DOCUMENT TRANSMITTAL ENGINEERING DESIGN DEPARTMENT Mr. Mario A. Garcia Project Director (Address): PRYSMIAN GROUP Prysmian PowerLink S.r, Sede Legale, Via Chise, Milano Email Add.: Mario garcia@prysmiangroup.com Tel. No. +44(0)7557120038 (Project Name & Schedule No., if applicable) ‘Our Reference: ‘CEDD20%8-09- FFF CEBU-NEGROS-PANAY 230Kv BACKBONE PROJECT, STAGE 3: SUBMARINE CABLE Lae September 12,2018 (Cebu-Negros Link) CSD No, Spt7.CNPSCS(TL).Vt0315 Your Ref. Cono.NacP-Wc-a20018.037 Date Septomber 3,2018 ENCLOSED FIND, FOR YOUR PLEASE RETURN Tetter Approval Copies List Comments Set (s) | Prints %_| Evaluation X__| Drawings/Manuals X_| Construction Documents X_]| Revision ‘OW [or BEFORE] Brochures, X_] Implementation # of Copies X_| Reference # of Sot(s) X_| Information ‘DWG. DOC. No. | REV. DESCRIPTION REMARKS 99-884 Engineering Sheet Drawings marked “AWC!” and "RFC" shal resubmitted for final approval within fteen (15) days trom receipt thereof. Notes: Approval ofthese documents shall not be held to relive the Contractor or any part of Contractor’ obligation to meet the requirements of the Specifications nor ofthe responsiblity for the correctness of these documents, FM-EDD-02A Rev. 2 A] approveo ‘awet_] APPROVED WI CORRECTIONS TFC | RETURNED FOR CORRECTION EDD EDD RPCODD. CHEGKED te i REVIEWED ‘SUBMITTED RECOMMENDED NGCP ENGINEERING SHEET ENGINEERING DESIGN DEPARTMENT BROGING POWER PROGRESS DTFNO. _ceDD2018-08- 289 [Date: September 12, 2018 PROJECT: CEBU-NEGROS-PANAY 230Kv BACKBONE PROJECT, STAGE 3: SUBMARINE CABLE (Cebu-Negros Link) Spi7.CNPSCS(TL)Vt-0315 Susyect: Submission of drawings as listed Reference No.: CNP3-NGCP-MG-020918L037 Date: September 3, 2018 Hem prawing/Doc. No. ‘Calatrava CTS : : ‘Site Development Plan | RFC jicated in the drawing. | RFC Notes: “Approval oft Contractor or any part of Contractor's obligation tormeet th requirements of the Specifications nor of the responsibiliyciacthe-— | arenoveo ~ [wer] ArpRovED w connecTons rc | RETURNED FOR CORRECTIONS - | e800 ceoo | nPccoo | sppnoveney oneoreo | Fae | ane nearer re arene ere eeeeeee rr — WILMER. SUBMITTED | E Tad = Cul phoning Degn BWSION ECOWENDED ct FM-EDD-03A Rev. 2 GZPRYSMIAN Prysmian ~@> Draka Group - © General Cable 2° September 2018 National Grid Corporation of the Philippines NGCP Building Quezon Avenue comer BIR Road, Diliman, Quezon City Philippines Attention: Mr, Rico C. Vega Deputy ACTO, Planning & Engineering CC: Mr Pedrito R, Garcia, OIC Head, Engineering Construction Department Mr. Narciso M. Atienza, OIC Head, Engineering Design Department CF: Mr. Henry Labrada, OIC Head, IPD Mr. Christopher John 8. Gayundato, Electrical Engineering Design Division ‘Subject: Land Portion. Official re- submittal of CNP3 Civil Works Drawings with changes based on CEDD2018-07- 668.0315 Contract No. Sp17,CNPSSC(TL). Vt0315, Contract Tite: Cebu-Negros-Panay (CNP) 230kV Backbone Project, Stage 3: Submarine Cable (Cebu-Negros Link) Reference: CNP3-NGCP-MG- 020918L037, Dear Sirs, Please find herewith attached our re-submission of modified drawings taking into consideration your Reference: (CEDD2018-07-668.0315 Reference: CEDD2018-07-668,0315 e———_-———-———_-—----—-— sheet 1/26 Drawings: a, CNP3SC-BDC-03-002 Calatrava CTS Site Development Plan V2.0 sheet 1/1 b. CNP3-BHP-001 Borehole Plan Calatrava, CTS ann annnnnnnnnnnnnnnnn sheet 11 | would be grateful if you could expedite the approval to fast track the engineering design processes of our Civil Engineering contractors and assist reducing some of the time lost by the delays caused by the RoW. Yours sincerely Prysmian PowerLink Sr Prysmian SETUP Mario A. Garcia BSc. Eng. MBA MAPM MIET Unking the Future Project Director Recewed by ema] ‘Sept. 2, 2016 Prysmian PowerLink S.rl. Sede Legate Societd con Soc ures ~ Drexone REA. Milano 185940 Wo Gres 8 / 20126 mono coordinamento di Prysmian SpA Captae Soc deliberate: Yel $39 0 6445.1 arta Iva papsi070868 €700.000.000 1 vow pryemiangroupcom Registro dele Imrese et Mano fe Cociee Fiscale 05931070964

You might also like