METRADO DE OBRA

OBRA: CONSTRUCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA


PARTIDA: CRUCE AEREO Y DETALLES L=8 ML

ITEM DESCRIPCION UND Nº VECES LARGO (m) ANCHO (m) ALTO (m) PARCIAL TOTAL
01.00.00 OBRAS PROVICIONALES
01.01.00 LIMPIEZA DE TERRENO M2 1.00 20.00 13.50 270.00 270.00
01.02.00 TRAZO Y REPLANTEO M2 1.00 20.00 13.50 270.00 270.00
02.00.00 MOVIMIENTO DE TIERRA
02.01.00 EXCAVACION DE ZANJA MANUAL 26.16
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
M3 4.00 0.70 0.70 0.70 1.37
ZAPATA DE COLUMNA M3 2.00 2.50 1.80 0.45 4.05
CAJA DE QUIEBRE M3 2.00 0.60 0.60 0.70 0.50
ZANJA PARA TUBERIA PVC Ø 20" M3 1.00 2.60 0.30 0.30 0.23
02.02.00 EXCAVACION EN ROCA FIJA(PERJ.+DISP) M3 2.00 1.80 1.60 0.85 4.90 4.90
3.00.00 OBRAS DE CONCRETO
03.01.00 SOLADO E=4" CONCRETO F´C=100 KG/CM2 M3 2.00 2.50 1.80 9.00 9.00
03.02.00 ENCOFRADO Y DESENCOFRADO - COLUMNAS 25.68
COLUMNAS M2 8.00 0.50 2.80 11.20
M2 8.00 0.30 2.80 6.72
CAJA DE QUIEBRE M2 4.00 0.60 0.70 1.68
M2 4.00 1.40 0.70 3.92
VIGA DE APOYO M2 2.00 0.90 1.20 2.16
3.03.00 Cº CICLOPEO F´C=210 kg/cm2 10.92
ZAPATAS M3 2.00 2.50 1.80 1.00 9.00
CLUMNAS M3 4.00 0.50 0.30 2.80 1.68
VIGA DE APOYO M3 2.00 1.20 0.40 0.25 0.24
3.04.00 Cº SIMPLE f¨c=175 kg/cm2 M3 20.49
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
CAJA DE QUIEBRE M3 2.00 2.60 0.70 0.10 0.36
PISO DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.20 0.08
TAPA DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.10 0.04
3.05.00 Cº SIMPLE f¨c=140 kg/cm2 M3 1.37
BLOQUE DE Cº PARA ANCLAJE DE VIENTOS M3 4.00 0.70 0.70 0.70 1.37

3.06.00 CONCRETO CICLOPEO MORTERO 1:10+30%PG M2 1.00 1.50 0.85 0.75 0.96 0.96
3.07.00 ACERO f´y=4200 kg/cm2 KG SEGÚN HOLA DE CALCULO 154.13 154.13

04.00.00 REVOQUES Y ENLUCIDOS


04.01.00 TARRAJEO EXT. EN COLUMNAS M2 4.00 0.50 2.80 1.40 5.04
M2 4.00 0.30 2.80 0.84
TARRAJEO EN CAJA DE QUIEBRE M2 1.00 2.60 0.70 1.82
M2 1.00 1.40 0.70 0.98
TARRAJEO EN VIGA DE APOYO M2 2.00 1.20 1.30 1.56
05.00.00 ACCESORIOS
05.01.00 SUMINISTRO DE TUBERIA PVC Ø 315 mm. HDPE ML 1.00 12.00 12.00 12.00
05.02.00 CABLE PRINCIPAL DE Ø 5/8" ML 2.00 15.00 30.00 30.00
05.03.00 CABLE PARA VIENTO DE Ø 1/4" ML 1.00 45.00 45.00 45.00
05.04.00 CABLE PENDULO DE ACERO Ø 5/16" ML 1.00 19.00 19.00 19.00
05.05.00 BRIDA Ø 10" UND 1.00 2.00 2.00 2.00
METRADO DE OBRA
OBRA: CONSTRUCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA
05.06.00 TENSOR UND 2.00 2.00 4.00 4.00
05.07.00 POLEAS UND 4.00 1.00 4.00 4.00
05.08.00 GRAMPA MODIFICADA UND 1.00 14.00 14.00 14.00
05.09.00 GUARDACABLE UND 1.00 14.00 14.00 14.00
05.10.00 MORDAZAS Ø 5/16" UND 1.00 56.00 56.00 56.00
05.11.00 MORDAZAS Ø 3/4" UND 1.00 24.00 24.00 24.00
ABRAZADERA PARA SUJETAR VIENTO PLAT.
05.12.00 MET. DE e=3/4" UND 1.00 4.00 4.00 4.00
SOSTENEDORES RECTANGULAR DE 2" x 11/2
05.13.00 DE ACERO UND 1.00 7.00 7.00 7.00
05.14.00 CUARTON DE MADERA DE 2" x 3" x 10' UND 1.00 14.00 14.00 14.00
05.15.00 PERNO DE 4" x 1/2" UND 1.00 14.00 14.00 14.00

