Professional Documents
Culture Documents
Over View PDF
Over View PDF
g§`§Ì
VISAKHAPATNAM STEEL PLANT
{demInÅ>U_
VISAKHAPATNAM
{d Eg nr H$m g§{lßV
{ddaU
AN OVER VIEW OF VSP
10.
11.
12.
13.
14.
15.
VSP BELIVES IN THE BEST AND ENDEAVOURS TO GIVE THE BEST
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLANT
CHEMICAL
COAL
COKE OVENS
1.0 AN OVERVIEW OF VSP
TPP
Visakhapatnam. Bestowed with modern technologies, VSP has
SP
CRMP
a installed capacity of 3 Million Tonnes per annum of Liquid Steel
RMHP
RED
Trafic
RMD
and 2.656 Million tonnes of saleable steel. At VSP there is em-
AC & VS
Utlities
MAIN ROAD OR PLANT PLAZA ROAD
phasis on total automation, seamless integration and efficient
PEM
BF
PD
SSD
upgradation, which result in wide range of long and structural
BC Gate
BC ROAD products to meet stringent demands of discerning customers
WMD
SMS
EMD
within India and abroad. VSP products meet exalting Interna-
MILL AROS
tional Quality Standards such as JIS, DIN, BIS, BS etc.
ETL
VSP has become the first integrated Steel Plant in the
EnMD
QATD
WKS CONTS CME
ERS
country to be certified to all the three international standards for
MMSM
11-DNW
Rs
Rs
&
DNW
Tele
quality (ISO-9001), for Environment Management (ISO-14001)
Inst
WRM
FMD
LMMM
LMMM
& for Occupational Health & Safety (OHSAS-18001) The
(W)
ED certificate covers quality systems of all operational, maintenance,
MMSM
MMSM
E.S & F
TS
SED
SPC
H&L
CED
MAIN GATE
VSP by successfully installing & operating efficiently Rs.
CISF Pass Section
460 crores worth of Pollution Control and Environment Control
MAIN GATE
OR
SBI
Project Office
more than 3 million plants has made the Steel Plant, Steel Town-
ship and surrounding areas into a heaven of lush greenery. This
has made Steel Township a greener, cleaner and cooler place,
Building
BUS STOP
Seeds were thus sown for the construction of a modern III. Financial Performance (Rs. Crs.)
& sophisticated Steel Plant having annual capacity of 3.4 Million Year Gross Margin Cash Profit Net Profit
Tonnes of hotmetal. An agreement was signed between Gov- 1998-99 15 (-) 346
ernments of India and the erstwhile USSR on June 12th, 1979 1999-00 252 (-) 130 (-) 562
for setting up of an Integrated Steel Plant to produce structural & 2000-01 504 153 (-) 291
long products on the basis of detailed Project report prepared by 2001-02 690 400 (-) 75
Dr. M.N. Dustur & Company. A Comprehensive revised DPR 2002-03 1,049 915 521
jointly revised by Soviets & Dr. Dastur & Company was submit- 2003-04 2,073 2,024 1,547
ted in Nov' 1980 to Govt. Of India. 2004-05 3,266 3,093 2,008
2 31
% ISTD Award for "Best HR Practices" - 2002 The construction of the Plant started on 1st February
1982. Government of India on 18th Feb'82 formed a new Com-
% Prime Ministers Trophy for "Best Integrated Steel
pany called Rashtriya lspat Nigam Ltd. (RINL) and transferred
Plant-2002-03
the responsibility of constructing, commissioning & operating the
% "World Quality Commitment International Star Award" Plant at Visakhapatnam from Steel Authority of India Ltd. to RINL.
in the Gold category conferred by Business Initiative
Due to poor resource availability, the construction could
Directions, Paris not keep pace with the plans which lead to appreciable revision
% "Organizational Excellence Award" for 2003-04 conferred of the plant cost. In view of the critical fund situation and need to
by INSSAN check further increase in the plant costs, a rationalized concept
was approved which was to cost Rs. 6849 crores based on 4th
% National Energy Conservation Award, 2004 and Special
Quarter of 1988.
