You are on page 1of 3
RENATQY. FRIAS Ena (Witness) bs SE g a og 2s ee oo os 26 Sg ee | fee BE Ng 5 i g2 . é g eee Department of Public Works and Highways Contract 1D : 181F0005 Contract Name & : Construction of Flood Mitigation Structure, Ahag, Ormoc Location City, Leyte ‘CONTRACT AGREEMENT KNOW ALL MEN BY THESE PRESENTS: 13 FEB 2018 This CONTRACT AGREEMENT, made this by and between: day of ‘The GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES, through the Department of Public Works and Highways (DPWH) represented herein by LINO FRANCISCO C. GONZALEZ, District Engineer, duly authorized for this purpose, with main office address at Ormoc City, hereinafter referred to as the “PROCURING ENTITY”; -and- RJIR ENTERPRISES / CIRCLE Z VENTURES AND DEVELOPMENT CORPORATION (JOINT VENTURE) a corporation organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at CAPT. VILBAR ST., HILONGOS, LEYTE, represented herein by ZELDA V. OGARIO, duly authorized for this purpose, hereinafter referred to as the “CONTRACTOR”; WITNESSETH: WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute the Works under Contract ID No. 18IF0005 - Construction of Flood Mitigation Structure, Ahag, Ormoc City, Leyte, herein after called “the Works” and the Procuring Entity has accepted the Calculated Bid of the CONTRACTOR for the execution and completion of the Works at the calculated unit bid prices shown hereunder, or a total contract price of TWENTY THREE MILLION TWO HUNDRED SEVENTY TWO THOUSAND NINETY TWO PESOS AND THIRTY TWO CENTAVOS ONLY (Php '23;222,092.32) with a Contract Duration of ONE HUNDRED NINETY FIVE (195) calendar 181F 0005 Item anti ” Total Amount Ncube Description Quantity | Unit | Unit Cost © IPARTB OTHER GENERAL REQUIREMENTS \ Bs Project Bilkoard/ 2.00| each | 3,981.57 7,963.14 Signboard 18.7 (1) [Occupational Safety and 6.50] mo. 40,572.43 263,720.80 Health Program a9 Mobilization 100] 1s. | 19740693) 197,406.93 E Demobilization PART B PLAIN AND REINFORCED CONCRETE WORKS 900(2}<1 beanie on ae 54135|cum.| 7,810.94] — 4,228,452.37 Reinforcing Steel 5 SO | charmer Gracie dd 15,168.50 | ke 70.63} 1,071,421.78 S PART I-A EARTHWORKS: Zz 1700(1) _ [Clearing and Grubbing 2,700.00 | sq.m. 27.80 75,060.00 E ioeiiian eee cn 3,037.50 | cum. 27824] 845,154.00 $ lo (Common Soil) g ee ws 8 SS fa70n(a) _Junsuitabie Excavation 4214.70 | Sam. 282.14 —1,189,135.45, 5 ee ea 2 eS nkment (From § Z — |a7oacayp [Embankment ( 2,025.00 | cu.m. 386.23 782,115.75 Sa ae Borrow) 28 S _ [PARTI-B BANK AND SLOPE PROTECTION WORKS oe [1711(1) [Stone Masonry 2,551.50 | cum. 4,284.06 | _10,930,779.09 ges aie 1714(1)a3 |Gabions 1mxtm x2m 900.00 | cum. 4,089.87 | —_3,680,883.00 (Metallic Coated) ga [TOTAL 23,272,092.32| |AMOUNT IN TWENTY THREE MILLION TWO HUNDRED SEVENTY TWO} l< IWORDS : [THOUSAND NINETY TWO PESOS AND THIRTY TWO} a |CENTAVOS ONLY IS NOW, THEREFORE, for and consideration of the foregoing premises, the parties St hereto agree as follows: iB e 1 In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2 The following documents shall be attached, deemed to form, and be read and constructed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority This Contract Agreement Documents forming part of the Contract Agreement: ILIC WORKS AND HIGHWA} (1) Notice of Award (NOA) with the Contractor's signed “conforme” a6 SZ () Contractor's Bid in the Form of Bid, including its Technical 28 and Financial Proposals, as calculated by the Procuring gB y Entity and conformed to by the Contractor through the NOA. DPWH-INFR-$1-2016 Page 2 of 4 181F0005 (3) Bidding Documents with Bulletins (4) Specifications (5) Drawings (6) Special Conditions of Contract (SCC) o< (7) General Conditions of Contract (GCC) (8) Performance Security (3) Integrity Pledge Under Department Order No. 86, series of 2013 (10) Drawings (@) Construction Methods (b) Construction Schedule in the form of PERT/ CPM Diagram or Precedence Diagram and Bar Chart with S-Curve, or other approved tools of project scheduling, and Cash Flow a RJIR ENTERPRISES / CIRCLE Z VENTURES AND DEVELOPMENT CORPORATION JOINT ZELDA V. OGARTO Authorized Managing Officer VENTURE) By. (c) Manpower Schedule (@) Equipment Utilization Schedule (€) Construction Safety and Health Program initially approved by the Head of the Procuring Entity (f) Contractor's All Risk Insurance (CARI) [ARIE L, DOCENA DATS In consideration of the payments to be made by the PROCURING ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTITY to execute and complete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT in all respects. mp ee g In) consideration of the execution and completion of the Works by the en JONTRACTOR, the PROCURING ENTITY hereby covenants to pay the EE NTRACTOR the unit prices in the CONTRACTOR’s Calculated Bid, as 38 applied to the actual quantities accomplished as certified by the PROCURING oz RY ENTITY under the provisions of this CONTRACT AGREEMENT, at the times 2g se and in the manner prescribed by this CONTRACT AGREEMENT. a2 fea DPWH-INFR-51-2016 Page 3 of 4

You might also like