materiales Almacenados Periodo Anterior Lps. 982,141.75


Mas Materiales Almacenados Este Periodo Lps. 0.00
Menos Materiales Incorporados a la Obra Lps. 0.00
Inventario de Materiales a la Fecha Lps. 982,141.75

CONTRATISTA CONSULTOR

COORDINADOR JEFE DEPTO. CONSTRUCCION

APROBADO: ____________________________
DIRECTOR DE CARRETERAS
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

" CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN
PROYECTO:
LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO "

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

Remoción de Carpeta existente


ESTACIÓN ANCHO AREA FINAL
ITEM DISTANCIA (M) % Ejecutado SUB TOTAL A COBRAR
INICIAL (M) (M2)
1 0+000 20.00 7.300 146.000 100% 146.00
2 0+020 20.00 7.300 146.000 100% 146.00
3 0+040 20.00 7.300 146.000 100% 146.00
4 0+060 20.00 7.300 146.000 100% 146.00
5 0+080 20.00 7.300 146.000 100% 146.00
6 0+100 20.00 7.300 146.000 100% 146.00
7 0+120 20.00 7.300 146.000 100% 146.00
8 0+140 20.00 7.300 146.000 100% 146.00
9 0+160 20.00 7.300 146.000 100% 146.00
10 0+180 20.00 7.300 146.000 100% 146.00
11 0+200 20.00 7.300 146.000 100% 146.00
12 0+220 20.00 7.300 146.000 100% 146.00
13 0+240 20.00 7.300 146.000 100% 146.00
14 0+260 20.00 7.300 146.000 100% 146.00
15 0+280 20.00 7.300 146.000 100% 146.00
16 0+300 20.00 7.300 146.000 100% 146.00
17 0+320 20.00 7.300 146.000 100% 146.00
18 0+340 20.00 7.300 146.000 100% 146.00
19 0+360 20.00 7.300 146.000 100% 146.00
20 0+380 20.00 7.300 146.000 100% 146.00
21 0+400 20.00 7.300 146.000 100% 146.00
22 0+420 20.00 7.300 146.000 100% 146.00
23 0+440 20.00 7.300 146.000 100% 146.00
24 0+460 20.00 7.300 146.000 100% 146.00
25 0+480 20.00 7.300 146.000 100% 146.00
26 0+500 20.00 7.300 146.000 100% 146.00
27 0+520 20.00 7.300 146.000 100% 146.00
28 0+540 20.00 7.300 146.000 100% 146.00
29 0+560 20.00 7.300 146.000 100% 146.00
30 0+580 20.00 7.300 146.000 100% 146.00
31 0+600 20.00 7.300 146.000 100% 146.00
32 0+620 20.00 7.300 146.000 100% 146.00
33 0+640 20.00 7.300 146.000 100% 146.00
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

" CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN
PROYECTO:
LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO "

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

Remoción de Carpeta existente


ESTACIÓN ANCHO AREA FINAL
ITEM DISTANCIA (M) % Ejecutado SUB TOTAL A COBRAR
INICIAL (M) (M2)
34 0+660 20.00 7.300 146.000 100% 146.00
35 0+680 20.00 7.300 146.000 100% 146.00
36 0+700 20.00 7.300 146.000 100% 146.00
37 0+720 20.00 7.300 146.000 100% 146.00
38 0+740 20.00 7.300 146.000 100% 146.00
39 0+760 20.00 7.300 146.000 100% 146.00
40 0+780 20.00 7.300 146.000 100% 146.00
41 0+800 20.00 7.300 146.000 100% 146.00
42 0+820 20.00 7.300 146.000 100% 146.00
43 0+840 20.00 7.300 146.000 100% 146.00
44 0+860

TOTAL ACUMULADO (M2) REMOCION DE CARPETA 6,278.00


TOTAL (M ) REMOCION DE CARPETA PERIODO ANTERIOR
2
-
TOTAL (M2 )REMOCION DE CARPETA PERIODO ACTUAL 6,278.00

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiemb

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CA
PROYECTO:
DEPARTAMENTO DE OLANCHODE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMAC

Excavación Común
ESTACIÓN ESTACIÓN AREA AREA FINAL AREA PRO. VOLUMEN % Ejecutado
ITEM DISTANCIA
INICIAL FINAL INICIAL (M2) (M2) (M2) (M3)
01 0+000 0+020 20.00 8.420 3.8200 6.12 122.40 100%
02 0+020 0+040 20.00 3.820 4.2200 4.02 80.40 100%
03 0+040 0+060 20.00 4.220 4.0100 4.12 82.40 100%
04 0+060 0+080 20.00 4.010 3.8200 3.92 78.40 100%
05 0+080 0+100 20.00 3.820 3.4900 3.66 73.20 100%
06 0+100 0+120 20.00 3.490 4.0300 3.76 75.20 100%
07 0+120 0+140 20.00 4.030 4.2900 4.16 83.20 100%
08 0+140 0+160 20.00 4.290 4.9300 4.61 92.20 100%
09 0+160 0+180 20.00 4.930 5.9200 5.43 108.60 100%
10 0+180 0+200 20.00 5.920 6.8200 6.37 127.40 100%
11 0+200 0+220 20.00 6.820 7.0800 6.95 139.00 100%
12 0+220 0+240 20.00 7.080 4.4800 5.78 115.60 100%
13 0+240 0+260 20.00 4.480 3.8600 4.17 83.40 100%
14 0+260 0+280 20.00 3.860 4.5600 4.21 84.20 100%
15 0+280 0+300 20.00 4.560 4.7400 4.65 93.00 100%
16 0+300 0+320 20.00 4.740 4.9100 4.83 96.60 100%
17 0+320 0+340 20.00 4.910 4.3500 4.63 92.60 100%
18 0+340 0+360 20.00 4.350 3.7000 4.03 80.60 100%
19 0+360 0+380 20.00 3.700 3.3800 3.54 70.80 100%
20 0+380 0+400 20.00 3.380 2.8300 3.11 62.20 100%
21 0+400 0+420 20.00 2.830 3.1300 2.98 59.60 100%
22 0+420 0+440 20.00 3.130 4.2700 3.70 74.00 100%
23 0+440 0+460 20.00 4.270 4.0100 4.14 82.80 100%
24 0+460 0+480 20.00 4.010 4.1400 4.08 81.60 100%
25 0+480 0+500 20.00 4.140 4.9000 4.52 90.40 100%
26 0+500 0+520 20.00 4.900 4.7800 4.84 96.80 100%
27 0+520 0+540 20.00 4.780 4.9000 4.84 96.80 100%
28 0+540 0+560 20.00 4.900 4.9900 4.95 99.00 100%
29 0+560 0+580 20.00 4.990 6.7000 5.85 117.00 100%
30 0+580 0+600 20.00 6.700 4.3500 5.53 110.60 100%
31 0+600 0+620 20.00 4.350 4.6100 4.48 89.60 100%
32 0+620 0+640 20.00 4.610 4.6200 4.62 92.40 100%
33 0+640 0+660 20.00 4.620 3.6500 4.14 82.80 100%
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiemb

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CA
PROYECTO:
DEPARTAMENTO DE OLANCHODE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMAC

Excavación Común
ESTACIÓN ESTACIÓN AREA AREA FINAL AREA PRO. VOLUMEN % Ejecutado
ITEM DISTANCIA
INICIAL FINAL INICIAL (M2) (M2) (M2) (M3)
34 0+660 0+680 20.00 3.650 3.4200 3.54 70.80 100%
35 0+680 0+700 20.00 3.420 4.0000 3.71 74.20 100%
TOTAL ( M3 )ACUMULADO DE EXCAVACION COMUN
TOTAL (M3 ) EXCAVACION COMUN PERIODO ANTERIOR
TOTAL (M3) EXCAVACION COMUN PERIODO ACTUAL

_________________________________ _______________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
Código:
WEPR-07
Edición: 01
Fecha: 07 Septiembre 2009

A LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS,


AMENTO DE OLANCHODE OLANCHO

ESTIMACIÓN No. : 02

avación Común
SUB - TOTAL
A COBRAR
122.40
80.40
82.40
78.40
73.20
75.20
83.20
92.20
108.60
127.40
139.00
115.60
83.40
84.20
93.00
96.60
92.60
80.60
70.80
62.20
59.60
74.00
82.80
81.60
90.40
96.80
96.80
99.00
117.00
110.60
89.60
92.40
82.80
Código:
WEPR-07
Edición: 01
Fecha: 07 Septiembre 2009

A LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS,


AMENTO DE OLANCHODE OLANCHO

ESTIMACIÓN No. : 02

avación Común
SUB - TOTAL
A COBRAR
70.80
74.20
3,159.80
2,229.80
930.00

###

_________________________________
Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE DE CONCRETO WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

PROYECTO: CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

Pavimento concreto hidraulico e=17cm

ITEM ESTACIÓN DIST. (M) ESPESOR ANCHO ANCHO SOBRE ANCHO SOBRE ANCHO ANCHO AREA (M2) % EJEC. SUB TOTAL A COBRAR OBS.
(M) DER. (M) IZQ. (M) DERECHO (M) IZQUIERDO (M) TOTAL (M)
01 0+000.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
02 0+020.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
03 0+040.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
04 0+060.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
05 0+080.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
06 0+100.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
07 0+120.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
08 0+140.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
09 0+160.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
10 0+180.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
11 0+200.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
12 0+220.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
13 0+240.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
14 0+260.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
15 0+280.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
16 0+300.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
17 0+320.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
18 0+340.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
19 0+360.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
20 0+380.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
21 0+400.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
22 0+420.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
23 0+440.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
24 0+460.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
25 0+480.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
26 0+500.00 20.00 0.17 7.30 7.30 14.60 292.00 100% 292.00
TOTAL (M2) ACUMULADO PAVIMENTO CON CONCRETO DE 4,000 PSI 7,592.00
TOTAL (M2) DE CONCRETO PERIODO ANTERIOR
TOTAL (M2) DE CONCRETO EN EL PERIODO ACTUAL 7,592.00

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
HOJA DE SOPORTE DE SUB BASE
Elaborado por: Aprobado por:
Página 1 de
Asistente de Ingeniería Gerente de Proyectos

PROYECTO: CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD

PERIODO: DEL 01/12/16 AL 31/12/16

Sub Base

ESPESOR ANCHO ANCHO SOBRE ANCHO SOBRE ANCHO ANCHO AREA (M2)
ITEM ESTACIÓN DIST. (M) SUB SUB BASE
(M2) RASANTE DER. (M) IZQ. (M) TOTAL (M)
(M2)
1 0+000.00 20.00 0.19 15.300 15.300 15.30 306.00
2 0+020.00 20.00 0.19 15.300 15.300 15.30 306.00
3 0+040.00 20.00 0.19 15.300 15.300 15.30 306.00
4 0+060.00 20.00 0.19 15.300 15.300 15.30 306.00
5 0+080.00 20.00 0.19 15.300 15.300 15.30 306.00
6 0+100.00 20.00 0.19 15.300 15.300 15.30 306.00
7 0+120.00 20.00 0.19 15.300 15.300 15.30 306.00
8 0+140.00 20.00 0.19 15.300 15.300 15.30 306.00
9 0+160.00 20.00 0.19 15.300 15.300 15.30 306.00
10 0+180.00 20.00 0.19 15.300 15.300 15.30 306.00
11 0+200.00 20.00 0.19 15.300 15.300 15.30 306.00

12 0+220.00 20.00 0.19 15.300 15.300 15.30 306.00


13 0+240.00 20.00 0.19 15.160 15.160 15.16 303.20
14 0+260.00 20.00 0.19 14.880 14.880 14.88 297.60

15 0+280.00 20.00 0.19 14.600 14.600 14.60 292.00


16 0+300.00 20.00 0.19 14.600 14.600 14.60 292.00
17 0+320.00 20.00 0.19 14.600 14.600 14.60 292.00
18 0+340.00 20.00 0.19 14.600 14.600 14.60 292.00
19 0+360.00 20.00 0.19 14.600 14.600 14.60 292.00
20 0+380.00 20.00 0.19 14.600 14.600 14.60 292.00
21 0+400.00 20.00 0.19 14.600 14.600 14.60 292.00
22 0+420.00 20.00 0.19 14.600 14.600 14.60 292.00
23 0+440.00 20.00 0.19 14.600 14.600 14.60 292.00
24 0+460.00 20.00 0.19 14.600 14.600 14.60 292.00
25 0+480.00 20.00 0.19 14.600 14.600 14.60 292.00