Prize from Ministry of Power, Govt. of India.
The rationalized concept was based on obtaining the
The above awards are besides a number of awards at
maximum output from the equipments already installed, planned
the local, regional & national level competitions in the area of
/ ordered for procurement and achieving higher levels of opera-
Quality Circles, Suggestion Schemes etc. tional efficiency and labour productivity. Thus the plant capacity
6.0 Hallmark of Vizag Steel as on organization was limited to 3.0 Million tonnes of Liquid Steel per annum. In
the process one of the Steel Melt Shops and one of the mills
Today, VSP is moving forward with an aura of confidence were curtailed.
and with pride amongst its employees who are determined to
The availability of resources were continued to be lower
give their best for the company to enable it to reach new heights
than what was planned and this further delayed the completion
in organizational excellence. of the construction of the plant. Finally all the units were con-
Futuristic enterprises, academic activity, planned & structed and commissioned by July' 92 at a cost of Rs. 8529
crores. The plant was dedicated to nation by the then prime
progressive residential localities are but few of the plentiful ripple
Minister of India Late Sri P.V. Narasimha Rao.
effects of this transformation and each one of us take immense
pride to uphold the philosophy of mutual (i.e., individual and Since Commissioning VSP has already crossed many
mile stones in the fields of production, productivity & exports.
societal) Progress.
Coke rate of the order of 509 Kg/Ton of Hot metal, average con-
vertor life of 2864 heats an average of 23.6 heats per sequence
in continuous Bloom Caster. Specific energy consumption of 6.07
G Kal/ton of liquid steel, a specific refractory consumption of 8.94
30 3
kg and a labour productivity of 265 Ton/man year are some of the Some of the important awards received by VSP are :
peaks achieved (during the year 2004-05) in pursuit of excellence.
% ISO 9002 for SMS and all the downstream units - a
2.1 VSP Technology : State-of-the-Art unique distinction in the Indian Steel Industry.
@ 7 meter tall Coke Oven Batteries with coke dry quenching % Indira Priyadarshini Vriksha Mitra Award - 1992-93
@ Biggest Blast Furnaces in the Country % Nehru Memorial National Award for Pollution Control -
@ Bell-less top charging system in Blast Furnace 1992-93 & 1993-94
@ 100% slag granulation at the BF Cast House % EEPC Export Excellence Award - 1994-95
@ Supressed combustion-LD gas recovery system % Cll (Southern Region) Energy Conservation Award- 1995-96
@ 100% continuous casting of liquid steel. % Golden Peacock (1st Prize) "National Quality Award-96"
IIM in the National Quality Competition - 1996
@ "Tempcore" and "Stelmor" cooling process inLMMM & WRM
respectively % Steel Ministers' Trophy for "Best Safety Performance" - 1996
2.2 Major Sources of Raw Materials % Udyog Excellence Gold Medal Award for Excellence in Steel Industry.
% Excellence Award for outstanding performance in
Raw Material Source
Productivity Management, Quality & Innovation.
Iron Ore Lumps & Fines Bailadilla, MP
% Ispat Suraksha Puraskar (1st Prize) for longest Accident
BF Lime Stone Jaggayyapeta, AP Free Period 1991-94
SMS Lime Stone UAE % Best Labour Management Award from the Govt. of AP
BF Dolomite Madharam, AP % SCOPE Award for Best Turnaround - 2001
SMS Dolomite Madharam, AP % Environment Excellence Award from Greentech
Manganese Ore Chipurupalli, AP Foundation for Energy conservation - 2002
Boiler Coal Talcher, Orissa % Best Enterprise Award from SCOPE, WIPS - 2001-02
Coking Coal Australia % Best Enterprise Award from SCOPE for surpassing MOU
Medium Coking Coal (MCC) Gidi/Swang/Rajarappa/Kargali targets-2003-04
4 29
conveyor belt is collected and sent to Central Stores for 2.3 Water Supply
further disposal. This is helping in earning the revenue Operational water requirement of 36 mgd is being met
through auctioning of the scrap belt sent to stores. from the yeleru Water supply Scheme.
