Qualitech Testing & Consultancy Limited
HE it th HW A AOR A ay
Fat &F,/%, BlockB, Univeral Industrial Cente,19-25 Shan Mi Sree, Sh Ti, Hong Kong.
MRAM 9-25 FH OR LOMOM CREE
Tel (852) 2185-0900 Fax = (852) 2687-6752. Website: wrwqe-keom
smal: tego
PRELIMINARY WELDING PROCEDURE SPECIFICATION (pWPS)
Foundation and Ste Formation for Public Rental Housing Development at Lai Cho Road, Kwai Chung,
Point ype and weld type
‘Double-sided ip welds in rebar fo plate for Dia 32 & Dia 90
[Report No: _1906144-5 [Rev 1 [Amd 0 [Issued Date: _28 May, 2019 Page 1 of 2 Pages Jes
[sppliation Standard: SENSO 15609-12004 =
PS TS061aSRIAD es
Manafactarer: Vibro GK} Lid =|
Prec =
=
orizontal vertieal (PB) for Dia 32 rebar &
[ing postions: ‘etieal up (PF for Dia. $0 Rebar
rae ae [BSEN 10025-2:2006 Grade S35510 (1.2) for plate:
Materia hicness (mm): 30 & 47.3 forsee! plate
J2:6001-x 1S0W x 30mm tk. plate x 3pes. & 473mm set plate x3 pes
Welding details:
(CS2:2012 Grade 500 for reber |Outside diameter (mm): @32 & @50 for rebar
ica ot prpnratin ad caning Pane SH oST EET A TTOWETTY ETE Woe eta cae:
treatin die kee
[ome preparation (mm I Run sequence
| 207mm | 30m |
7 ‘cut from 986 x 406
\L4 samc Toten] 150 mm teat
‘Y32 LOmm throat fillet weld
OF Fez ZS 9 Pong
er ‘Som fo bt es
1: Dia. 32 x 60deum long rebar x 3pes. de Din. $0 x 600mm long rebar x 3 pes, {ein. total length me
260mm fr both sides) 7
unm rovesy | SM#0CFHler | Current (A) | Voltage vy | Typeot | wireFeed | Travel Speed | Heat input
ee Metal Ave. Ave current | Speed | mm/see. | d/o
Ta Tan Tomm [0 — 1s0| 28 — 28 | ac a ee
Ta MMA, Somm [150 — 20] 25 _— 30] AC = [Avorox. 1 = 3] 100 — 5.76
Filler metal casiiction and trade names
Kabelea LB-57 BSEN ISO 2560; 2009-AE 47 3B 12 HIO/ AWS ASA FTOI6
ny special baking or yi
Dry the elestrodes at 300-350°C for 30-Q0 minutes before use
as/Fiux Shielding: NA [Gasfow rate: Shielding: WA
Backing: NA Backing: NA
Frungsten electrode type/sie: N/A
[bctait orbacking/ gouging WA
lereheat temperature! WA Tnterpass temperature: Max 250°C,
Post eating: WA
Pose weld heat treatment and or ageing: NIA [Preheat malntance temperature: NA
lomiertuformation:
ean (axe width of run): ‘Approx. mm
loscittion: amplitude, Frequency, dwell time: N/A
Patse welding deta: WA Distance contact tube/ work piece: N/A
Plasma welding deals: WA [Torch angle WA
tek out length WA [Nowa siz WA,
PSDISTADARtQualitech Testing & Consultancy Limited
E i ie HR BA A OR A al
Fat & 7, Block B, Univeral Indo! Cene9-25 Shas Mei Sucet, Sb Tin, ong Kong.
WON As F192 58 Fo TRH ARO EAE
‘TA: (852) 2185-0900 Fan: (82) 2687.6752 Websites wirwqiehkcom Esmall:qle@aieecom
PRELIMINARY WELDING PROCEDURE SPECIFICATION (pWPS)
[Report No.: 1906144-5 [Rev.: 1 [Amd.: 0 [Issued Date: _28 May, 2019 [Page 2 of 2? Pages
[Extent of Approval
[Quaifestion Stendara: _BSENISO 17660-12006
[velaing processes): Metal ar welding with covered electrode (111) (ACKDCEP)
[Type of joint and weld:
Fillet weld qualifies filet welding ony
Its not permited to change a mult-undeposit into a single run (r single run on each side) or vice versa
{or given procs,
‘Double-sided lp weld in rebar to oer sel components
‘Same ae the test.
(Parent metal group() and sub group() + PD CEN ISO/TR 15608 Group 1.2 othe tel components and CS2.2012 Grade 500 rebar
[Parent metal thickness (mm) ¢ Sam thc fr other tel components
[Weld meta ehickness(mm) and filler weld size(mm) + _No restition for mltinan
[Outside diameter (mm) (232mm t 050mm for bar
[Btcctrode identification “Type weed in welding condition
[GasiFiax 5
[Gas how rate = i
Mode of meta transfer: es
eat np
eldiag postion: All positions except vertical down
lPrebeat :
weld eat treatment and/or agelog = a
[Fest for qualification tests :
‘Non-destructive tests ¢ ‘Visual Tet
‘Magnetic Pale Test,
‘Destructive tests = “Transverse Tensile Tet x 6 pos.
TRemark :
1. Ifall required weld test were accepted, a final welding procedure certification (Welding Procedure Approval Record)
willbe issued.
lo. The welder who undertake and satisfied this welding procedure, relevant part of welder certificate will also be issued.
|. This procedure defines the limitation and the range of welding condition which is stated in extend of approval
[4. This document is prepared and based on customer information.
IPrepared by examining body: Confirmed by manufacturer:
Tang Siu Man
{Qualification : CSWIP 3.1 Welding Inspector on behalf of
PSST Amie