26 0+500.00 20.00 0.19 14.600 14.600 14.60 292.00


TOTAL (M DE SUB BASE
3)

TOTAL (M3) DE SUB BASE COBRADO


TOTAL (M3 )DE SUB BASE A COBRAR ESTA ESTIMACION
HOJA DE SOPORTE DE SUB BASE
Elaborado por: Aprobado por:
Página 1 de
Asistente de Ingeniería Gerente de Proyectos

PROYECTO: CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD

PERIODO: DEL 01/12/16 AL 31/12/16

Sub Base

ESPESOR ANCHO ANCHO SOBRE ANCHO SOBRE ANCHO ANCHO AREA (M2)
ITEM ESTACIÓN DIST. (M) SUB SUB BASE
(M2) RASANTE DER. (M) IZQ. (M) TOTAL (M)
(M2)

_________________________________ _
Vo. Bo. Contratista
Código:
DE SUB BASE WEPR-07
Edición: 01
Página 1 de 3
Fecha: 07 Septiembre 2009

XIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

ESTIMACIÓN No. : 02

ub Base

VOL. % EJEC. SUB TOTAL OBS.


(M3) A COBRAR

58.14 100% 58.14


58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14
58.14 100% 58.14

inicio de transicion de
15.3 mts a 14.60 mts
58.14 100% 58.14
57.61 100% 57.61
56.54 100% 56.54

final de transicion de
15.3 mts a 14.60 mts
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48
55.48 100% 55.48

inicio de transicion de
14.6 mts a 15.30 mts
55.48 100% 55.48
1,477.59
DO
STIMACION 1,477.59
Código:
DE SUB BASE WEPR-07
Edición: 01
Página 1 de 3
Fecha: 07 Septiembre 2009

XIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

ESTIMACIÓN No. : 02

ub Base

VOL. % EJEC. SUB TOTAL OBS.


(M3) A COBRAR

_________________________________
Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE CORTE DE JUNTAS WEPR-07
Elaborado por: Aprobado por: Edición: 01
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML;


PROYECTO:
LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

Err:509 Err:509

PINTURA ACRILICA

LONGITU DE BORDILLOS
No. EST. INICIAL EST. FINAL LADO LONGITUD EN ACCESOS

01 0+000 0+100 L.D.-D. 100.00 2.20


02 0+000 0+92.70 L.I.-I. 92.70 0.00
03 0+000 0+095 - 191.90 0.00
04 0+125 0+236.38 L.D.-D. 111.38 9.72
05 0+122 0+229.24 L.I.-I. 107.24 14.51
06 0+124.45 0+230.35 - 214.00 0.00
07 0+250 0+338.28 L.D.-D. 88.28 14.50
08 0+250 0+333.74 L.I.-I. 83.74 13.93
09 0+255 0+327.50 - 145.96 0.00
10 0+360 0+450.90 L.D.-D. 90.90 15.50
11 0+465 0+516.98 L.D.-D. 51.98 17.35
12 0+350 0+496.35 L.I.-I. 146.35 15.50
13 0+359.27 0+500 - 275.84 0.00
14 0+540 0+793.4 L.D.-D. 253.40 8.00
15 0+525.88 0+740.10 L.I.-I. 107.11 6.00
16 0+555 0+806 - 503.10 0.00
TOTAL ML

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervision
TOTAL (ML) OBSERVACION

102.20
92.70
191.90 Bordillo doble en mediana
121.10
121.75
214.00 Bordillo doble en mediana
102.78
97.67
145.96 Bordillo doble en mediana
106.40
69.33
161.85
275.84 Bordillo doble en mediana
261.40
113.11 Bordillo intermedio
503.10 Bordillo doble en mediana
2,681.09

_____
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE
PROYECTO:
OLANCHODE OLANCHODE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