4.16 Central Maintenance Electrical (CME) Dept 2.4 Power Supply
The Function of CME Operation power requirement of 180 to 200 MW is be-
1. Repairs and Maintenance of all the Large Rotating ing met through Capitve Power Plant. The capacity of the power
Electrical machines of the Plant. The job includes plant is 286.5 MW. VSP is exporting 60 MW power to APSEB.
transportation, Overhauling, Re-erection including 2.5 Major Units
precision alignment.
Department Annual Units (3.0 MT Stage)
Capacity
2. Maintenance of electric of all the illumination throughout
('000 T)
the Plant, which includes street lights, tower lights,
Coke Ovens 2,261 3 Batteries of 67 Ovens & 7 Mtrs. Height
security bondy light. Sinter Plant 5,256 2 Sinter Machines of 312 Sq. Mtr. grate area each
Blast Furnace 3,400 2 Furnaces of 3200 Cu. Mtr. volume each
3. Training of Shop Maintenance Crews in the Basics of
Steel Melt Shop 3,000 3 LD Convertors each of 133 Cu. Mtr.
Motor Maintenance and precision alignment.
Volume and Six 4 strand bloom casters
4.17 Steel Township Lmmm 710 4 Strand finishing Mill
WRM 850 2 x 10 strand finishing Mill
The Steel Plant can take pride in having a clean green MMSM 850 6 strand finishing Mill
well planned township with provision of about 8000 quarters, mar-
2.6 Main Products of VSP
kets, community welfare centres, clubs,. Parks etc. for its em-
ployees & their families besides having a modern hospital with 155 beds. Steel Products By-Products
Angles Nut Coke Granulated Slag
5.0 Achivements & Awards Billets Coke Dust Lime Fines
The efforts of VSP have been recognized at various Channels Coal Tar Ammonium Sulphate
Beams Anthracene Oil
forums. Some of the major awards received by VSP are in the Squares HP Napthalence
area of energy conservation, environment protection, safety, Flats Benzene
quality, Circles, Rajbhasha, MOU, sports and a number of awards Rounds Toulene
Re-bars Zylene
at the individual level.
Wire Rods Wash Oil
28 5
3.0 MAJOR DEPARTMENTS quantity etc., are recorded. As all works are carried out
3.1 Raw Material Handling Plant (RMHP) through work order system, accuracy of data is ensured
which enables in reducing the shut down periods.
VSP annually requires quality raw materials viz. Iron Ore,
fluxes (Lime stone, Dolomite), coking and non coking coals etc. 4. The activies of CMM are broadly divided into Planned &
to the tune of 12-13 Million tonnes for producing 3 Million Tonnes Unplanned maintenance and Capital Repairs.
of Liquid Steel. To handle such a large volume of incoming raw
materials received from different sources and to ensure timely Planned & Unplanned activities :
supply of consistent quality of feed materials to different VSP " Planned activities are taken up by planning on
consumers, Raw Material Handling Plant serves a vital function.
regular & periodical interactions with respective
This unit is provided with elaborate unloading, blending, stack-
customer departments.
ing & reclaiming facilities viz. Wagon Tipplers, Ground & Track
Hoppers, Stock yards Crushing plants, Vibrating screens, Single/ " Unplanned/breakdowns are attended immediately
twin boom stickers, wheel on boom and Blender reclaimers. and given top priority over planned jobs to restore
In VSP peripheral unloading has been adopted for the the equipent back to normalcy so as to reduce the
first time in the country. production loss.
3.2 Coke ovens & Coal Chemical Plant (Co&CCP) CAPITAL REPAIRS (CR) :
Blast Furnaces, the mother units of any Steel plant re- " CMM plays an important role in planning &
quire huge quantities of strong, hard and porous solid fuel in the
coordination of CR activities in the plant.
form of hard metallurgical coke for supplying necessary heat for
carrying out the reduction and refining reactions besides acting " Pre-CR activities are given top priority to reduce total
as a reducing agent. shut down periods.
