You are on page 1of 11
Rel. Noz- MsGNOI 72205 METHOD STATEMENT OR gE REV. No. 00 - oe|ac: | Rev date: 06-020014 PageNo. I of & PROJECT: Niw COLLUGE OF ENGNEIRING- QNTAR UNIVERSITY CONTRUCTION OF NEW COLLEGE Of ENGINEERING | QATAR UNIVERSITY METHOD STATEMENT FOR WELDING REVISION CONTROL Propared By | Checked By Roped fer] ou |/auae”’ | “awee” |, A908" | seanager | Dexseton geer_|_ anager "| omen ox [ons] eM [exit | BENE | enn Abi] PFS ae Ue TSGNDI Tar ling for ane Papel wee] ast METHOD STATEMENT FOR ‘WELDING, PROJECT: Niw COLNE OF ENGNESRING--QXTAR UNWERSHY Ref, Nos MSGNDITIR0S REV.No. 00 Rev date: 06.029014 Poge No. 2 of & 0 20 30 40 50 60 10 so oo 100 a « INDEX PURPOSE score REFERENCES RESPONSIBILITY DEFINITIONS MATERIALS PROCEDURE, MANPOWER, PLANT AND EQUIPMENT SE REQUIREMENT RECORDS ATTACHMENTS. INSPECTION AND TEST PLAN cure List RISK ASSESSMENT Paste vn Rel, No. WSGNDI72208 lass METHOD STATEMENT FOR ReneS NOIZE ite ‘WELDING REV.No. 00 a — Rev dale 06-02 2014 PROJRCT: NiWCOLLNGE OF ENGNEERING -QXTARUNIVERSETY Page No. 9 of & 1.0 PURFOSE 1.1. ‘The purpose ofthis method statement iso identify the step by step prooedure for WELDING. and how it wil be exeuted om ite 20 score 224. "The scope of ths method satement isto deste the procedure of WELDING for NEW COLLEGE (OF ENGINEERING - QATAR UNIVERSITY, 30° REFERENCES 3a. Materia Approval 32. Approved Techuical Submittal 433. Approved Shop Drawings. 34. Project Speciation 35. Qes2010 40° RESPONSIDILITIES 41, Construction Manager willensure thatthe resources are avalele to caryout work as scheduled 42, Tectnical manager responsibilty 9 ensure thatthe work cari out as per the project IFC _Deawings Shop dawingsandTectnical submits required 43, Site Engiacer i cespons this method sntement ensure that work hasbeen carted out as per approved drewings and 44. QAIQC Enginccrinspecor fs responsible for ensuring the works ate cariod out as per syoificton and requzenents ofthe contact. 445, Site Safty Officer respaible for ensure the works are arid ut in safe and conolled manner and enforcing the use of PE. 50° DEFINITIONS 54. CLIENT (tar Univesity ‘82, CONSULTANT Khatib & Alani 153. CONTRACTOR AL Daswish Engineering WiLL, ‘54, SUBCONTRACTOR ETA Star Engineering & Contctng W.L-L. 60 MATERIALS 64. Welding Electrodes, 62, Welding consumables. TNS AI TEE03 Wling_ov fee Fase

You might also like