You are on page 1of 38
Agreement And Conditions Of PAM Contract 2006 (Without Quantities) ‘Table of Contents Articles Of Agreement Preliminary Recitals Articles Article Article 2 Article 3 Article 4 Article 5 Astle 6 Atle 7 Aaticle 8 Date of agreement Parties to agreement and their addresses ‘The nature of the works andthe location The drawings Contactors Obfigeions Contract Sum Architect Engineer Quantity Surveyor Specialist Consultant Definitions Meanings Attestation/Signatories Of The Partios ‘The Conditions Of Contract Clause 10 t 12 13 4 20 21 22 23 2a 30 3 Contractor's Obligations ‘Completion of Works in accordance with Contract Docaments| ‘Temporary work and construction method Contractor's design and responsibilities Diserepancy or divergence between documents Architect's Instructions (‘AP Contractor to comply with Al AL Provisions empowering instructions Failure of Contractor to comply with AT Contract Documents, Progr Contact Docurnents Custody of tender documents Copies of documents Further drawings or details Works Programme Programme not pert of Contract Architect's acceptance of programme ‘Availability of documents Limitation of use of documents ‘As-built Drawings and operation and maintenance manuals Statutory Obligations, Notices, Fees And Charges Statutory requirements Inconsistencies with statutory requirements PAM Contract 2006 (Without Quantities) Page ‘Table of Contents (Cont'd) ‘The Conditions Of Contraet (Cont'd) Clause 43 44 so 3 60 61 62 63 6a 65 66 67 68 100 104 102 110 HI n2 n3 a us 16 47 Hg. ng. 120 RI 122 130 Ba 140 lat 142 43 144 150 151 152 153 134 Conforming to statutory obligations Fees, levies and charges Levels And Setting Out Of The Works Setting out ‘Materials, Goods And Workmanship To Conform To Description, Testing And Inspection Standards of works, materials, goods and workmanship Provision of vouchers Inspection and testing Contractor's obligation not relieved Work notin accordance with the Contract ‘No compensation for time and cost Failure of Contracior to comply ‘Warranties in respect of materials and goods Royalties And Intellectual Property Rights Indemnity to Employer Contractors Fablity to pay Government royalties Site Agent Site Agent Instructions to Site Agent “Exclusion of Person employed on the Works ‘Access To The Works ‘Access tothe Works Site Staft Duty of Site Staff Directions given by Si Staff Variations, Provisional And Prime Cost Sums Definition of Variation [No Variations required by Architect shal vi Issue of Variations after Practical Completion ‘Alon P.C. Sums and Prov Valuation of V Valuation rules ‘Additional expense caused by Variation ‘Access to Contractor's books and documents ‘Variations and addtional expenses added to Contract Sum ‘Quality And Quantity Of The Works Quality and quantity of the Works ‘Lamp Sum Contract Contract Sum Contract Stam not to be adjusted or altered Materials And Goods Matetials and goods not to be removed Materials and goods included in certificates Responsibility for materials and goods ‘Warranty of title of goods and materials Practical Completion And Defects Liability Practical Completion Cerificate of Practical Completion Gontraccor's failure to comply with undertaking Schedule of Defects PAM Contract 2006 (Without Quantities) Page oo

You might also like