Coke is manufactured by heating of crushed coking coal " Daily feed back and summary of all CR activities
(below 3 mm) in absence of air at temperature of 10000 C and
carried out by CMM are recorded. This system
above for about 16 to 18 hours. A Coke Oven comprise of two
helped in Improving our shut down period.
hollow chambers namely coal chamber and Heating Chamber.
In the heating chamber a gaseous fuel such as Blast Furnace 5. CMM department is playing major role in improving life
Gas, Coke Oven Gas etc. is burnt. The heat so generated is of conveyor belts by adopting innovative technological
conducted through the common wall to heat & carbonize the advancements across the globe.
Coking Coal placed in the adjacent coal chamber.
6. In addition to maintenance activities, as part of Concern
Number of ovens built in series one after the other form
a Coke Oven Battery. towards Environment, solid waste in the form of scrap
6 27
4.15 Central Maintenance Mechanical At VSP there are three Coke Oven Batteries, 7 Metre
tall and having 67 Ovens each. Each oven is having a volume of
1. Central Maintenance Mechnical (CMM) department is
41.6 cu. metre & can hold upto 31.6 Tonnes of dry coal charge.
one of the major service departments in VSP which is
The Carbonization takes place at 1000 - 10500 C in absence of
carrying out major mechanical maintenance and air for 16-18 hours.
conveyor belt replacement activities throughout the plant.
Red Hot Coke is pushed out of the oven and sent to
2. In order to Improve response time CMM activities are Coke Dry Cooling Plants for cooling to avoid its combustion. There
carried out through five zonal offices. They are. are 3 Coke Dry Cooling Plants (CDCP) each having 4 cooling
" Coke Zone : Supports the needs of C & CCD and chambers. The capacity of each cooling chamber is 50-52 TPH.
Nitrogen gas is used as the Cooling medium. The heat recovery
RMHP and the maintenance activities of conveyors
from nitrogen is done by generating steam and expanding in two
through out the plant.
back pressure turbines to produce 7.5 power each.
" Iron Zone : Supports Sinter Plant, Blast Furnace &
The Coal chemicals such as Benzole (& its products),
CRMP in their maintenance activities.
Tar (& its products), Ammonium Sulphate etc. are extracted in
" Steel Zone : Supports SMS & ASP in the maintenance Coal Chemical Plant from C.O. Gas. After recovering the Coal
activities and looks after the maintenance of EOT chemicals the gas is used as a by product fuel by mixing it with
cranes in Central Stores & Gantry cranes of ES & F. gases such as BF Gas, LD Gas etc. A mechanical, biological &
Chemical treatment plant takes care of the effluents.
" Mills Zone : Supports LMMM, WRM & MMSM in their
maintenance activities. 3.3 Sinter Plant (SP)
" Workshop : Looks after maintenance of all Sinter is a hard & porous ferrous material obtained by
agglomeration of Iron Ore fines, Coke breeze, Lime Stone fines,
weighbridges and supports in fabrication works of
Metallurgical wastes viz. Flue dust, mill scale, LD slag etc.
departments like CISF, Finance, Personnel etc.,
Sinter is a better feed material to Blast Furnace in com-
3. CMM is the first maintenance section in VSP, which is
parison to Iron Ore lumps and its usage in Blast furnaces help in
implementing one of the best ten practices i.e., "Work
increasing productivity, decreasing the coke rate & improving the
Flow and Control Management" as a part of QMS. In
quality of Hot Metal produced.
this system internal work order is issued to the respective
Sintering is done in 2 nos. Of 312 Sq. Metre, Sinter Ma-
zone and feedback is received at Central Office after
chines of Dwight Lloyd type by heating the prepared feed on a
work is completed. In the feedback, duration, manpower
continuous metallic belt made of pallets at 1200-13000 C.
and identification of conveyor belt, supplier name &
26 7
Hot Sinter discharged from Sintering machine is crushed to +5 4.13 Electrical Repair Shop (ERS)
mm - 50 mm size and cooled before despatching to Blast Furnaces.
Electrical repair shop is provided for medium & capital
Parameters of Sintering Machines are repair of different types of LT & HT AC motors, DC
_ Effective area : 312 Sq. metre motors, lifting magnets, transformers coils etc. ERS also
_ Sintering area : 276 Sq. metre carries out repair of large electrical eqpt at site. The Shop
_ Sinter bed height : 300 mm has dismantling & assembling section, winding section,
_ Capacity : 450 T P H each varnishing section, testing section etc.