PARTIDA: CRUCE AEREO Y DETALLES L=13 ML

ITEM DESCRIPCION UND Nº VECES LARGO (m) ANCHO (m) ALTO (m) PARCIAL TOTAL
01.00.00 OBRAS PROVICIONALES
01.01.00 TRAZO Y REPLANTEO M2 1.00 26.00 13.50 351.00 351.00
01.02.00 LIMPIEZA DE TERRENO M2 1.00 26.00 13.50 351.00 351.00
02.00.00 MOVIMIENTO DE TIERRA
02.01.00 EXCAVACION DE ZANJA MANUAL 32.91
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
M3 4.00 0.70 0.70 0.70 1.37
ZAPATA DE COLUMNA M3 2.00 2.50 1.80 1.20 10.80
CAJA DE QUIEBRE M3 2.00 0.60 0.60 0.70 0.50
ZANJA PARA TUBERIA PVC Ø 10" M3 1.00 2.60 0.30 0.30 0.23
02.02.00 EXCAVACION EN ROCA FIJA(PERJ.+DISP) M3 2.00 2.50 1.60 0.55 4.40 4.40
3.00.00 OBRAS DE CONCRETO
03.01.00 SOLADO E=4" CONCRETO F´C=100 KG/CM2 M3 1.00 2.50 2.00 5.00 5.00
03.02.00 ENCOFRADO Y DESENCOFRADO - COLUMNAS 20.64
COLUMNAS M2 8.00 0.40 2.30 7.36
M2 8.00 0.30 2.30 5.52
CAJA DE QUIEBRE M2 4.00 0.60 0.70 1.68
M2 4.00 1.40 0.70 3.92
VIGA DE APOYO M2 2.00 0.90 1.20 2.16
ENCOFRADO Y DESENCOFRADO - LOSAS Y
3.02.00 PANTALLAS M2 0.00 2.00 1.10 0.00 0.00
3.04.00 F´C=210 kg/cm2 10.34
ZAPATAS M3 2.00 2.50 1.80 1.00 9.00
CLUMNAS M3 4.00 0.40 0.30 2.30 1.10
VIGA DE APOYO M3 2.00 1.20 0.40 0.25 0.24
3.05.00 Cº SIMPLE f¨c=175 kg/cm2 M3 16.49
BLOQUE DE ANCLAJE M3 2.00 2.00 2.00 2.00 16.00
CAJA DE QUIEBRE M3 2.00 2.60 0.70 0.10 0.36
PISO DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.20 0.08
TAPA DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.10 0.04
3.06.00 Cº SIMPLE f¨c=140 kg/cm2 M3 1.37
BLOQUE DE Cº PARA ANCLAJE DE VIENTOS M3 4.00 0.70 0.70 0.70 1.37

3.07.00 CONCRETO CICLOPEO MORTERO 1:10+30%PG M3 1.00 1.50 0.85 0.75 0.96 0.96
METRADO DE OBRA
OBRA: CONSTRUCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA
3.08.00 ACERO f´y=4200 kg/cm2 KG SEGÚN HOLA DE CALCULO 154.13 154.13