Conformacion Subrazante Sub base

ITEM ESTACIÓN ESTACIÓN DISTANCIA ANCHO ANCHO ANCHO AREA (M2) % Ejecutado # ESTIM. SUB TOTAL A COBRAR
INICIAL FINAL (M) INICIAL FINAL PROMEDIO
01 0+000 0+020 20.00 15.300 15.300 15.300 306.00 100% 306.00
02 0+020 0+040 20.00 15.300 15.300 15.300 306.00 100% 306.00
03 0+040 0+060 20.00 15.300 15.300 15.300 306.00 100% 306.00
04 0+060 0+080 20.00 15.300 15.300 15.300 306.00 100% 306.00
05 0+080 0+100 20.00 15.300 15.300 15.300 306.00 100% 306.00
06 0+100 0+120 20.00 15.300 15.300 15.300 306.00 100% 306.00
07 0+120 0+140 20.00 15.300 15.300 15.300 306.00 100% 306.00
08 0+140 0+160 20.00 15.300 15.300 15.300 306.00 100% 306.00
09 0+160 0+180 20.00 15.300 15.300 15.300 306.00 100% 306.00
10 0+180 0+200 20.00 15.300 15.300 15.300 306.00 100% 306.00
11 0+200 0+220 20.00 15.300 15.300 15.300 306.00 100% 306.00
12 0+220 0+240 20.00 15.300 15.300 15.300 306.00 100% 306.00
13 0+240 0+260 20.00 15.160 15.160 15.160 303.20 100% 303.20
14 0+260 0+280 20.00 14.880 14.880 14.880 297.60 100% 297.60
15 0+280 0+300 20.00 14.600 14.600 14.600 292.00 100% 292.00
16 0+300 0+320 20.00 14.600 14.600 14.600 292.00 100% 292.00
17 0+320 0+340 20.00 14.600 14.600 14.600 292.00 100% 292.00
18 0+340 0+360 20.00 14.600 14.600 14.600 292.00 100% 292.00
19 0+360 0+380 20.00 14.600 14.600 14.600 292.00 100% 292.00
20 0+380 0+400 20.00 14.600 14.600 14.600 292.00 100% 292.00
21 0+400 0+420 20.00 14.600 14.600 14.600 292.00 100% 292.00
22 0+420 0+440 20.00 14.600 14.600 14.600 292.00 100% 292.00
23 0+440 0+460 20.00 14.600 14.600 14.600 292.00 100% 292.00
24 0+460 0+480 20.00 14.600 14.600 14.600 292.00 100% 292.00
25 0+480 0+500 20.00 14.600 14.600 14.600 292.00 100% 292.00
26 0+500 0+520 20.00 14.600 14.600 14.600 292.00 100% 292.00
TOTAL ACUMULADO (M2) CONFORMACION SUBRAZANTE SUB BASE 7,776.80
TOTAL (M2) PERIODO ANTERIOR CONFORMACION SUB RASANTE
TOTAL (M2) CONFORMACION SUB- RASANTE SUB PERIODO ACTUAL 7,776.80

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
HOJA DE SOPORTE
Elaborado por: Aprobado por:
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA
PROYECTO:
DEPARTAMENTO DE OLANCHO

Err:509

Conformacion Subrazante Sub base


ESTACIÓN ESTACIÓN ANCHO ANCHO ANCHO
ITEM DISTANCIA
INICIAL FINAL INICIAL FINAL PROMEDIO
1 0+000 0+020 20.00 15.300 15.300 15.30
2 0+020 0+040 20.00 15.300 15.300 15.30
3 0+040 0+060 20.00 15.300 15.300 15.30
4 0+060 0+080 20.00 15.300 15.300 15.30
5 0+080 0+100 20.00 15.300 15.300 15.30
6 0+100 0+120 20.00 15.300 15.300 15.30
7 0+120 0+140 20.00 15.300 15.300 15.30
8 0+140 0+160 20.00 15.300 15.300 15.30
9 0+160 0+180 20.00 15.300 15.300 15.30
10 0+180 0+200 20.00 15.300 15.300 15.30
11 0+200 0+220 20.00 15.300 15.300 15.30
12 0+220 0+240 20.00 15.300 15.300 15.30
13 0+240 0+260 20.00 15.300 15.300 15.30
14 0+260 0+280 20.00 15.300 15.300 15.30
15 0+280 0+300 20.00 15.300 15.300 15.30
16 0+300 0+320 20.00 15.300 15.300 15.30
17 0+320 0+340 20.00 15.300 15.300 15.30
18 0+340 0+360 20.00 15.300 15.300 15.30
19 0+360 0+380 20.00 15.300 15.300 15.30
20 0+380 0+400 20.00 15.300 15.300 15.30
21 0+400 0+420 20.00 15.300 15.300 15.30
22 0+420 0+440 20.00 15.300 15.300 15.30
23 0+440 0+460 20.00 15.300 15.300 15.30
24 0+460 0+480 20.00 15.300 15.300 15.30
25 0+480 0+500 20.00 15.300 15.300 15.30
26 0+500 0+520 20.00 15.300 15.300 15.30
27 0+520 0+540 20.00 15.300 15.300 15.30