8 25
20) Furnace temperature measurement and control : All three power in each furnace by employing gas expansion turbines.
mills have micro processor based controllers of Toshiba, The two furnaces with their novel circular cast house and
Japan Make. LMMM and WRM are also provided with four tap holes each are capable of producing 9720 tonnes of Hot Metal
microprocessor based recorders whille MMSM is daily or 3.4 Million Tonnes of low sulphur Hot Metal annually.
provided with date acquisition system. LMMM protection/ 3.5.1 Steel Melting Shop (SMS)
starting interlocks are incorporated in PLCs supplied by
Steel is an alloy of Iron with carbon upto 1.8%. Hot Metal
M/s SPA computers. produced in Blast Furnaces contains impurities such as Carbon
21) Boilers: For safe operation of 5 boilers, instrumentation (3.5-4.25%) Silicon (0.4 - 0.5%), Manganese (0.3-0.4%), Sul-
system supplied by M/s BHEL has been installed and is phur (0.04% max) and Phosphorous (0.14% max) is not suitable
in operation. The important systems consists of Furnace as a common Engineering Material. To improve the quality the
Safeguard supervisory System & electro hydraulic impurities are to be eliminated or decreased by oxidation process.
turbine control system. VSP produces steel employing three numbers of top
22) A number of Pump Houses are in operation in various blown Oxygen Convertors called LD Convertors (L & D stand for
zones of the Plant for providing make up water, cooling Linz & Donawitz - two towns in Austria where this process was
water for fire fighting, chiller water pump houses etc. In first adopted) or Basic Oxygen Furnaces/Convertors. Each con-
all the pump houses, instrumentation has been provided vertor is having 133 cu. Metre volume capable of producing 3
for the measurement of flow, pressure, sump level, Million Tonnes of Liquid Steel annually. Besides Hot Metal, Steel
bearing temperature monitoring of motors etc. Scrap, Fluxes such as calcined lime or Dolomite form part of the
charge to the Convertors.
23. A most modern instrumentation lab with the state of the
art calibrators have been set up for repair and calibration 99.5 % pure Oxygen at 15-16 KSCG pressure is blown
of ISO instruments. The master standard instruments in the Convertor through oxygen lance having convergent Diver-
are being regularly calibrated at the national; standard gent copper nozzles at the blowing end. Oxygen oxidises the
laboratories to ensure their accuracy. This lab facilities impurities present in the Hot metal, which are fixed as slag with
are also utilised for repair of all types of instruments used basic fluxes such as lime. During the process heat is generated
in various zones of the plant. by exothermic reactions of oxidation of metalloids viz Si, Mn., P
and Carbon and temperature rises to 17000 C enabling refining
& slag formation.
24 9
Different grades of steel of Superior quality can be made 11) Measurement of temperature at sinter machine hearth
by this process by controlling the Oxygen blow or addition of with ‘S’ type thermocouple.
various ferro alloys or special additives such as Fesi, FeMn, Si-
12) Measurement of pressure and temperature of wind
Mn, Coke Breeze, Aluminum etc. in required quantities while liq-
boxes.
uid steel is being tapped from the convertor into a steel ladle.
13) Measurement at burden handling system: Each BHS has
Convertor/LD Gas produced as by product is used as a
17 nos. of bins - 8 nos. of ore and siner, 6 nos. of coke
secondary fuel.
and 3 nos. for additives.
Characteristics of VSP Convertors :
14) In BHS of BF, SILOPILOT, level measuring system is
Capacity - 150 Tones per heat/blow
provided in the bins.
Volume - 133 Cu. Metre
15) Measurement of Weights of Hopers.
