Problems Encountered

What are the problems we have encountered during this project? Working as a
group makes the project accomplished earlier, however, there will still be problems
occuring during the project but then surely make it good and efficient when
resolved. So here are some of our problems we have encountered:

For the design:


1. Locating the shortest way of pipe from reservoir (sea) to water storage
(tank) while considering the design requirements.
2. Using of Reducer - At first, we planned the used of reducer to lower the
cost as if it is the priority before. But since, Sir Ian set a maximum number of
days to fill the tank, we have decided to removed the reducer so we would not have
to change the length and all.

For the computations:


1. Dimensions - We can't solve the length of the diagonal in our design.
2. Undecided about the value we will consider at the diameter of the pipe and
the velocity to achieve a better result and efficiency.
3. Formula needed for the design
4. Considering also the cost of material as we wanted to have a lower costs
yet efficient design.

Lastly, for the overall computations and design that will fit the criteria for
grading system.