TOTAL M2 CONFORMACION SUBRAZANTE SUB BASE


TOTAL M2 CONFORMACION SUBRAZANTE SUB BASE COBRADO
TOTAL M2 CONFORMACION SUBRAZANTE SUB BASE A COBRAR

_________________________________ ______________
Vo. Bo. Contratista Vo. Bo.
Código:
WEPR-07
Edición: 01
gina 1 de 3
Fecha: 07 Septiembre 2009

MADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS,


LANCHO

Err:509

b base

AREA % Ejecutado SUB TOTAL A COBRAR

306.00 100% 306.00


306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00
306.00 100% 306.00

SE 8,262.00
BRADO 13,541.80
OBRAR (5,279.80)

_________________________________
Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE
WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

PROYECTO: " CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA
CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO "

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

Colocación de Tuberia de concreto reforzado tipo III diametro de 24 Pulgadas


ESTACIÓN DIAMETRO LONGITUD CANTIDAD LONGITUD TOTAL
ITEM TIPO % EJEC.
INICIAL (PUL) (M) BATERIA (M)
01 0+520 24.00 III 14.000 1 100% 14.00

TOTAL ACUMULADO (M) COLOCACION DE TUBERIA DE 24 PULG. 14.00


TOTAL (M) COLOCACION DE TUBERIA DE 24 PULG EN EL PERIODO ANTERIOR -
TOTAL (M )COLOCACION DE TUBERIA DE 24 PULGADAS PERIODO ACTUAL 14.00

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

" CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML;
PROYECTO:
LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO "

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

EXCAVACION PARA DRENAJES


DIMENSIONES EN METROS
No Estación Volumen m3
Largo Base Corona Ancho prom. Alto Área de Tubo diametro
1 0+520 14.00 2.00 1.500 42.00 24''
TOTAL ACUMULADO (M3) DE EXCAVACION PARA DRENAJE 42.00
TOTAL (M3) EXCAVACION PARA DRENAJE EN EL PERIODO ANTERIOR 0.00
TOTAL (M3 ) EXCAVACION PARA DRENAJE EN EL PERIODO ACTUAL 42.00

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

" CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML;
PROYECTO:
LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO "

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

RELLENO PARA DRENAJES


DIMENSIONES EN METROS
No Estación Volumen m3 Tipo de Obra
Largo Base Corona Ancho prom. Alto Vol. del tubo
1 0+520 14.00 2.00 1.500 4.06 37.94 24''
TOTAL ACUMULADO (M3) DE RELLENO PARA DRENAJE 37.94
TOTAL (M3) RELLENO PARA DRENAJE EN EL PERIODO ANTERIOR 0.00
TOTAL (M3 ) RELLENO PARA DRENAJE EN EL PERIODO ACTUAL 37.94

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
HOJA DE SOPORTE
Elaborado por: Aprobado por:
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos

" CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN L
PROYECTO:
DE OLANCHO "

PERIODO: DEL 01/12/16 AL 31/12/16

Hoja de Resumen de Mampostería para Cabezales


ESTACIÓN LADO FECHA DIAM (pulg) CANTIDAD M3/UND

0+095 derecho noviembre 1 4.60

0+649.20 derecho diciembre 1 99.88

0+520.00 izquierdo diciembre 24 1 3.34


0+520.00 izquierdo diciembre 24 1 2.94
Total m3 de mampostería ejecutada
Total m3 de mampostería cobrada
Total m3 de mampostería a cobrar

_________________________________ _____________________
Vo. Bo. Contratista Vo. Bo. Supervi
Código:
WEPR-07
Edición: 01
Fecha: 07 Septiembre 2009

ADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO


NCHO "

ESTIMACIÓN No. : 02

ara Cabezales
VOLUMEN (TUBO) VOLUMEN (M3) OBSERVACIÓN
mamposteria de
- 4.60 muro
mamposteria de
- 99.88 muro