Convertor Sp. Volume - 0.886 Metre Cube per tonne
16) The burden level in the furnance is measured at regular
Tap to Tap Time - 45 mts - 60 mts
interval by means of Selsyn operated stock rod. Top
Height to Diameter ratio - 1.36
pressure is measured and controlled by means of control
Lining i) Working - Tar Dolomite Bricks valves at throttle group of value at GCP.
ii) Permanent - Crome Magnesite Bricks 17) For converter instrumentation, DCS system supplied by
Av. Lining Life - 2445 heats (2004) M/s George Kent, UK has been installed for monitoring
Liquid Steel produced in LD Convertors is solidified in and control of process parameters such as flow,
the form of blooms in continuous Bloom Casters. However, to temperature, pressure, gas analysis.
homogenise the steel and to raise its temperature, if needed,
18) Specialised gas analysers such as H2, O2, CO & CO2
steel is first routed through, Argon rinsing station, IRUT (Injec-
have been provided for analysis and safe operation of
tion Refining & Up temperature) / Ladle Furnaces.
gas recovery plant.
3.5.2 Continuous casting Department (CCD)
19) Measurement of liquid steel temperature : For measuring
Continuous casting may be defined as teaming of liquid
the temperature of liquid steel throw away type
steel in a mould with a false bottom through which partially
solidified ingot/bar (Similar to the shape & cross section of the thermocouples are being used.
mould) is continuously withdrawn at the same rate at which liq-
uid steel is teamed in the mould.
10 23
% Need based standardization, using the above data base. Facilities at a continuous casting machine include a lift
and Turn table for ladles, Copper mould, oscillating system
4) Approval of drawings supplied by Various Suppliers.
tundish, Primary & Secondary Cooling arrangement to cool the
5) Engineering Assitance to all Departments. steel bloom. Gas cutting machines for cutting the blooms in re-
quired lengths (Av. 6 metres long)
4. 12. Instrumentation Department
At VSP we have six-4 strand continuous casting ma-
Instrumentation helps us in monitoring and controlling
chines capable of producing 2.82 Million Tonnes/year Blooms of
the process so that product quality is improved, yeild is size 250 x 250 mm and 250 x 320 mm. Entire quantity of molten
maximised, energy consumption is optimal and safety of the plant steel produced (100%) is continuously cast in radial bloom cast-
is ensured. The important instrumentation system installed in ers which help in energy conservation as well as production of
various zones of VSP are breifly given below: superior quality products.
In addition, it also maintains miscellaneous equipments - 2 horizontal stands / two universal stands
like industrial vaccum cleaners, Hydraulic access platform truck, _ Finishing Train - consists of 6 stands namely
pneumatic tankers, Thermal insulated tankers etc. These - 2 combination stands
transportation equipments are used for transportation of different
- 4 horizontal stands / 4 universal stands
types of materials like Coke, Ores, Limestone, Debris, SMS slag,
The feed material to the mill is 250 x 250 mm size blooms,
bricks, various materials from Stores, tools, tackles etc.
which is heated to rolling temperatures of 1200 0C in two walking
4.10 Power Engineering Maintenance (PEM) beam furnaces. The mill is designed to produce 8,50,000 tons
per annum of various products such as rounds, squares, flats,
Power Engineering Maintenance (PEM) department is
angles (equal & unequal), T bars, channels, IPE beams / HE
doing Capital repairs, Breakdown maintenance, Preventive
beams (Universal beams)
maintenance of Rotary Equipments like Turbo-Generators, Turbo-
4.0 AUXILIARY FACILITIES
blowers, Turbo compressors, high capacity exhausters, fans
pumps and hydraulic coupling. 4.1 Power Generation & Distribution
The average power demands at all units of VSP when
In addition to the above, PEM is also doing INSITU
operating the full capacity will be 221 MW. The captive genera-
Balancing for high speed rotors through out the plant and Tarpedo
tion capacity of 270 MW is sufficient to meet all the plant needs
Laddles maintenance jobs.
in normal operation time. In case of partial outage of captive gen-
eration capacity due to break down, shutdown or other reasons.
20 13
The short fall of power is availed from APSEB grid. The shop. Used bearings are dismantled, cleaned, inspected,
agreement with APSEB provides for exporting of surplus power serviced and reassembled on the rolls at regular intervals.
to APSEB. The captive generating capacity comprises of
Separate bearings for taking radial loads and axial loads are used.