04.00.00 REVOQUES Y ENLUCIDOS


04.01.00 TARRAJEO EXT. EN COLUMNAS M2 4.00 0.50 2.80 1.40 5.04
M2 4.00 0.30 2.80 0.84
TARRAJEO EN CAJA DE QUIEBRE M2 1.00 2.60 0.70 1.82
M2 1.00 1.40 0.70 0.98
TARRAJEO EN VIGA DE APOYO M2 2.00 1.20 1.30 1.56
05.00.00 ACCESORIOS
05.01.00 SUMINISTRO DE TUBERIA PVC Ø 315 mm. HDPE ML 1.00 17.00 17.00 17.00
05.02.00 CABLE PRINCIPAL DE Ø 5/8" ML 2.00 21.00 42.00 42.00
05.03.00 CABLE PARA VIENTO DE Ø 1/4" ML 1.00 45.00 45.00 45.00
05.04.00 CABLE PENDULO DE ACERO Ø 5/16" ML 2.00 30.00 60.00 60.00
05.05.00 BRIDA Ø 250 MM UND 1.00 3.00 3.00 3.00
05.06.00 TENSOR Ø 5/8" UND 2.00 2.00 4.00 4.00
05.07.00 POLEAS UND 1.00 4.00 4.00 4.00
05.08.00 GRAMPA MODIFICADA UND 2.00 24.00 48.00 48.00
05.09.00 GUARDACABLE UND 2.00 24.00 48.00 48.00
05.10.00 MORDAZAS Ø 5/8" UND 2.00 96.00 192.00 192.00
05.11.00 MORDAZAS Ø 5/16" UND 2.00 24.00 48.00 48.00
ABRAZADERA PARA SUJETAR VIENTO PLAT.
05.12.00 MET. DE e=3/4" UND 1.00 24.00 24.00 24.00
SOSTENEDORES RECTANGULAR DE 2" x 11/2
05.13.00 DE ACERO UND 1.00 12.00 12.00 12.00
05.14.00 CUARTON DE MADERA DE 2" x 3" x 10' UND 1.00 24.00 24.00 24.00
05.15.00 PERNO DE 4" x 1/2" UND 1.00 24.00 24.00 24.00

PARTIDA: CRUCE AEREO Y DETALLES L=18 ML

ITEM DESCRIPCION UND Nº VECES LARGO (m) ANCHO (m) ALTO (m) PARCIAL TOTAL
01.00.00 OBRAS PROVICIONALES
01.01.00 LIMPIEZA DE TERRENO M2 1.00 30.00 13.50 405.00 405.00
01.02.00 TRAZO Y REPLANTEO M2 1.00 30.00 13.50 405.00 405.00
02.00.00 MOVIMIENTO DE TIERRA
02.01.00 EXCAVACION DE ZANJA MANUAL 34.46
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
M3 4.00 0.70 0.70 0.70 1.37
ZAPATA DE COLUMNA M3 2.00 2.50 1.90 1.30 12.35
CAJA DE QUIEBRE M3 2.00 0.60 0.60 0.70 0.50
ZANJA PARA TUBERIA PVC Ø 10" M3 1.00 2.60 0.30 0.30 0.23
02.02.00 EXCAVACION EN ROCA FIJA(PERJ.+DISP) M3 2.00 2.50 2.10 0.85 8.93 8.93
3.00.00 OBRAS DE CONCRETO
03.01.00 SOLADO E=4" CONCRETO F´C=100 KG/CM2 M3 2.00 2.50 2.00 10.00 10.00
03.02.00 ENCOFRADO Y DESENCOFRADO - COLUMNAS 25.68
COLUMNAS M2 8.00 0.50 2.80 11.20
M2 8.00 0.30 2.80 6.72
CAJA DE QUIEBRE M2 4.00 0.60 0.70 1.68
M2 4.00 1.40 0.70 3.92
VIGA DE APOYO M2 2.00 0.90 1.20 2.16
3.03.00 Cº CICLOPEO F´C=210 kg/cm2 13.32
ZAPATAS M3 2.00 2.50 1.90 1.20 11.40
CLUMNAS M3 4.00 0.50 0.30 2.80 1.68
VIGA DE APOYO M3 2.00 1.20 0.40 0.25 0.24
METRADO DE OBRA
OBRA: CONSTRUCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA
3.04.00 Cº SIMPLE f¨c=175 kg/cm2 M3 20.49
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
CAJA DE QUIEBRE M3 2.00 2.60 0.70 0.10 0.36
PISO DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.20 0.08
TAPA DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.10 0.04
3.05.00 Cº SIMPLE f¨c=140 kg/cm2 M3 1.37
BLOQUE DE Cº PARA ANCLAJE DE VIENTOS M3 4.00 0.70 0.70 0.70 1.37