- 3.34 cabezal de entrada


- 2.94 cabeza de salida
110.76
4.60
106.16

_________________________________
Vo. Bo. Supervisión
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD
PROYECTO:
DE CATACAMAS, DEPARTAMENTO DE OLANCHO

Err:509 0

ACERAS (M2)

# ESTACION ESTACION LADO LONGITUD ANCHO TOTAL M2


INICIAL FINAL
1 0+126.40 0+237.55 L.I. 111.15 0.70 77.81
0+165 0+190.92
2 L.I. 25.92 2.48 64.28
3 L.I. 3.77 0.60 2.26
4 L.I. 3.25 0.80 2.60
5 L.I. 3.75 0.60 2.25
6 L.I. 8.55 1.12 9.58
0+224.00 0+500.00 0.00
7 L.I. 10.67 1.50 16.01
8 L.I. 4.61 1.30 5.99
9 L.I. 8.60 0.66 5.68
10 L.I. 5.90 0.36 2.12
11
12 L.D. 12.24 0.25 3.05
13 L.I. 1.20 1.37 1.64
14 L.I. 0.94 1.50 1.41
15 L.I. 0.87 1.40 1.22
16 L.I. 3.20 0.80 2.56
17 L.I. 0.90 1.70 1.53
18 L.I. 3.20 0.80 2.56
19 L.I. 1.15 1.20 1.38
20
21 L.I. 1.38 1.45 2.00
22 L.I. 1.46 1.90 2.77
23 L.I. 1.00 2.00 2.00
24 L.I. 1.05 2.10 2.21
25 L.I. 1.00 2.20 2.20
26 L.I. 3.12 1.12 3.49
27 L.I. 2.10 1.76 3.70
28 L.I. 1.30 2.00 2.60
0+700.00 0+740.00 L.D. 3.25 1.98 6.44
29
30
TOTAL: 231.33
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Aprobado por: Edición: 01
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos Fecha: 07 Septiembre 2009

PROYECTO: CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02

Bordillos

No. EST. INICIAL EST. FINAL LADO LONGITUD LONGITU DE BORDILLOS TOTAL (ML) OBSERVACION
EN ACCESOS

01 0+000 0+100 L.D.-D. 100.00 2.20 102.20


02 0+000 0+92.70 L.I.-I. 92.70 0.00 92.70
03 0+000 0+095 - 191.90 0.00 191.90 Bordillo doble en mediana
TOTAL ACUMULADO (ML) EN COLOCACION DE BORDILLOS 386.80
TOTAL (ML) COLOCACION DE BORDILLO PERIODO ANTERIOR
TOTAL (ML) COLOCACION DE BORDILLO PERIODO ACTUAL 386.80

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
HOJA DE SOPORTE
Elaborado por: Aprobado por:
Página 1 de 3
Asistente de Ingeniería Gerente de Proyectos

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA


PROYECTO: DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE
OLANCHO

Periodo: #REF!

Bordillos
No. EST. INICIAL EST. FINAL LONGITUD (ML)
1 0+000.00 0+520.00 2,080.00
-
-
-
Total ml 2,080.00
Menos pagado estimación anterior 2,681.09
A pagar en esta estimación (601.09)

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervisión
_________________________________
Vo. Bo. Supervisión
REPUBLICA DE HONDURAS
SECRETARIA DE ESTADO EN LOS DESPACHOS DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
DIRECCION GENERAL DE CARRETERAS
MATERIALES ALMACENADOS CORRESPONDIENTE A LA ESTIMACION No. 09

PROYECTO: "CONSTRUCCION Y PAVIMENTACION DE LA CARRETERA


PROYECTO: CATACAMAS - CUEVAS DE TALGUA, CON UNA LONGITUD APROXIMADA DE PERIODO: DEL 01 / JULIO / 14 AL 25 / JULIO / 14
8.93 KILOMETROS, LOCALIZADA EN EL DEPARTAMENTO DE OLANCHO"
CONTRATISTA: CONSTRUCTORA WILLIAM Y MOLINA S. A. DE C. V. FECHA: 31 DE JULIO DE 2014