_ TPP - 247.5 MW ( 3x60 MW + 1 X 67.5 MW)
5. Types of Bearings used in LMMM & MMSM
_ Back pressure Turbines (C&CCD)* - 2 x 7.5 MW
_ D 4 row tapered roller bearings
Gas Expansion Turbines (BF/ces)* - 2x12 MW
(*Power availability from BPT & GET is around 22MW) D 4 row cylindrical roller bearings
Power plant also meets the Air Blast requirements of Blast D Deep groove ball bearings
Furnaces thro' 3 Turbo blowers each of 6067 NM 3/hr capacity.
D 2 row axial tapered roller bearings
Power from APSEB is received at Main Receiving Sta-
D 2 row angular contact ball bearings
tion thro' 220 KV overhead distribution lines. The entire plant is
configured as 5 electrical load blocks (LBSS 1 to 5) and stepdown Types of bearings used in WRM
substations are provided in each block with 220 KV transform-
ers to step down to 33/11/6.6 KV for further distribution. D Morgoal bearing (Oil film bearings)
The total water requirements at full capacity utilization 6. Roll Shop-II comprises of roll turning shop, Bearing shop
of 3 MT/yr is 70 MGD, which is met from Yeluru Water Scheme and guide shop catering to the requirement of MMSM.
of A.P. This involved construction of a reservoir at Yeleswaram
Roll turning shop is equipped with six CNC lathes for
and a 153 Km long lined canal to the Kanithi Balancing Reser-
grooving new rolls, as well as redressings. The grooved
voir at plant site.
rolls are assembled with bearings in the bearing shop.
Kanithi Balancing Reservoir has a usable storage ca-
Chocks with bearings serviced periodically. Assembly
pacity of 12.6x106 M3 sufficient to meet plant as well as town
ship requirements for 45 days. There is a network of 28 Pump and service and repair of guides, preparation of strippers
Houses and 23 cooling Towers spread all over the plant to cool used in rolling of Angles, channels, rounds and beams
and recycle water, thus helping in conservation of water. Water is done in guide shop.
losses during the process are made up from Kanithi reservoir.
4.9 Field Machinery Department (FMD)
4.3 Traffic Dept.
Field Machinery, is meant for meeting the requirements
A Steel plant of the size of VSP has to handle around
of earthmoving equipment, mechanical handling equipments, and
60-65 MT traffic comprising of incoming traffic (different raw
14 19
shop-1, Roll shop-II and Area Repair Shop. The main materials etc.), outgoing traffic (finished / saleable steel
activities of this shop is Roll pass Design, grooving of products, pig iron, granulated slag, byproducts etc.) and in
process traffic viz. Cast P I, Mill scrap, Mill scale, hot metal, etc.
rolls, assembly of rolls with bearings, preparation of
guides and their service and manufacture/repair of mill Of this 50% is transported by belt conveyors, 45% by
Rail Transport and 5% by Road. VSP has the distinction of hav-
maintenance spares.
ing peripherial unloading system for the 1st time in Steel Industry.
2. For the first time in the country, VSP has adopted CNC
To handle this huge quantities of traffic, VSP has a fleet
technology for grooving of steel rolling mill rolls. High of 31 locomotives, 27 HM ladle cars, 7 torpedo ladle cars, 59
constant respective accuracy, higher productivity, use of captive wagons of different types, 5 internal Railway stations,
standard tool for any groove turning, elimination of the loco and wagon repair shop, number of weigh bridges besides
use of different templates,easier to incorporate groove taking on loan approx. 600 wagons daily from Indian Railways.
modification etc., are some of the advantages of CNC 4.4 Engineering shops & Foundry (ES & F)
lathes over the conventional one. Engineering Shops are set up to meet the requirements
of Ferrous & Non Ferrous spares of different departments. This
3. The Roll Pass Design section takes care of design of
complex is divided into 1. Forge Shop 2. Structural shop 3.
grooves for development of new sections, modification
Foundry 4. Central machine shop 5. Wood Working Shop and 6.
of existing pass designs for improving the productivity Utility Equipment Repair Shop (UERS).
and quality. Preparation of rolling schedules, groove detail
The Forge shop is designed for production of shafts,
and distribution and template drgs, part programming for coupling flanges etc. and also of forge shapes such as crusher
grooving of rolls on CNC lathes. This section also looks hammer heads, special bolts, nuts etc. In the Structural shops
after procurement of rolls, establishment and improvement the fabricated structurals of about 4500 tonnes are produced
of their performance, failure analysis of rolls etc. annually and the input consisting of sheets, plates, channels,
angles beam etc.