3.06.00 CONCRETO CICLOPEO MORTERO 1:10+30%PG M2 1.00 1.50 0.85 0.75 0.96 0.96
3.07.00 ACERO f´y=4200 kg/cm2 KG SEGÚN HOLA DE CALCULO 180.53 180.53

04.00.00 REVOQUES Y ENLUCIDOS


04.01.00 TARRAJEO EXT. EN COLUMNAS M2 4.00 0.50 2.80 1.40 5.04
M2 4.00 0.30 2.80 0.84
TARRAJEO EN CAJA DE QUIEBRE M2 1.00 2.60 0.70 1.82
M2 1.00 1.40 0.70 0.98
TARRAJEO EN VIGA DE APOYO M2 2.00 1.20 1.30 1.56
05.00.00 ACCESORIOS
05.01.00 SUMINISTRO DE TUBERIA PVC Ø 315 mm. HDPE ML 1.00 22.00 22.00 22.00
05.02.00 CABLE PRINCIPAL DE Ø 3/4" ML 2.00 26.00 52.00 52.00
05.03.00 CABLE PARA VIENTO DE Ø 1/4" ML 1.00 45.00 45.00 45.00
05.04.00 CABLE PENDULO DE ACERO Ø 5/16" ML 1.00 39.00 39.00 39.00
05.05.00 BRIDA Ø 10" UND 1.00 4.00 4.00 4.00
05.06.00 TENSOR UND 2.00 2.00 4.00 4.00
05.07.00 POLEAS UND 4.00 1.00 4.00 4.00
05.08.00 GRAMPA MODIFICADA UND 1.00 34.00 34.00 34.00
05.09.00 GUARDACABLE UND 1.00 34.00 34.00 34.00
05.10.00 MORDAZAS Ø 5/16" UND 1.00 136.00 136.00 136.00
05.11.00 MORDAZAS Ø 3/4" UND 1.00 24.00 24.00 24.00
ABRAZADERA PARA SUJETAR VIENTO PLAT.
05.12.00 MET. DE e=3/4" UND 1.00 4.00 4.00 4.00
SOSTENEDORES RECTANGULAR DE 2" x 11/2
05.13.00 DE ACERO UND 1.00 17.00 17.00 17.00
05.14.00 CUARTON DE MADERA DE 2" x 3" x 10' UND 1.00 34.00 34.00 34.00
05.15.00 PERNO DE 4" x 1/2" UND 1.00 34.00 34.00 34.00

PARTIDA: CRUCE AEREO Y DETALLES L=25 ML

ITEM DESCRIPCION UND Nº VECES LARGO (m) ANCHO (m) ALTO (m) PARCIAL TOTAL
01.00.00 OBRAS PROVICIONALES
01.01.00 LIMPIEZA DE TERRENO M2 1.00 47.00 13.50 634.50 634.50
01.02.00 TRAZO Y REPLANTEO M2 1.00 47.00 13.50 634.50 634.50
02.00.00 MOVIMIENTO DE TIERRA
02.01.00 EXCAVACION DE ZANJA MANUAL 37.11
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
M3 4.00 0.70 0.70 0.70 1.37
ZAPATA DE COLUMNA M3 2.00 2.50 2.00 1.50 15.00
CAJA DE QUIEBRE M3 2.00 0.60 0.60 0.70 0.50
ZANJA PARA TUBERIA PVC Ø 10" M3 1.00 2.60 0.30 0.30 0.23
02.02.00 EXCAVACION EN ROCA FIJA(PERJ.+DISP) M3 2.00 2.50 2.10 0.85 8.93 8.93
3.00.00 OBRAS DE CONCRETO
03.01.00 SOLADO E=4" CONCRETO F´C=100 KG/CM2 M3 2.00 2.50 2.00 10.00 10.00
03.02.00 ENCOFRADO Y DESENCOFRADO - COLUMNAS 25.68
METRADO DE OBRA
OBRA: CONSTRUCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA
COLUMNAS M2 8.00 0.50 2.80 11.20
M2 8.00 0.30 2.80 6.72
CAJA DE QUIEBRE M2 4.00 0.60 0.70 1.68
M2 4.00 1.40 0.70 3.92
VIGA DE APOYO M2 2.00 0.90 1.20 2.16
3.03.00 Cº CICLOPEO F´C=210 kg/cm2 16.92
ZAPATAS M3 2.00 2.50 2.00 1.50 15.00
CLUMNAS M3 4.00 0.50 0.30 2.80 1.68
VIGA DE APOYO M3 2.00 1.20 0.40 0.25 0.24
3.04.00 Cº SIMPLE f¨c=175 kg/cm2 M3 20.49
BLOQUE DE ANCLAJE M3 2.00 2.50 2.00 2.00 20.00
CAJA DE QUIEBRE M3 2.00 2.60 0.70 0.10 0.36
PISO DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.20 0.08
TAPA DE CAJA DE QUIEBRE M3 1.00 0.60 0.70 0.10 0.04
3.05.00 Cº SIMPLE f¨c=140 kg/cm2 M3 1.37
BLOQUE DE Cº PARA ANCLAJE DE VIENTOS M3 4.00 0.70 0.70 0.70 1.37