INVENTARIO ANTERIOR ENTRADA DE MATERIALES MAT.INCORPORADOS EN OBRA INVENTARIO A LA FECHA


PRECIO
MATERIALES UNIDAD
UNITARIO LPS. CANTIDAD VALOR LPS. CANTIDAD VALOR LPS CANTIDAD VALOR LPS. CANTIDAD VALOR LPS

GRAVA 1 1/2" M3 151.00 2,047.26 309,136.26 - - - 2,047.26 309,136.26

GRAVA 3/4" M3 151.00 3,892.64 587,788.64 - - - 3,892.64 587,788.64

ARENA TRITURADA M3 151.00 1,986.96 300,030.96 - - - 1,986.96 300,030.96

TUBO SDR 50 DE 10" LANCE 1,761.43 - - - - - -

TUBO SDR 50 DE 8" LANCE 1,017.81 - - - - - -

TUBO SDR 50 DE 4" LANCE 301.36 - - - - - -

TUBO SDR 26 DE 3" LANCE 337.58 98.00 33,082.84 - - 98.00 33,082.84

TUBO SDR 26 DE 4" LANCE 557.84 - - - - - -

TUBO SDR 51 DE 10" LANCE 1,761.43 - - - - - -

TUBO SDR 26 DE 6" LANCE 1,196.63 - - - - - -

TOTAL . . . 1,230,038.70 - - 1,230,038.70

Materiales Almacenados Periodo Anterior Lps. 1,230,038.70


Mas Materiales Almacenados Este Periodo Lps. 0.00
Menos Materiales Incorporados a la Obra Lps. 0.00
Inventario de Materiales a la Fecha Lps. 1,230,038.70

CONTRATISTA CONSULTOR

COORDINADOR JEFE DEPTO. CONSTRUCCION

APROBADO: ____________________________
DIRECTOR DE CARRETERAS
HOJA DE SOPORTE
Elaborado por: Aprobado por:
Asistente de Ingeniería Gerente de Proyectos

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO
PROYECTO:
CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

Err:509
Demolicion de Pavimentos existentes
ESTACIÓN ESTACIÓN
LADO LONGITUD Ancho Area
INICIAL FINAL
Izq.
Der
TOTAL M2 demolicion de pavimentos existentes

_________________________________ _______________________
Vo. Bo. Contratista Vo. Bo. Supervisio
Código:
WEPR-07
Edición: 01
Fecha: 07 Septiembre 2009

APROXIMADA DE 900 ML; LOCALIZADO EN LA


TO DE OLANCHO

Err:509

SUB TOTAL A
% EJECUTADO COBRAR

_________________________________
Vo. Bo. Supervision
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Edición: 01
Asistente de Ingeniería Fecha: 07 Septiembre 2009

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD


PROYECTO: APROXIMADA DE 900 ML; LOCALIZADO EN LA CIUDAD DE CATACAMAS,
DEPARTAMENTO DE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02


Arboles a cortar
ESTACIÓN SUB TOTAL A
LADO ESTACION FINAL CANTIDAD
INICIAL COBRAR
Izq. 0+000.00 1+000.00 25 25.00
TOTAL arboles a cortar 25.00
TOTAL arboles a cortar cobrados -
TOTAL arboles a cortar a cobrar 25.00

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervision
Código:
HOJA DE SOPORTE WEPR-07
Elaborado por: Edición: 01
Asistente de Ingeniería Fecha: 07 Septiembre 2009

CONSTRUCCION DE BULEVAR EN CATACAMAS, CON UNA LONGITUD APROXIMADA DE 900 ML; LOCALIZADO
PROYECTO:
EN LA CIUDAD DE CATACAMAS, DEPARTAMENTO DE OLANCHO

PERIODO: DEL 01/12/16 AL 31/12/16 ESTIMACIÓN No. : 02


Movilizacion de postes
ESTACIÓN TOTAL A
NUMERO LADO Cantidad % EJECUTADO
INICIAL COBRAR
1 0+557.20 centro 1 100% 1
2 0+612.60 centro 1 100% 1
3 0+653.70 centro 1 100% 1
4 0+702.10 centro 1 100% 1
5 0+752.90 centro 1 100% 1
6 0+800.50 centro 1 100% 1
TOTAL movilizacion de postes 6.00
TOTAL movilizacion de postes cobrado 0.00
TOTAL movilizacion de postes a cobrar 6.00

_________________________________ _________________________________
Vo. Bo. Contratista Vo. Bo. Supervision