4. Roll Shop-I compraises of a Roll Turning Shop, bearing
In Foundry Iron castings upto a weight of 5 tons and non
shop, a Specialized repair shop and roll storage area
ferrous casting upto a weight of 1 ton are produced. 2600 tonnes
catering to the needs of LMMM and WRM. Roll Turning of iron castings and 200 tones of non ferrous castings are
shop is equipped with six CNC lathes, CNC template produced annualy In steel foundry, steel casting upto maximum
machine, Notch Milling machine etc. The grooved rolls piece weight of 10T are produced. Steel ingots upto 1.3 tonnes
are assembled with bearing and chocks in the bearing for forging are also produced.
18 15
In the Central Machine Shop, various spares are made. 4.6 Quality Assurance and Technology Development (QA&TD)
The machining section has over 100 major machine tools in-
The QA & TD dept. has been set up to take care of
cluding lathes, milling, boring, planning, sloting, shapping, grind-
ing and other machines. The Wood working Shop manufactures activities pertaining to Quality Control of Raw Materials, Semi
patterns for foundries. The shop will require 300 cu.m per year finished products and finished products. The QA & TD labs are
of wooden patterns. provided at major dept. like C&CCD, BF, SMS, Rolling Mills etc.
In Utility Equipment Repair Shop. The Repair of ventila- The dept. controls the process by providing process
tion, air conditioning and water supply equipment is carried out. charts for production of quality products. QA & TD carries out
4.5 Utilities Dept : final inspection & testing including spark testing of finished prod-
Utilities dept. Consists of 1. Air Seperation Plant 2. Com- ucts and assigns grades to them.
pressor Houses 3. Chilled water plants and Acetylene plants. 4.7 Calcining & Refractory Material Plant (CRMP)
The ASP is designed to meet the maximum daily de- CRMP consists of two units - Calcining Plant & Brick
mand of gaseous oxygen, gaseous nitrogen and gaseous ar-
Plant. In calcining plant limestone & dolomite are calcined for
gon. It has 3 units of nominal capacity of 500 tons/day of oxygen.
producing lime & calcined dolomite which are used for refining
Compressor Houses (CH) produce Compressed Air
of steel in the converters.
required for the operation of pneumatic devices, for instruments
and controls, pneumatic tools and for general purpose in the vari- In calcining plant there are five flux kilns, each of 325 T/
ous production units of steel plants. CH-I has 4 compressors of day capacity, At the discharge end of the kiln, fuel is fired through
capacity of 15,000NM3/hr. a burner to generate required heat for calcination. Due to the kiln
Chilled Water plants (2 Nos) produce chilled water re- rotation & inclination, material flows from the feed and to the
quired for use in the ventilation and air conditioning system in discharge end & gets calcined. The brick plant has two LAEIS
areas such as office rooms, electrical control room etc. These 1600 Ton presses & a tempering kiln (upto 3000 C temperature)
plant have twleve units each with a capacity to cool 180 Cu. M/hr for making bricks.
of water from 16 deg.C to 7 deg.C.
4.8 Roll shop & Repair shop (RS & RS)
Acetylene plant produces Acetylene gas required for gen-
eral purpose cutting and welding. The acetylene plant has three 1. Roll shop & Repair shop is in the complex of Rolling
generators each having capacity of 30 NM3/hr. Mills catering to the needs of mills in respect of roll
assemblies, guides few Maintenance Spares and roll pass
design. Geographically this dept.is in three areas as Roll
16 17
VISAKHAPATNAM STEEL PLANT FLOW CHART (3.0 MT STAGE)