3.06.00 CONCRETO CICLOPEO MORTERO 1:10+30%PG M2 1.00 1.50 0.85 0.75 0.96 0.96
3.07.00 ACERO f´y=4200 kg/cm2 KG SEGÚN HOLA DE CALCULO 180.53 180.53

04.00.00 REVOQUES Y ENLUCIDOS


04.01.00 TARRAJEO EXT. EN COLUMNAS M2 4.00 0.50 2.80 1.40 5.04
M2 4.00 0.30 2.80 0.84
TARRAJEO EN CAJA DE QUIEBRE M2 1.00 2.60 0.70 1.82
M2 1.00 1.40 0.70 0.98
TARRAJEO EN VIGA DE APOYO M2 2.00 1.20 1.30 1.56
05.00.00 ACCESORIOS
05.01.00 SUMINISTRO DE TUBERIA PVC Ø 315 mm. HDPE ML 1.00 29.00 29.00 29.00
05.02.00 CABLE PRINCIPAL DE Ø 3/4" ML 2.00 33.00 66.00 66.00
05.03.00 CABLE PARA VIENTO DE Ø 1/4" ML 1.00 45.00 45.00 45.00
05.04.00 CABLE PENDULO DE ACERO Ø 5/16" ML 1.00 55.00 55.00 55.00
05.05.00 BRIDA Ø 10" UND 1.00 5.00 5.00 5.00
05.06.00 TENSOR UND 2.00 2.00 4.00 4.00
05.07.00 POLEAS UND 4.00 1.00 4.00 4.00
05.08.00 GRAMPA MODIFICADA UND 1.00 48.00 48.00 48.00
05.09.00 GUARDACABLE UND 1.00 48.00 48.00 48.00
05.10.00 MORDAZAS Ø 5/16" UND 1.00 192.00 192.00 192.00
05.11.00 MORDAZAS Ø 3/4" UND 1.00 24.00 24.00 24.00
ABRAZADERA PARA SUJETAR VIENTO PLAT.
05.12.00 MET. DE e=3/4" UND 1.00 4.00 4.00 4.00
SOSTENEDORES RECTANGULAR DE 2" x 11/2
05.13.00 DE ACERO UND 1.00 24.00 24.00 24.00
05.14.00 CUARTON DE MADERA DE 2" x 3" x 10' UND 1.00 48.00 48.00 48.00
05.15.00 PERNO DE 4" x 1/2" UND 1.00 48.00 48.00 48.00
4 508
7.1
27.00
19.00 8.25 16.5 19.5
3 14.25
4 28.5 16.95
4
24
24
96 0.625 115.5
24 23 23

24

12
12
24
4
7.1
27.00
29.00 10.75 30.5
2.16666667
4
4
18
18
72
24

24

12
12
24
4 4
7.1 25.1
27.00 27.00
29.00 39.00
2.16666667 3
4 4
4 4
18 18
18 18
72 72
24 24

24 24

12 12
12 12
24 24
4
7.1
27.00
29.00 53
2.16666667 4.16666667
4
4
18
18
72
24

24

12
12
24
METRADO DE ACERO
OBRA: CONSTRUCCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA
PARTIDA: CRUCE AEREO Y DETALLE L= 8 ML.

Ø CANTIDAD LONGITUD LONGITUD PESO/ML DESPER- PESO TOTAL


TIPO
Nº DE PIEZA PIEZA TOTAL KG/ML DICIO KG.

