Rel. Noz- MsGNOI 72205
METHOD STATEMENT OR
gE REV. No. 00
-
oe|ac: |
Rev date: 06-020014
PageNo. I of &
PROJECT: Niw COLLUGE OF ENGNEIRING- QNTAR UNIVERSITY
CONTRUCTION OF NEW COLLEGE Of ENGINEERING
| QATAR UNIVERSITY
METHOD STATEMENT FOR WELDING
REVISION CONTROL
Propared By | Checked By Roped
fer] ou |/auae”’ | “awee” |, A908" | seanager | Dexseton
geer_|_ anager "| omen
ox [ons] eM [exit | BENE | enn Abi] PFS
ae Ue
TSGNDI Tar ling for ane Papelwee] ast
METHOD STATEMENT FOR
‘WELDING,
PROJECT: Niw COLNE OF ENGNESRING--QXTAR UNWERSHY
Ref, Nos MSGNDITIR0S
REV.No. 00
Rev date: 06.029014
Poge No. 2 of &
0
20
30
40
50
60
10
so
oo
100
a
«
INDEX
PURPOSE
score
REFERENCES
RESPONSIBILITY
DEFINITIONS
MATERIALS
PROCEDURE,
MANPOWER, PLANT AND EQUIPMENT
SE REQUIREMENT
RECORDS
ATTACHMENTS.
INSPECTION AND TEST PLAN
cure List
RISK ASSESSMENT
Pastevn Rel, No. WSGNDI72208
lass METHOD STATEMENT FOR ReneS NOIZE
ite ‘WELDING REV.No. 00
a — Rev dale 06-02 2014
PROJRCT: NiWCOLLNGE OF ENGNEERING -QXTARUNIVERSETY Page No. 9 of &
1.0 PURFOSE
1.1. ‘The purpose ofthis method statement iso identify the step by step prooedure for WELDING. and
how it wil be exeuted om ite
20 score
224. "The scope of ths method satement isto deste the procedure of WELDING for NEW COLLEGE
(OF ENGINEERING - QATAR UNIVERSITY,
30° REFERENCES
3a. Materia Approval
32. Approved Techuical Submittal
433. Approved Shop Drawings.
34. Project Speciation
35. Qes2010
40° RESPONSIDILITIES
41, Construction Manager willensure thatthe resources are avalele to caryout work as scheduled
42, Tectnical manager responsibilty 9 ensure thatthe work cari out as per the project IFC
_Deawings Shop dawingsandTectnical submits required
43, Site Engiacer i cespons
this method sntement
ensure that work hasbeen carted out as per approved drewings and
44. QAIQC Enginccrinspecor fs responsible for ensuring the works ate cariod out as per
syoificton and requzenents ofthe contact.
445, Site Safty Officer respaible for ensure the works are arid ut in safe and conolled manner
and enforcing the use of PE.
50° DEFINITIONS
54. CLIENT (tar Univesity
‘82, CONSULTANT Khatib & Alani
153. CONTRACTOR AL Daswish Engineering WiLL,
‘54, SUBCONTRACTOR ETA Star Engineering & Contctng W.L-L.
60 MATERIALS
64. Welding Electrodes,
62, Welding consumables.
TNS AI TEE03 Wling_ov fee Fase