0.75 3.6 1/2" 24 4.35 104.4 1.02 1.05 111.81

0.60
0.20 0.30 0.30 3/8" 0 2.00 0 0.57 1.05 0.00
0.60
0.4
0.2 0.2 3/8" 38 1.2 45.6 0.57 1.05 27.29
0.4

0.55 2.5 3/8" 0.00 3.05 0 0.57 1.05 0.00

0.55 0.55
0.15 1.35 0.15 1/2" 10 2.75 27.5 1.02 1.05 29.45

0.3
0.2 0.2 3/8" 20 1 20 0.57 1.05 11.97
0.3

1.2 0.9 3/8" 0 0.45 0 0.57 1.05 0.00

1.9 3/8" 24 1.9 45.6 0.57 1.05 27.29

2.2 3/8" 0 2.2 0 0.57 1.05 0.00

TOTAL = 180.53

PARTIDA: CRUCE AEREO Y DETALLE L=13 ML.

Ø CANTIDAD LONGITUD LONGITUD PESO/ML DESPER- PESO TOTAL


TIPO
Nº DE PIEZA PIEZA TOTAL KG/ML DICIO KG.

0.6 2.9 1/2" 24 3.5 84 1.02 1.05 89.96

0.60
0.20 0.30 0.30 3/8" 0 2.00 0 0.57 1.05 0.00
0.60
0.3
0.2 0.2 3/8" 38 1 38 0.57 1.05 22.74
0.3

0.55 2.5 3/8" 0.00 3.05 0 0.57 1.05 0.00


METRADO DE ACERO
OBRA: CONSTRUCCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA
0.55 0.55
0.15 1.35 0.15 1/2" 10 2.75 27.5 1.02 1.05 29.45

0.3
0.2 0.2 3/8" 20 1 20 0.57 1.05 11.97
0.3

1.2 0.9 3/8" 0 0.45 0 0.57 1.05 0.00

1.9 3/8" 24 1.9 45.6 0.57 1.05 27.29

2.2 3/8" 0 2.2 0 0.57 1.05 0.00

TOTAL = 154.13

PARTIDA: CRUCE AEREO Y DETALLE L=18 ML.

Ø CANTIDAD LONGITUD LONGITUD PESO/ML DESPER- PESO TOTAL


TIPO
Nº DE PIEZA PIEZA TOTAL KG/ML DICIO KG.

0.75 3.6 1/2" 24 4.35 104.4 1.02 1.05 111.81

0.60
0.20 0.30 0.30 3/8" 0 2.00 0 0.57 1.05 0.00
0.60
0.4
0.2 0.2 3/8" 38 1.2 45.6 0.57 1.05 27.29
0.4

0.55 2.5 3/8" 0.00 3.05 0 0.57 1.05 0.00

0.55 0.55
0.15 1.35 0.15 1/2" 10 2.75 27.5 1.02 1.05 29.45

0.3
0.2 0.2 3/8" 20 1 20 0.57 1.05 11.97
0.3

1.2 0.9 3/8" 0 0.45 0 0.57 1.05 0.00

1.9 3/8" 24 1.9 45.6 0.57 1.05 27.29

2.2 3/8" 0 2.2 0 0.57 1.05 0.00

TOTAL = 180.53

PARTIDA: CRUCE AEREO Y DETALLE L=25 ML.


METRADO DE ACERO
OBRA: CONSTRUCCION DE CANAL DE RIEGO CEDROPAMPA - YANANACO - PILATA

Ø CANTIDAD LONGITUD LONGITUD PESO/ML DESPER- PESO TOTAL


TIPO
Nº DE PIEZA PIEZA TOTAL KG/ML DICIO KG.

0.75 3.6 1/2" 24 4.35 104.4 1.02 1.05 111.81

0.60
0.20 0.30 0.30 3/8" 0 2.00 0 0.57 1.05 0.00
0.60
0.4
0.2 0.2 3/8" 38 1.2 45.6 0.57 1.05 27.29
0.4

0.55 2.5 3/8" 0.00 3.05 0 0.57 1.05 0.00

0.55 0.55
0.15 1.35 0.15 1/2" 10 2.75 27.5 1.02 1.05 29.45

0.3
0.2 0.2 3/8" 20 1 20 0.57 1.05 11.97
0.3

1.2 0.9 3/8" 0 0.45 0 0.57 1.05 0.00

1.9 3/8" 24 1.9 45.6 0.57 1.05 27.29

2.2 3/8" 0 2.2 0 0.57 1.05 0.00

TOTAL = 180.53